ML20042F406
| ML20042F406 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/31/1989 |
| From: | Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20042F373 | List: |
| References | |
| NUDOCS 9005080287 | |
| Download: ML20042F406 (3) | |
Text
{{#Wiki_filter:. 4 ~ ~ OPERATING DATA REPORT DOCKET NO. 50-259 DATE DEC 89 PREPARED BY S.A.RATLIFF I TELEPHONE 205-729-2937 OPERATING-STATUS + 1'. Unit Name: BROWNS FERRY UNIT ONE r
- 2. Reporting period: DECEMBER, 1989 i
- 3. Licensed. Thermal Power (MWt): 3293
- 4. Nameplate; Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
-7. Maximum Dependable Capacity (Net MWe): 1065 a 8..If Changes Occur in Capacity Ratings (Items Number 3 [ Through 7) Since Last Report, Give Reason: N/A ~
- 9. Power Level To-which Restricted, If Any (Net MWe):.N/A
- 10. Reason For. Restrictions, If Any: N/A
-THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 744.0 8760 135224: l
- 12. Hours Reactor-Was Critical 0.0 0
59521 '13. Reactor Reserve Shutdown Hours 0.0 0 6997. L '14. Hours Generator On Line 0.0 0 58267 L ~15. Unit Reserve Shutdown Hours 0.0 0 0 i 16.~ Gross Thermal Generation-(MWh) 0.0 0 168066787 .17. Gross ~ Electric Generation (MWh) 0.0 0 55398130
- 18. Net Electric Generation (MWh)
-1445.0 -44782 53583088 0 ~19. Unit' Service Factor 0.0 0.0 43.1 r '20. Unit Availability Factor 0.0
- 0. 0 -
43.1 21.. Unit Capacity Factor (MDC Net) 0.0 0.0 37.2 '2 2. Unit. Capacity Factor (DER Net) 0.0 0.0 37.2 2 23.l Unit Forced Outage Rate 100.0 100.0 50.0 -24.' Shutdowns Scheduled Over Next 6 Month (Type,,Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined i
1 9005080287 900502 {DR ADOCK0500ggg9
m E 1 OPERATING DATA REPORT i DOCKET NO. 50-260 DATE DEC 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 ' OPERATING STATUS )
- 1. Unit Name:. BROWNS FERRY UNIT TWO
- 2. Reporting period: DECEMBER, 1989
- 3. l Licensed Thermal-Power (MWt) : 3293
'4,LNameplate Rating (Grosst MWe): 1152 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4 s
- 7. Maximum Dependable, Capacity (Net MWe): 1065 l
i 8. If Changes Occur'in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 29, Power Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A q
THIS YEAR-TO MONTH DATE CUMULATIVE ~
- 11. Hours In Reporting Period 744.0 8760-130111 l:
,12. Hours Reactor Was Critical 0.0 0 55860 j ~ -13.-Reactor Reserve Shutdown Hours 0.0 0 14200 i
- 14. Hours Generator on Line-0.0 O'
54338
- 15. Unit Reserve Shutdown Hours 0.0 0
0 16.EGross Thermal Generation (MWh) 0.0 0 153245167-
- 17. Gross Electric Generation (MWh) 0.0 0
50771798-
- 18. Net. Electric Generation' (MWh)
-6243.0 -44124 49114424 19.' Unit Service Factor 0.0 0.0 41.8 '20. Unit Availability Factor 0.0 0.0 41.8 21 -Unit Capacity Factor (MDC Net) 0.0 0.0-35.4
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 35.4
- 23. Unit Forced Outage Rate 100.0-100.0 49.9
' 24. Shutdowns Scheduled over Next 6 Month (Type, Date,'and Duration.of Each):
- 25. If, Shut Down At End Of Reporting Period, Estimated Date Of Startup: September 1989
a C y OPERATING DATA REPORT s DOCKET NO. 50-296 j DATE DEC.89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 1 OPERATING STATUS
- 1. Unit Name: BROWNS FERRY UNIT THREE 2.EReporting period: DECEMBER, 1989 13.' Licensed Thermal Power.(MWt): 3293
- 4. Nameplate Rating (Gross MWo): 1152 i
5. Design Electric Rating (Net MWe):'1065 6.' Maximum Dependable Capacity _(Gross MWe): 1098.4 '7. Maximum Dependable Capacity.(Net MWe): 1065 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A l l
- 9. Power Level To which Restricted, If Any (Net MWe): N/A
-{
- 10. Reason-For Restrictions, If Any: N/A
'I THIS YEAR-TO MONTH DATE CUMULATIVE ~ s -12.-Hours Reactor Was Critical 0.0-0 .45306 ' l 4 '11'.: Hours In Reporting Period 744.0'- 8760 .112536-
- 13. Reactor Reserve Shutdown Hours 0.0 0
5150 l
- 14. Hours Generator On Line 0.0 0
44195 5
- 15. Unit Reserve Shutdown Hours 0.0 0
0 -16. Gross Thermal Generation (MWh) 0.0 0 131868267
- 17. Gross-Electric Generation (MWh) 0.0 0
43473760
- 18. Net 1 Electric Generation (MWh)
-2173.0 -21897 41995033
- 19. Unit Service Factor 0.0 0.0 39.3 l
l
- 20. Unit Availability Factor 0.0 0.0 39.3 l
-21. Unit Capacity-Factor (MDC Net)- 0.0 0.0 35.0
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 35.0'
-23. Unit Forced Outage Rate 100.0 100.0 53.9 124.nshutdowns Scheduled Over Next 6 Month L (Type, Date, and Duration of Each): l' '25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined L 1 1 .A.}}