Comments on Re Radwaste Solidification Sys.Waste Solidification Process Control Program Should Be Developed & Implemented to Assure Solidified Solid Waste Reaches Licensed Burial Site in Acceptable Form
ML20027D639
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/04/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Dietch R
SOUTHERN CALIFORNIA EDISON CO.
References
LSO5-82-11-013, LSO5-82-11-13, TAC-57811, TAC-57812, NUDOCS 8211080189
Download: ML20027D639 (3)


Text

%

G

?

^

w November 4, 1982 DISTRIBUTION Dockets NRC PDR L cal PDR Docket No. 50-206 LS05-82-11-013 N C DCrutchfield HSmith WPaulson Mr. R. Dietch HRood Vice President WGammill Nuclear Engineering and Operations OELD Southern California Edison Company ELJordan 2244 Walnut Grove Avenue Post Office Box 800 JMTaylor Rosemead, California 91770 (10)

Dear Mr. Dietch:

SUBJECT:

RADWA5TE SOLIDIFICATION SYSTEM - SAN ONOFRE UNIT NO. 1 Your letter dated October 5,1982 stated that it is your intention to move the Chem-Nuclear mobile cement solidification unit to San Onofre Unit No.1 from its present location at San Onofre Units 2 and 3 for the purpose of solidifying wet solid radwaste (resins) produced at San Onofre Unit No. 1.

Your letter stated that prior to placing the solid-ification system in operation, you will perform a 10 CFR 50.59 safety evaluation in accordance with the regulations to assure that use of this system does not involve an unreviewed safety questions or a change to the Technical Specifications; otherwise, you will obtain NRC approval prior to utilizing tha system.

Based on a review of your letter, the NRC staff concludes that a waste soldification Process Control Program (PCP) for this process for San Onofre Unit No. I should be developed and implemented to assure that the solidified solid waste reaches the licensed burial site in an acceptable form. A suitable interim alternative to the PCP would be to require that each drum be inspected before shipment to assure that solidification has been achieved.

We also note that the NRC staff has under review the waste solidification Process Control Program for San Onofre Unit No. 2 and that in ac-cordance with license condition 2.C(16) for San Onofre Unit No. 2. " Wet solid radwaste shall not be shipped from the facility (San Onofre Nuclear Generating Station Unit No. 2) until the NRC has approved the waste solid-ification Process Control Program." The results of our evaluation will be documented in a separate letter.

gC[

8211080189 821104 l$gUW 8,)

Q.) Sincerely, PDR ADOCK 05000206 P

ppg tt$

O

  • Please see previous coiggrencd page,riginal signed by/

i OFFICE)

  1. 5...

...DL:LBM.... y @..yU)

Dennis M. Crutchfield, Chief SURNAMEh

....h.k..k.

f

. HRo,o,d*

,,Q,(qd,d,y,@.(.0perating" Reactors-Branch" 6..D

.D Division..of..L cen s.i n g...............M

.l... 0.Ct

.d

...u.:..d.'.R...

..111.V.f....

...19/1@.2....y/..g/.8.2.....

om>

cc: See......t...............

I nex oaae wac ronu m po-aq uacu oaa OFFICIAL RECORD COPY usa m e -su eo

h.

~

DISTRIBUTION Docket D

Docket No. 50-206 DR ORB Reading NSIC DCrutchfield HSmith Mr. R. Dietch WPaulson Vice President HRood Nuclear Engineering and Operations a

Southern California Edison Company 2244 Walnut Grove Avenue ELJordan Post Office Box 800 Rosemead, California 91770 R

SEPB

Dear Mr. Dietch:

SUBJECT:

RADWASTE SOLIDIFICATION SYSTEM - SAN ONOFRE UNIT NO. 1 Your letter dated October 5,1982 stated that it is your intention to move the Chem-Nuclear mobile cement solidification unit to San Onofre Unit No.1 from its present location at San Onofre Units 2 and 3 for the purpose of solidifying wet solid radwaste (resins) produced at San Onofre Unit No. 1.

Your letter stated that prior to placing the solid-ification system in operation, you will perform a 10 CFR 50.59 safety evaluation in accordance with the regulations to assure that use of this system does not involve an unreviewed safety question or a change to the Technical Specifications; otherwise, you will obtain NRC approval prior to utilizing the system.

Based on a review of your letter, the NRC staff concludes that a waste solidification Process Control Program for this process for San Onofre Unit No. I should be developed and implemented to assure that the solidified solid waste will be dry when it reaches the licensed burial site.

We also note that the NRC staff has under review the waste solidification Process Control Program (PCP) for San Onofre Unit No. 2 and that in ac-cordance with license condition 2.C(16) for San Onofre Unit No. 2 " Wet solid radwaste shall not be shipped from the facility (San Onofre Nuclear Generating Station Unit No. 2) until the NRC has approved.the waste solid-ificaion Process Control Program." The results of our evaluation will be documented in a separate letter.

Sincerely, Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

.............?.e ne3,tpage DL

,5,,,,

DL:L8#

DSI:ETSB DL : 0R B(5,,,,, '

CC: S omca>

cu m us>

.W.P.A... An.;ah..11890

.WGamJ.11.......acrutchf.ield

.10&. /82....... 10

/82...... 10 /...../.82......104... 482.......

om>

OFFICIAL RECORD COPY usso m - m em NRC FORM 318 (10-80) NRCM 0240

6 Mr. R. Dietch November 4, 1982 cc Charles R. Kocher, Assistant General Counsel James Beoletto, Esquire Southern California Edison Company Post Office Box 800 Rosemead, California 91770 David R. Pigott Orrick, Herrington & Sutcliffe 600 Montgomery Street San Francisco, California 94111 Harry B. Stoehr San Diego Gas & Electric Company P. O. Box 1831 Gan Diego, California 92112 Resident Inspector / San Onofre NPS c/o U. S. NRC P. O. Box.4329 San Clemente, California 92672 Mayor City 'dr~ San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:

Chief, Environmental Radiation Control Unit Radiological Health Section.

714 P Street, Room 498 Sacramento, California 95814 U. S. Environmental Protection Agency Region IX Office ATTN:

Regional Radiation Representative f

215 Freemont Street San Francisco, California 94111 Robert H. Engelken, Regional Administrator Nuclear Regulatory Commission, Region V 1450 Maria Lane Walnut Creek, California 94596

-,y.,..

y-_y

_ _ _