MONTHYEARML19253B5781979-10-10010 October 1979 Forwards Steam Generator Compartment Structural Drawings Per 790808 Request.Drawings for Oconee Will Be Submitted by 791031.Drawings Available in Central Files Project stage: Request ML19257A7481979-12-24024 December 1979 Forwards Emergency Plan,In Response to NRC ,& Reg Guide 1.101.Document Contains Info Protected Under Privacy Act Project stage: Other ML19296B7791980-02-19019 February 1980 Forwards Revised Mods to Upgraded Emergency Plan.No Further Revisions Anticipated Before 800310 Site Visit Project stage: Other ML16138A4341980-04-0202 April 1980 Summary of 800222 Meeting W/B&W Owners Group in Bethesda,Md Re Abnormal Transient Operational Guidelines Project stage: Request ML19323C9321980-05-12012 May 1980 Forwards Revised Draft Emergency Plan.Plan Submitted Before Internal Review to Meet 5-wk Deadline.Comments on NUREG-0654 Criteria.Table 4-3 Provides Current Estimates of Manpower & Response Times & Are Felt to Be Realistic & Appropriate Project stage: Draft Other ML20009A2011981-06-30030 June 1981 Requests Exemption from Requirements of Section IV.D.3 of App E to 10CFR50 Re Implementation of Facility Early Warning Sys by 810701.Both Tone Alert & Siren Equipment Will Be Received,Installed & Activated by 820301 Project stage: Other ML20010A7381981-07-24024 July 1981 Responds to Requesting Confirmation That Prompt Notification Sys for Plant Had Been Implemented.Detailed Engineering of Sys Will Begin Upon Acceptance of Wyle Labs Rept Project stage: Other ML20040D6441981-09-30030 September 1981 Informs of Tentative Date of 820317 for Full Field Exercise of Facility Emergency Plan.Participants Will Include Util, Counties of Amador,Sacramento & San Joaquin & State of CA Project stage: Other ML20038B1251981-11-0505 November 1981 Notice of Violation from Insp on 810622-26 & 0702 Project stage: Other ML20039G8031982-01-13013 January 1982 Requests Implementation of Schedule for Supplying Emergency Preparedness Exercise Info to Nrc.Milestones & Info to Be Submitted Detailed Project stage: Other ML20040D6421982-01-18018 January 1982 Requests Exemption from 10CFR50.54(s)(2) & App E(F) Requirements to Hold full-scale Exercise Prior to 820401. Exercise Scheduled for 820623 W/Counties,Fema & Region 5 Participating Project stage: Other ML20040C8301982-01-21021 January 1982 Informs of Inherent Problem Discovered w/4-wire Emergency Notification Sys Telephone Circuit. Lockup Occurs If Receiver Picked Up Before Circuit Light Goes Off After Use. Preventive Measures Should Be Used Until Equipment Modified Project stage: Other ML20054E9871982-05-21021 May 1982 Informs of Delays in Schedule to Distribute Public Info Brochure Designed to Satisfy Guidance of NUREG-0654 FEMA-REP-1,Rev 1,Item G.1 Per IE Insp Rept 50-312/81-22. Brochure to Be Distributed by 820701 Project stage: Other ML20054J0061982-06-10010 June 1982 Responds to 820118 Request for Exemption from 10CFR50, App E,Section IV.F.1.a,changing Date of full-scale Emergency Preparedness Exercise from 820317 to 820623. Request Granted Project stage: Approval ML20263S5691983-03-31031 March 1983 Training & Storage Building Remodeling. Sheet 2 of 3.No Drawing Date Project stage: Other ML20024A4941983-06-13013 June 1983 Ack Receipt of 830105 & 0201 Changes to Emergency Plan Implementing Procedures.Changes Do Not Decrease Effectiveness of Emergency Response Planning Project stage: Other ML20024E3321983-07-15015 July 1983 Responds to NRC Re Emergency Preparedness Deficiencies.Corrective Action Plan Per 10CFR50.54 Encl Project stage: Other ML20024E3281983-08-0303 August 1983 Telecopy of Suppl to 830715 Response to NRC Re Emergency Preparedness Deficiencies.Outline of Training Modules for Emergency Plan Implementing Procedures Encl Project stage: Other ML20024E0651983-08-0303 August 1983 Requests Implementation of Encl Schedule for Supplying Emergency Preparedness Exercise Info to NRC & FEMA Project stage: Other ML20024E3231983-08-0505 August 1983 Ack Receipt of 830715 & 0803 Ltrs Informing NRC of Steps to Correct Emergency Preparedness Deficiencies Noted in NRC Project stage: Other 1982-01-13
[Table View] |
Text
-:5 a
J._.,
y
-+
. = - - - - -
o
~
o suun
, SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830. Sacramento, Cahfornia 95813; (916) 452 3211 June 30, 1981
-@hp v-kD $
9 DIRECTOR OF NUCLEAR REACTOR REGULATION 9' h B p@ " I
% p0 co ATTENTION JOHN F STOLZ CHIEF ji OPERATING REACTORS BRANCH 4 e
U S NUCLEAR REGULATORY COMMISSION D
S-
~,
WASHINGTON DC 20555 O>.
V' W.
DOCKET 50-312 i
RANCHO SECO NUCLEAR GENERATING STATION UNIT NO 1 TMI ACTION PLAN ITEM III.A.2 On March 27, 1981, the Sacramento Municipal Utility District requested an exemption from Section (s) (2) of 10 CFR 50.54.
(We erroneously referred to Section (q) (2) in that submittal.) As discussed in that submittal, the District's Emergency Procedures are in effect, however, State and Local plans have not been implemented at this time. We also stated in this aubmittal that additional requirements above those in Appendix E of 10 CFR 50 had been imposed by the State of California and that the local emergency plans could not be implemented until submitted to the State Legislature and approved by statute.
Since that time, we have determined that the Emergency Planning Zones required by Federal regulation can be implemented by a local government without State legis-lative approval. Therefore, that exemption is needed only until the implementation of local county plans now expected to occur by the end of this year.
In addition to the exemption requested in our March 27, 1981 letter, the District is hereby requesting an exemption from the requirements of Section IV.D.3 of Appendix E to 10 CFR Part 50.
This requirement states that by July 1, 1981, we should have the capability for notification of the public within the plume exposure pathway within fifteen (15) minutes.
In June of 1980, District staff began soliciting proposals from qualified engineering firms for the design of the Rancho Seco Nuclear Generating Station Early Warning System.
By October, 1980, Wyle Laboratories of ON El Segundo, California, had been selected. Wyle initiated their work with the signing of a contract on November 11, 1980.
j Their scope of work included:
/o
- 1) Obtaining site specific data which could affect system design,
- 2) Designing and siting a siren system for the 10-mile radius,
- 3) Conducting design meetings with the three affected counties and the District, and 8107090202 810630
PDR ADOCK 05000312?
P PpR) m, n,,
g m,e
% ni 4 8 im im 9 i e, m ooi o oioer
e e
JOHN F STOLZ Page 2 June 30, 1981
- 4) Preparing a final design report which would include the technict1 bid specifications for the system.
Wyle issued a draft report entitled, " Preliminary Design of Prompt Notification" in January,1981. Based on comments from the Counties and MdUD's Management Safety Review Committee, the Wyle contract scope was modified to specify additional work on alternatives cost / benefit analysis, design and siting criteria, environmental impact assessment, system maintenance and system activation alternatives.
A final system design was agreed to by all parties in late May, 1981.
Exact siting and purchase / installation specifications were completed in mid June. A siren equipment purchase request and a California Environ-mental Quality Act Initial Study with Negative Declaration will be issued in early August.
The tone alert equipment purchase request will be issued by August, 1981.
It is currently anticipated that both the tone alert and siren equipment will be received, installed, and activated by March 1, 1982.
? LL M r.i
/John J. Mattimoe Assistant General Manager and Chief Engineer l
l d