Nebraska Public Power District
"" "?$dokShhs^"*""
CNSS857088 February 15, 1985 Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATTN:
Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2
Dear Mr. Vassallo:
Subject:
10CFR50.49 Section (g), Request for Compliance Extension
Reference:
1)
Letter CNSS850033, L. G. Kuncl to D. B. Vassallo Dated January 28, 1985,
" Certification of Compliance to 10CFR50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants (Generic Letter 84-24) Docket No. 50-298. DPR-46 2)
Exemption from Schedular Rec,uirements of 10CFR50.49(g) Dated October 3,1983 As the District previously documented in Reference 1, all equipment important to safety located in harsh environments at Cooper Nuclear Station will be qualified or replaced prior to plant start-up from the current outage except for the Reactor Equipment Cooling (REC) Pump Drive Motors.
Due to the lack
)
of vendor documentation for the presently installed rewound drive motors, the four REC drive motors will be replaced; however, procurement lead time will result in the motors arriving on site no earlier than July 3,1985.
This date is beyond the plant start-up date of approximately June 1, 1985, and the required date for final environmental qualification specified in Reference 2.
With timely delivery of the motors, installation could be completed by November 15, 1985, while at power; therefore, in accordance with Section II of Reference 2 the District respectfully requests an extension of the deadline to November 30, 1985. Every effort will be made to improve on the above completion date.
p I
Li 8502260213 850215 N
DR p
ADOCK 05000298 O
L / g PDR k
~
D. G.. Eitenhut February 15, 1985 Page 2 -
The Justification for Continued Operation (JCO) is attached.
In accordance with 10CFR170.12(c) an application fee of $150 is enclosed.
Should you have any questions concerning the above, please contact my office.
Sincerely, kt Jay Pflant Technical Staff Manager Nuclear Power Group JMP/jdw:kc18/3
Attachment:
JCO for Reactor Equipment Cooling Pumps Drive Motors I
I e
i i:
1
[, f' JUSTIFICATION FOR CONTINUED OPERATION i
Reactor Equipment Cooling (REC) Pumps Drive Motors Component ID: CIC; REC-MOT-RECPA, REC-MOT-RECPB, REC-MOT-RECPC, REC-MOT-RECPD
==
Description:==
Drive Motor for REC Punps 5
Safety Function:
The safety objective of the Reactor Equipment' Cooling System (also known as the Reactor Building Closed Cooling Water System) is to provide cooling to the Core Standby Cooling Systems areas and the RHR Pumps.
Cause and Effect:
The environmental qualification documentation for the rewinding of the REC Pump Motors could not be provided by the vendor; therefore, the motors cannot be qualified to IEEE 323-1974 Standards.
Justificiation for Continued Operation:
The purpose of the REC System is to provide cooling to critical and non-critical potentially contaminated components located in the Reactor Building and Radwaste Building.
The REC system functions to separate the potentially contaminated loads from the service water which provides secondary cooling to the tube side of the heat exchanger. The system consists of (4) Horizontal Centrifugal Type, 1350 gpm Design Capacity Pumps with (4) 75 HP Pump Motors.
The system is designe'd with sufficient redundancy so that no single system' component failure can prevent the system objective.
In the highly unlikely event that one of the pump motor windings fail and renders that pump inoperable, a
the REC System has sufficient redundancy in two independent loops which can be interconnected through-crossties, equipped with isolation: valves.co provide-adequate cooling.
In addition,'any common failure of the REC Pumps would not necessarily. create a safety..
~
l 3-problem due - to ' the. availability of a seismically
' qualified backu'p system (Service Water. System). The U
service water pumps are f located outside of the potentially.'. harsh -environment of the -Reactor x
- Building,- (Reference USAR X.8.1.5 and ~ Burns & ' Roe Drawings 2031 : and ' 2036)..For the; Service Water System-to.be necessary all four. REC Pumps 1must failL Jsince only one-is needed'and the: RECcloops:can-be.
interconnected (USAR Section X-6 verifies heat load
~
io
. capacity <with only one-REC Pump: operable).
,There'is-no interim' concern for safety based on'th' preceding discussion.. The -current plan to resolve the qualification-deficiency fortthe. REC Pump Motors is to replace the. REC.' Pump Motors with IEEE 323-1974-qualified Fump Motors that Thave the. required '
-documentation.- This' activity will be completed prior
..to November.30, 1985.
7
~
,