Forwards Request for Addl Info Per Response to Safety Evaluation Re Environ Qualification of TMI Action Plan Installed Equipment
ML20041D885
Person / Time
Site: Cooper 
Issue date: 02/22/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
TASK-***, TASK-TM TAC-42486, NUDOCS 8203090415
Download: ML20041D885 (3)


Text

Distribution:

FEBhuAM 2 ;f 1982 Docket File S. fiorris NRC PDR NSIC Local PDR ACRS-10 D. Eisenhut AE0D 0

C Docket No. 50-298 FHe N[ t U.CCDgg B. Siegel g,

Mr. J. M. P11 ant Director 7 e g_93 31S Licensing & Quality Assurance sk % ' % gge'. 12

/

Nebraska Public Power District P.O. Box 499 4

.b?
D Columbus, Nebraska 68601 (p/'g U f

Dear Mr. Pilant:

Subject:

Environmental Qualification of TMI Action Plan Equipment Installed Request for Additional Infomation RE: Cooper Nuclear Power Station We have completed a preliminary review of your response to our Safety Evaluation concerning the Environmental Qualification (EQ) of TMI Action Plan Equipment Installed. Our contractor (Franklin Research Center) has identified infomation contained in the enclosure which we need to complete our review.

For this purpose, any requested information that is in your EQ central file can be taken from that file and provided to our contractor.

Upon completion of the review the infomation will be returned to you for replacement.

We request that you supply this infomation to us within 30 days of the date of this letter.

Please send a full submittal to Franklin Research Center and a copy of the cover letter to us. The Franklin Research Center mailing address is:

Mr. Cyril J. Crane FFanklin Research Center The Parkway at Twentieth Street Philadelphia, Pennsylvania 19103 Address the letter to the Operating Reactors Branch. Please contact your Project Manager for further assistance in this regard.

This request for infomation was approved by the Office of Management and Budget under Clearance Number 3150-0065 which expires May 31, 1933.

Sincerely, Ort $nd SM I

8203090415 820222 Domenic B. Vassallo, Chief DR ADOCK 05000 p

Operating Reactors Branch #2 Division of Licensing

Enclosures:

,/

As stated d$7

. ee nex.t page ORB #2, ORB #2; ORB #2

..../.e. n.cl. :

S cc: w OFFICE >

.......g.3,.

SNorris BSiegeU,,

,DVassa87 llo sunnauc >

2N2782,,

2/iU82 7/s%7 oan y mc ronu ate oo-ec) uncu om OFFIClAL RECORD COPY ussano-sww

Mr. J..M. Pflant Nebraska Public Power District cc:

Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr. Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073

. Cooper Nuclear Station ATTN:

.Mr. L. Lessor Station Superintendent P. O. Box 98 Brownville, Nebraska 68321 Auburn Public Library 118 - 15th Street Auburn, Nebraska 68305 Mr. Dennis Dubois USNRC Resident Inspector P.O. Box 218 f

Brownville, NE 68321 John T. Collins Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

.a y

s RFI-C5257-500 FRC REVIEW OF INSTALLED 2 1 ACTION PLAN ITEMS B.

Date Received by FRC Information Requested Reference 2 does not provide adequate detail 1.

with respect to identification of M I Action Plan equipment installed after.1/1/81.

Identification of M I Action Plan a.

equipment installed with implementation dates after 1/1/81 is requested.

The correlation of these equipment items b.

with the specific applicable sections of NUREG-0737 [8] is requested.

(The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a m I Action Plan item, are the esble and I

terminal blocks associated with *he device also identified?)

For all installed MI Action Plan c.

equipment identified, a System Component Evaluation Worksheet (SCEW) (in accordance with 79-OlB format) is requested.

l l

The approximate installation date for the d.

M I Action Plan equipment items is f

requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.

The qualification documents, e.g., the actual 2.

test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified MI f

Action Plan equipment are requested.

(The j

identification of those reports considered to be proprietary is requested so that proper control of documents can te maintained.]

Where the Licensee has a standard Owners' 3.

Group position with respect to a NtTREG-0737 technical area or has requested extensions of implementation dates, this information la requested in order to incorporate it into the review.

O 2$ Frenidin Resear.ch C. enter A one.a e n r

.