Requests Exemption from Requirements of Section IV.D.3 of App E to 10CFR50 Re Implementation of Facility Early Warning Sys by 810701.Both Tone Alert & Siren Equipment Will Be Received,Installed & Activated by 820301
ML20009A201
Person / Time
Site: Rancho Seco
Issue date: 06/30/1981
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Stolz J
Office of Nuclear Reactor Regulation
References
TASK-3.A.2.1, TASK-TM TAC-46265, NUDOCS 8107090202
Download: ML20009A201 (9)


Text

-:5 a

J._.,

y

-+

. = - - - - -

o

~

o suun

, SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830. Sacramento, Cahfornia 95813; (916) 452 3211 June 30, 1981

-@hp v-kD $

9 DIRECTOR OF NUCLEAR REACTOR REGULATION 9' h B p@ " I

% p0 co ATTENTION JOHN F STOLZ CHIEF ji OPERATING REACTORS BRANCH 4 e

U S NUCLEAR REGULATORY COMMISSION D

S-

~,

WASHINGTON DC 20555 O>.

V' W.

DOCKET 50-312 i

RANCHO SECO NUCLEAR GENERATING STATION UNIT NO 1 TMI ACTION PLAN ITEM III.A.2 On March 27, 1981, the Sacramento Municipal Utility District requested an exemption from Section (s) (2) of 10 CFR 50.54.

(We erroneously referred to Section (q) (2) in that submittal.) As discussed in that submittal, the District's Emergency Procedures are in effect, however, State and Local plans have not been implemented at this time. We also stated in this aubmittal that additional requirements above those in Appendix E of 10 CFR 50 had been imposed by the State of California and that the local emergency plans could not be implemented until submitted to the State Legislature and approved by statute.

Since that time, we have determined that the Emergency Planning Zones required by Federal regulation can be implemented by a local government without State legis-lative approval. Therefore, that exemption is needed only until the implementation of local county plans now expected to occur by the end of this year.

In addition to the exemption requested in our March 27, 1981 letter, the District is hereby requesting an exemption from the requirements of Section IV.D.3 of Appendix E to 10 CFR Part 50.

This requirement states that by July 1, 1981, we should have the capability for notification of the public within the plume exposure pathway within fifteen (15) minutes.

In June of 1980, District staff began soliciting proposals from qualified engineering firms for the design of the Rancho Seco Nuclear Generating Station Early Warning System.

By October, 1980, Wyle Laboratories of ON El Segundo, California, had been selected. Wyle initiated their work with the signing of a contract on November 11, 1980.

j Their scope of work included:

/o

1) Obtaining site specific data which could affect system design,
2) Designing and siting a siren system for the 10-mile radius,
3) Conducting design meetings with the three affected counties and the District, and 8107090202 810630

PDR ADOCK 05000312?

P PpR) m, n,,

g m,e

% ni 4 8 im im 9 i e, m ooi o oioer

e e

JOHN F STOLZ Page 2 June 30, 1981

4) Preparing a final design report which would include the technict1 bid specifications for the system.

Wyle issued a draft report entitled, " Preliminary Design of Prompt Notification" in January,1981. Based on comments from the Counties and MdUD's Management Safety Review Committee, the Wyle contract scope was modified to specify additional work on alternatives cost / benefit analysis, design and siting criteria, environmental impact assessment, system maintenance and system activation alternatives.

A final system design was agreed to by all parties in late May, 1981.

Exact siting and purchase / installation specifications were completed in mid June. A siren equipment purchase request and a California Environ-mental Quality Act Initial Study with Negative Declaration will be issued in early August.

The tone alert equipment purchase request will be issued by August, 1981.

It is currently anticipated that both the tone alert and siren equipment will be received, installed, and activated by March 1, 1982.

? LL M r.i

/John J. Mattimoe Assistant General Manager and Chief Engineer l

l d