Letter Sequence Other |
|---|
|
|
MONTHYEARML20032D3411981-10-20020 October 1981 Process Control Program for Chemical-Nuclear Sys,Inc Cement Solidification Units Project stage: Other ML20038A6591981-11-0909 November 1981 Nonproprietary Version of Solidification Sys Project stage: Other ML13323A1741981-11-10010 November 1981 Forwards Proprietary & Nonproprietary Version of Process Control Program for Chem-Nuclear Sys,Inc Cement Solidification Units, Per Amend 21 to FSAR Section 11.4. Proprietary Version Withheld (Ref 10CFR2.790).W/affidavit Project stage: Other ML13310A3731981-12-11011 December 1981 Approves 811110 Request for Withholding Process Control Program for Cnsi Cement Solidification Units (SD-OP-003) Per 10CFR2.790 Project stage: Other ML13310A4261982-05-26026 May 1982 Forwards Request for Addl Info Re Waste Solidification Process Control Program to Complete Review Project stage: RAI ML13308A1911982-10-0505 October 1982 Summary of 820906-09 Meeting W/Util in Anaheim,Ca Re Natural Circulation Test Conducted at Low Power.Trip Rept Encl Project stage: Request ML13317A3551982-10-0505 October 1982 Discusses Use of Radwaste Solidification Sys.Unit 2 License Condition Does Not Prevent Util from Using Chem-Nuclear Sys, Inc Process to Solidify Wet Solid Radwaste Produced at Unit 1.Safety Evaluation Will Be Performed Project stage: Other ML20027D6391982-11-0404 November 1982 Comments on Re Radwaste Solidification Sys.Waste Solidification Process Control Program Should Be Developed & Implemented to Assure Solidified Solid Waste Reaches Licensed Burial Site in Acceptable Form Project stage: Other ML13310B2781984-03-0202 March 1984 Forwards Program Description for Waste Classification & Form to Be Used to Implement 10CFR61 & 10CFR20.311 Requirements Re Land Disposal of Radwaste & Stds for Protection from Radiation Project stage: Other ML13308A3491984-04-11011 April 1984 Notification of 840413 Meeting W/Util in Bethesda,Md to Discuss Process Control Program Project stage: Meeting ML13305A5711984-04-24024 April 1984 Provides Authorization for Shipment of Wet Solid Radwaste Until Review of Process Control Program Complete Project stage: Approval ML13329A4811984-10-17017 October 1984 Rev 0 to Health Physics Procedure SO1-VII-8.5.1, Process Control Program Project stage: Other ML13324A4721984-11-0202 November 1984 Forwards Rev 0 to Health Physics Procedure SO1-VII-8.5.1, Process Control Program. Applicable Documents Reviewed & Approved by NRC Listed Project stage: Other ML13324A5321984-12-27027 December 1984 Informs That Preliminary Review of Process Control Program (PCP) Completed.Pcp Acceptable for Use on Interim Basis. Interim Approval Continued Until Final Review of PCP Completed Project stage: Approval ML13324A6331985-04-22022 April 1985 Safety Evaluation Supporting Util Use of Process Control Program W/Tech Spec 6.16 Project stage: Approval ML13324A6311985-04-22022 April 1985 Forwards Safety Evaluation Supporting Util Use of Process Control Program as Referenced in Tech Spec 6.16 Project stage: Approval ML13309B5331985-05-0101 May 1985 Advises That Chem-Nuclear,Inc Replaced by Nuclear Packaging, Inc as Vendor of Wet Radwaste Treatment Svcs.Nuclear Packaging,Inc Will Dewater Wet Radwaste for Shipment,Per TP-02-NP.Approval Requested by 850601 Project stage: Other ML13324A6651985-06-0303 June 1985 Special Rept Providing Status of Change in Radwaste Solidification Sys.Solid Radwaste Sys Contract w/Chem-Nuclear,Inc expired.Chem-Nuclear Replaced by Nuclear Packaging,Inc Project stage: Other ML13309B5481985-06-11011 June 1985 Grants Interim Authorization to Proceed W/Dewatering of Spent Resin Per Rev 0 to Nupac Operations & Maint Procedure OM-17 & Rev 1 to Health Physics Procedure SO23-VII-8.5.1. Review of Nuclear Packaging TP-02-NP Continuing Project stage: Approval ML13308A8831985-07-24024 July 1985 Submits Addl Info Re Rev 0 to Topical Rept TP-04,per 850724 Telcon.Portable Solidification Unit Currently Under Contract for Waste Solidification,On Demand Svc Basis,At Facilities. Completion of Rept Review Requested within 60 Days Project stage: Other ML13324A6931985-08-0909 August 1985 Requests Approval to Use Pacific Nuclear Svcs,Inc in Place of Chem-Nuclear Sys,Inc for Solidification & Encapsulation of Wet Radwaste.Nrc Approval Needed by 851101 Because Potential Burial Site Limitations Take Effect in 1986 Project stage: Other 1984-12-27
[Table View] |
Text
Southern California Edison Company a 0 23 SAN ONOFRE NUCLEAR GENERATING STATION P..BOX 128 SAN CLEMENTE, CALIFORNIA 92672 J.
G.
AYNESTELEPHONE STATION MANAGER June 3, 1985 17141 492-7700 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. J. B. Martin, Regional Administrator
Dear Sir:
Subject:
Docket Nos. 50-206, 50-361 and 50-362 Special Report -
Status Report San Onofre Nuclear Generating Station, Units 1, 2 and 3 Pursuant to Section 6.9.2 of Appendix A, Technical Specifications to Operating Licenses NPF-10 and NPF-15 for San Onofre Units 2 and 3, respectively, this submittal provides the required 30-Day Special Report on the status of a change in the radwaste solidification system.
On April 1, 1985, the solid radwaste system contract expired between Chem-Nuclear, Inc., the previous vendor of NRC approved solidification services for San Onofre Units 1, 2 and 3, and SCE. SCE replaced Chem-Nuclear, Inc.
with Nuclear Packaging Inc. (NuPac), who is in the process of receiving NRC approval of their solidification process, for solidification services at San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3.
NuPac's topical report, TP-02-NP, which addresses their radwaste process, was submitted for NRC review in August 1984. NuPac will dewater wet radwaste at SONGS for shipment in high integrity containers in accordance with this topical report. Until NRC approval has been received, no wastes have been or will be processed. NRC approval is considered imminent.
8507090226 850603 PDR ADOCK 05000206 S
PDR
Mr. J..
June 3, 1985 If you require any additional information, please so advise.
Sincer ly, cc:
F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)
A. J. D'Angelo (USNRC Resident Inspector, Unit 1)
J. P. Stewart (USNRC Resident Inspector, Units 2 and 3)
Nuclear Regulatory Commission Document Control Desk