MONTHYEARML19253B5781979-10-10010 October 1979 Forwards Steam Generator Compartment Structural Drawings Per 790808 Request.Drawings for Oconee Will Be Submitted by 791031.Drawings Available in Central Files Project stage: Request ML19257A7481979-12-24024 December 1979 Forwards Emergency Plan,In Response to NRC ,& Reg Guide 1.101.Document Contains Info Protected Under Privacy Act Project stage: Other ML19296B7791980-02-19019 February 1980 Forwards Revised Mods to Upgraded Emergency Plan.No Further Revisions Anticipated Before 800310 Site Visit Project stage: Other ML16138A4341980-04-0202 April 1980 Summary of 800222 Meeting W/B&W Owners Group in Bethesda,Md Re Abnormal Transient Operational Guidelines Project stage: Request ML19323C9321980-05-12012 May 1980 Forwards Revised Draft Emergency Plan.Plan Submitted Before Internal Review to Meet 5-wk Deadline.Comments on NUREG-0654 Criteria.Table 4-3 Provides Current Estimates of Manpower & Response Times & Are Felt to Be Realistic & Appropriate Project stage: Draft Other ML20009A2011981-06-30030 June 1981 Requests Exemption from Requirements of Section IV.D.3 of App E to 10CFR50 Re Implementation of Facility Early Warning Sys by 810701.Both Tone Alert & Siren Equipment Will Be Received,Installed & Activated by 820301 Project stage: Other ML20010A7381981-07-24024 July 1981 Responds to Requesting Confirmation That Prompt Notification Sys for Plant Had Been Implemented.Detailed Engineering of Sys Will Begin Upon Acceptance of Wyle Labs Rept Project stage: Other ML20040D6441981-09-30030 September 1981 Informs of Tentative Date of 820317 for Full Field Exercise of Facility Emergency Plan.Participants Will Include Util, Counties of Amador,Sacramento & San Joaquin & State of CA Project stage: Other ML20038B1251981-11-0505 November 1981 Notice of Violation from Insp on 810622-26 & 0702 Project stage: Other ML20039G8031982-01-13013 January 1982 Requests Implementation of Schedule for Supplying Emergency Preparedness Exercise Info to Nrc.Milestones & Info to Be Submitted Detailed Project stage: Other ML20040D6421982-01-18018 January 1982 Requests Exemption from 10CFR50.54(s)(2) & App E(F) Requirements to Hold full-scale Exercise Prior to 820401. Exercise Scheduled for 820623 W/Counties,Fema & Region 5 Participating Project stage: Other ML20040C8301982-01-21021 January 1982 Informs of Inherent Problem Discovered w/4-wire Emergency Notification Sys Telephone Circuit. Lockup Occurs If Receiver Picked Up Before Circuit Light Goes Off After Use. Preventive Measures Should Be Used Until Equipment Modified Project stage: Other ML20054E9871982-05-21021 May 1982 Informs of Delays in Schedule to Distribute Public Info Brochure Designed to Satisfy Guidance of NUREG-0654 FEMA-REP-1,Rev 1,Item G.1 Per IE Insp Rept 50-312/81-22. Brochure to Be Distributed by 820701 Project stage: Other ML20054J0061982-06-10010 June 1982 Responds to 820118 Request for Exemption from 10CFR50, App E,Section IV.F.1.a,changing Date of full-scale Emergency Preparedness Exercise from 820317 to 820623. Request Granted Project stage: Approval ML20263S5691983-03-31031 March 1983 Training & Storage Building Remodeling. Sheet 2 of 3.No Drawing Date Project stage: Other ML20024A4941983-06-13013 June 1983 Ack Receipt of 830105 & 0201 Changes to Emergency Plan Implementing Procedures.Changes Do Not Decrease Effectiveness of Emergency Response Planning Project stage: Other ML20024E3321983-07-15015 July 1983 Responds to NRC Re Emergency Preparedness Deficiencies.Corrective Action Plan Per 10CFR50.54 Encl Project stage: Other ML20024E3281983-08-0303 August 1983 Telecopy of Suppl to 830715 Response to NRC Re Emergency Preparedness Deficiencies.Outline of Training Modules for Emergency Plan Implementing Procedures Encl Project stage: Other ML20024E0651983-08-0303 August 1983 Requests Implementation of Encl Schedule for Supplying Emergency Preparedness Exercise Info to NRC & FEMA Project stage: Other ML20024E3231983-08-0505 August 1983 Ack Receipt of 830715 & 0803 Ltrs Informing NRC of Steps to Correct Emergency Preparedness Deficiencies Noted in NRC Project stage: Other 1982-01-13
[Table View] |
Text
__
2
?
O 5
/
A
.c r
cv v
u--
,e r
January 13, 1982 h
p A
I Occket No. 50-312 t
MCEiVED
.4 p' ne m,y 37gg J4n y)
Sacramento Municipal Utility District P. O. Box 15830 h'pff3 Sacramento, California 95813 y
Attention: Mr. John J. Mattimoe
/,
Assistant General Manager
Gentlemen:
SUBJECT:
EMERGENCY PREPAREDNESS EXERCISES I
As you are aware, the revised emergency planning rule published August 19, 1980, requires that emergency preparedness be upgraded and maintained at and around nuclear power plants. Part of the maintenance process is a requirement in Sections IV.F.1 and 3 of Appendix E,10 CFR Part 50, for periodic exercises, some of which must include offsite participation. In addition, a fullscala j
exercise must be conducted before any new license can be granted. The NRC will provide observers for the onsite' aspects of.these exercises and will review the proposed scenarios.
Although we originally believed that the two weeks prior to an exercise would provide sufficient time for us to review a scenario for adequacy (1) in terms of scope (testing of major areas of response) and (2) in tems of response for major porticns of offsite plans; we now recognize that this anount of time is not adequate to ensure a proper review and any required coordination. Therefore, we are requesting you implement the following l
schedule for supplying exercise information to the NRC.
Period in Advance of Exercise Information to be Submitted 75 days Description of scope of exercise and objectives to be fulfilled 45 days Detailed description of exercise scenaric and anticipated licensee actions 20 days Complete controller / prompter packages which contain the information to be supplied to the observers for the exercise along with that supplied to 9::01190160 820113 the exercise players as the scenario PDR ADOCK 05000312 is unfolded.
./
F PDR
"*' N... RV/ dot,,,,
. I..
..!.... 7t.O.........I I
.j,b8 8 v
sue <M"" FISH-K$.
WENSL WSKI hii
$ PENCER ENGELKEN.
i "T/ff/62""T/f3/82" ' "
T/[f/55" ' " "' ' ' "" ""ll.'..'..
m,y 1/D/82" "T/1378T '
.............l....
i...
c m - m.,o.ei oc" ono OFFICIAL RECOFLD COPY
'usSe mo-m u.
1
e
, Sacramento Municipal Utility District.
Since planning must occur well in advance of the exercise date se as to provide time for necessary coordination with State and local governmental agencies, we do not believe meeting this schedule will be an added burden.
l This schedule should also provide for the maximum number of objectives being attained by all participating parties.
l The information should be mailed to the Regional Administrator, USNRC, Region V, i
I at the above address. A copy of the first two items only should be sent to Brian K. Grimes, Director, Division of Emergency Preparedness Office of Inspection and Enforcement U. S. f!uclear Regulatory Commission, Washington, D.C. 20555. For those licensees whose exercise is scheduled to occur sooner than the above time scale, please provide Mr. Ray Fish (415-943-3761) of this office with a schedule for submission of the requested information as soon as possible.
This request for information has been approved under OMS Clearance No. 0150-0011 which expires April 30, 1982.
Sincerely.
Crity.at 11gnea t, R. M. Engenen R. H. Engelken Regional Administrator k