Other: A830006, Identifies Proprietary Portions of Technical Evaluation Repts Re Safety Evaluation for Environ Qualification of safety-related Electrical Equipment,Per NRC, A830007, Comments on SER & Technical Evaluation Rept for Environ Qualification of safety-related Electrical Equipment Exposed to Harsh Environs,Per IE Bulletin 79-01B.Continued Safe Operation of Facility Reasonably Assured, A830014, Responds to 10CFR50.49(g), Environ Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants & NRC Requests.List of Equipment Important to Safety Encl, ML20010G270, ML20084H473, ML20107F870
|
MONTHYEARML20004E0271981-06-0808 June 1981 Safety Evaluation Re Environ Qualification of safety- Related Electrical Equipment.No Equipment Requiring Immediate Corrective Action Identified Project stage: Approval ML20004E0241981-06-0808 June 1981 Forwards Safety Evaluation & Technical Evaluation Rept Re Environ Qualification of safety-related Electrical Equipment.Requested Info Should Be Provided within 90 Days Project stage: Approval ML20010G2701981-09-0404 September 1981 Forwards Revision 2 to 801031 Response to IE Bulletin 79-01B, Environ Qualification of Electrical Equipment, as 90-day Response to NRC 810608 Safety Evaluation on Same Subj.All Concerns Addressed,Will Not Be Resolved by 820630 Project stage: Other ML20041D8851982-02-22022 February 1982 Forwards Request for Addl Info Per Response to Safety Evaluation Re Environ Qualification of TMI Action Plan Installed Equipment Project stage: Approval ML20028C0211982-12-20020 December 1982 Forwards SER & Proprietary & Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60). Proprietary Version Withheld Project stage: Approval ML20028C0281982-12-20020 December 1982 Safety Evaluation Re Environ Qualification of safety-related Electric Equipment.Licensee Must Provide Plans for Qualification or Replacement of Unqualified Equipment & Schedule for Proposed Corrective Action Project stage: Approval A830006, Identifies Proprietary Portions of Technical Evaluation Repts Re Safety Evaluation for Environ Qualification of safety-related Electrical Equipment,Per NRC1983-01-17017 January 1983 Identifies Proprietary Portions of Technical Evaluation Repts Re Safety Evaluation for Environ Qualification of safety-related Electrical Equipment,Per NRC Project stage: Other A830007, Comments on SER & Technical Evaluation Rept for Environ Qualification of safety-related Electrical Equipment Exposed to Harsh Environs,Per IE Bulletin 79-01B.Continued Safe Operation of Facility Reasonably Assured1983-01-24024 January 1983 Comments on SER & Technical Evaluation Rept for Environ Qualification of safety-related Electrical Equipment Exposed to Harsh Environs,Per IE Bulletin 79-01B.Continued Safe Operation of Facility Reasonably Assured Project stage: Other A830014, Responds to 10CFR50.49(g), Environ Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants & NRC Requests.List of Equipment Important to Safety Encl1983-05-20020 May 1983 Responds to 10CFR50.49(g), Environ Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants & NRC Requests.List of Equipment Important to Safety Encl Project stage: Other ML20151H8891983-10-0303 October 1983 Exemption from Schedular Requirements of 10CFR50.49 Re Environ Qualification of Electrical Equipment Project stage: Approval ML20084H4731984-03-22022 March 1984 Discusses Determination of Equipment within Scope of 10CFR50.49(b)(2).Components Added & Removed as Result of Internal Reviews by CNS Plant Engineering,Consultants & Further Engineering Studies Project stage: Other NLS8400127, Forwards Addl Info Resolving Open Items of SER Re Environ Qualification of safety-related Electrical Equipment. Proposed Resolution of Deficiencies Discussed During 840329 Meeting W/Nrc.Issuance of Sser Requested1984-04-24024 April 1984 Forwards Addl Info Resolving Open Items of SER Re Environ Qualification of safety-related Electrical Equipment. Proposed Resolution of Deficiencies Discussed During 840329 Meeting W/Nrc.Issuance of Sser Requested Project stage: Meeting ML20101M5881984-12-26026 December 1984 Responds to 841106 Request for Confirmation of Environ Qualification Justification for Continued Operation. Expenditure of Funds & Engineering Resources for Confirmation Unnecessary Because Plant in Major Outage Project stage: Request ML20107F8701985-02-15015 February 1985 Requests Extension of Deadline to 851130 for Environ Qualification of Electric Equipment,Per Generic Ltr 84-24. Delay Due to Lack of Vendor Documentation for Rewound Drive Motors.Justification for Continued Operation Encl Project stage: Other ML20215G3871986-10-0909 October 1986 Confirms Dates for Equipment Qualification Insp on 861027-31.Mgt Entrance Meeting Scheduled for 861027,plant Walkdown Insp of Equipment Planned for 861030 & Mgt Exit Meeting Tentatively Scheduled for 861031 Project stage: Meeting ML20215L1081986-10-20020 October 1986 Confirms Discussion Between J Jaudon,Re Ireland & G Horn Changing Dates of Equipment Qualification Insp at Plant from 861027-31 to 861103-07.Mgt Exit Meeting Tentatively Scheduled for 861107 at Plant Site Project stage: Meeting 1983-10-03
[Table View] |
Text
Distribution:
FEBhuAM 2 ;f 1982 Docket File S. fiorris NRC PDR NSIC Local PDR ACRS-10 D. Eisenhut AE0D 0
C Docket No. 50-298 FHe N[ t U.CCDgg B. Siegel g,
Mr. J. M. P11 ant Director 7 e g_93 31S Licensing & Quality Assurance sk % ' % gge'. 12
/
Nebraska Public Power District P.O. Box 499 4
- .b?
- D Columbus, Nebraska 68601 (p/'g U f
Dear Mr. Pilant:
Subject:
Environmental Qualification of TMI Action Plan Equipment Installed Request for Additional Infomation RE: Cooper Nuclear Power Station We have completed a preliminary review of your response to our Safety Evaluation concerning the Environmental Qualification (EQ) of TMI Action Plan Equipment Installed. Our contractor (Franklin Research Center) has identified infomation contained in the enclosure which we need to complete our review.
For this purpose, any requested information that is in your EQ central file can be taken from that file and provided to our contractor.
Upon completion of the review the infomation will be returned to you for replacement.
We request that you supply this infomation to us within 30 days of the date of this letter.
Please send a full submittal to Franklin Research Center and a copy of the cover letter to us. The Franklin Research Center mailing address is:
Mr. Cyril J. Crane FFanklin Research Center The Parkway at Twentieth Street Philadelphia, Pennsylvania 19103 Address the letter to the Operating Reactors Branch. Please contact your Project Manager for further assistance in this regard.
This request for infomation was approved by the Office of Management and Budget under Clearance Number 3150-0065 which expires May 31, 1933.
Sincerely, Ort $nd SM I
8203090415 820222 Domenic B. Vassallo, Chief DR ADOCK 05000 p
Operating Reactors Branch #2 Division of Licensing
Enclosures:
,/
As stated d$7
. ee nex.t page ORB #2, ORB #2; ORB #2
..../.e. n.cl. :
S cc: w OFFICE >
.......g.3,.
SNorris BSiegeU,,
,DVassa87 llo sunnauc >
2N2782,,
2/iU82 7/s%7 oan y mc ronu ate oo-ec) uncu om OFFIClAL RECORD COPY ussano-sww
Mr. J..M. Pflant Nebraska Public Power District cc:
Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr. Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073
. Cooper Nuclear Station ATTN:
.Mr. L. Lessor Station Superintendent P. O. Box 98 Brownville, Nebraska 68321 Auburn Public Library 118 - 15th Street Auburn, Nebraska 68305 Mr. Dennis Dubois USNRC Resident Inspector P.O. Box 218 f
Brownville, NE 68321 John T. Collins Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
.a y
s RFI-C5257-500 FRC REVIEW OF INSTALLED 2 1 ACTION PLAN ITEMS B.
Date Received by FRC Information Requested Reference 2 does not provide adequate detail 1.
with respect to identification of M I Action Plan equipment installed after.1/1/81.
Identification of M I Action Plan a.
equipment installed with implementation dates after 1/1/81 is requested.
The correlation of these equipment items b.
with the specific applicable sections of NUREG-0737 [8] is requested.
(The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a m I Action Plan item, are the esble and I
terminal blocks associated with *he device also identified?)
For all installed MI Action Plan c.
equipment identified, a System Component Evaluation Worksheet (SCEW) (in accordance with 79-OlB format) is requested.
l l
The approximate installation date for the d.
M I Action Plan equipment items is f
requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.
The qualification documents, e.g., the actual 2.
test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified MI f
Action Plan equipment are requested.
(The j
identification of those reports considered to be proprietary is requested so that proper control of documents can te maintained.]
Where the Licensee has a standard Owners' 3.
Group position with respect to a NtTREG-0737 technical area or has requested extensions of implementation dates, this information la requested in order to incorporate it into the review.
O 2$ Frenidin Resear.ch C. enter A one.a e n r
.