Letter Sequence Other |
|---|
|
|
MONTHYEARML20032D3411981-10-20020 October 1981 Process Control Program for Chemical-Nuclear Sys,Inc Cement Solidification Units Project stage: Other ML20038A6591981-11-0909 November 1981 Nonproprietary Version of Solidification Sys Project stage: Other ML13323A1741981-11-10010 November 1981 Forwards Proprietary & Nonproprietary Version of Process Control Program for Chem-Nuclear Sys,Inc Cement Solidification Units, Per Amend 21 to FSAR Section 11.4. Proprietary Version Withheld (Ref 10CFR2.790).W/affidavit Project stage: Other ML13310A3731981-12-11011 December 1981 Approves 811110 Request for Withholding Process Control Program for Cnsi Cement Solidification Units (SD-OP-003) Per 10CFR2.790 Project stage: Other ML13310A4261982-05-26026 May 1982 Forwards Request for Addl Info Re Waste Solidification Process Control Program to Complete Review Project stage: RAI ML13308A1911982-10-0505 October 1982 Summary of 820906-09 Meeting W/Util in Anaheim,Ca Re Natural Circulation Test Conducted at Low Power.Trip Rept Encl Project stage: Request ML13317A3551982-10-0505 October 1982 Discusses Use of Radwaste Solidification Sys.Unit 2 License Condition Does Not Prevent Util from Using Chem-Nuclear Sys, Inc Process to Solidify Wet Solid Radwaste Produced at Unit 1.Safety Evaluation Will Be Performed Project stage: Other ML20027D6391982-11-0404 November 1982 Comments on Re Radwaste Solidification Sys.Waste Solidification Process Control Program Should Be Developed & Implemented to Assure Solidified Solid Waste Reaches Licensed Burial Site in Acceptable Form Project stage: Other ML13310B2781984-03-0202 March 1984 Forwards Program Description for Waste Classification & Form to Be Used to Implement 10CFR61 & 10CFR20.311 Requirements Re Land Disposal of Radwaste & Stds for Protection from Radiation Project stage: Other ML13308A3491984-04-11011 April 1984 Notification of 840413 Meeting W/Util in Bethesda,Md to Discuss Process Control Program Project stage: Meeting ML13305A5711984-04-24024 April 1984 Provides Authorization for Shipment of Wet Solid Radwaste Until Review of Process Control Program Complete Project stage: Approval ML13329A4811984-10-17017 October 1984 Rev 0 to Health Physics Procedure SO1-VII-8.5.1, Process Control Program Project stage: Other ML13324A4721984-11-0202 November 1984 Forwards Rev 0 to Health Physics Procedure SO1-VII-8.5.1, Process Control Program. Applicable Documents Reviewed & Approved by NRC Listed Project stage: Other ML13324A5321984-12-27027 December 1984 Informs That Preliminary Review of Process Control Program (PCP) Completed.Pcp Acceptable for Use on Interim Basis. Interim Approval Continued Until Final Review of PCP Completed Project stage: Approval ML13324A6331985-04-22022 April 1985 Safety Evaluation Supporting Util Use of Process Control Program W/Tech Spec 6.16 Project stage: Approval ML13324A6311985-04-22022 April 1985 Forwards Safety Evaluation Supporting Util Use of Process Control Program as Referenced in Tech Spec 6.16 Project stage: Approval ML13309B5331985-05-0101 May 1985 Advises That Chem-Nuclear,Inc Replaced by Nuclear Packaging, Inc as Vendor of Wet Radwaste Treatment Svcs.Nuclear Packaging,Inc Will Dewater Wet Radwaste for Shipment,Per TP-02-NP.Approval Requested by 850601 Project stage: Other ML13324A6651985-06-0303 June 1985 Special Rept Providing Status of Change in Radwaste Solidification Sys.Solid Radwaste Sys Contract w/Chem-Nuclear,Inc expired.Chem-Nuclear Replaced by Nuclear Packaging,Inc Project stage: Other ML13309B5481985-06-11011 June 1985 Grants Interim Authorization to Proceed W/Dewatering of Spent Resin Per Rev 0 to Nupac Operations & Maint Procedure OM-17 & Rev 1 to Health Physics Procedure SO23-VII-8.5.1. Review of Nuclear Packaging TP-02-NP Continuing Project stage: Approval ML13308A8831985-07-24024 July 1985 Submits Addl Info Re Rev 0 to Topical Rept TP-04,per 850724 Telcon.Portable Solidification Unit Currently Under Contract for Waste Solidification,On Demand Svc Basis,At Facilities. Completion of Rept Review Requested within 60 Days Project stage: Other ML13324A6931985-08-0909 August 1985 Requests Approval to Use Pacific Nuclear Svcs,Inc in Place of Chem-Nuclear Sys,Inc for Solidification & Encapsulation of Wet Radwaste.Nrc Approval Needed by 851101 Because Potential Burial Site Limitations Take Effect in 1986 Project stage: Other 1984-12-27
[Table View] |
Text
Southern California Edison Company F. 0. BOX 800 2244*WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING May 1, 1985 (818) 302-1749 Director, Office of Nuclear Reactor Regulation Attention:
George W. Knighton, Branch Chief Licensing Branch No. 3 U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket Nos. 50-206, 50-361 and 50-362 San Onofre Nuclear Generating Station Units 1, 2 and 3 The current Process Control Program (PCP) for San Onofre Nuclear Generating Station (SONGS) uses Chem-Nuclear, Inc. as the vendor of wet radwaste solidification services. NRC interim approval of the current SONGS PCP using Chem-Nuclear, Inc. was granted by NRC letters dated December 27, 1984 for Unit 1 and April 24, 1984 for Units 2 and 3. The Chem-Nuclear contract with Southern California Edison Company (SCE) expired on April 1, 1985.
SCE replaced Chem-Nuclear, Inc. with Nuclear Packaging (NuPac), Inc. as the vendor of wet radwaste treatment services at SONGS.
NuPac's topical report, TP-02-NP, which addresses their dewatering system was submitted for NRC review in August 1984. NuPac will dewater wet radwaste at SONGS for shipment in high integrity containers.in accordance with this topical report.
SONGS currently has interim approval from the State of Washington for use of high integrity containers. SCE understands that review of the NuPac topical report has progressed to the point where interim, if not final approval of the dewatering system may be granted. SCE therefore requests NRC approval for the use by SCE of the NuPac dewatering system as described in the NuPac topical report.
It is SCE's intention to commence processing of wet radwaste using the NuPac dewatering system in June 1985. Therefore, approval of the use of the NuPac process at SONGS is requested by June 1, 1985.
If you have any questions regarding this request, please call me.
8505030356 850501 Very truly yours, PDR ADOCK 05000206 P
PDR cc:
Mr. J. A. Zwolinski, Branch Chief, Operating Reactors Branch No. 5 Mr. W. A. Paulson, NRR Project Manager, San Onofre Unit 1 Mr. H. Rood, NRC (to be opened by addressee only)
Mr. F. R. Huey, Senior Resident Inspector, SONGS Mr. J. B. Martin, Regional Administrator, NRC Region V
REGULATURY
'IFORMATION DISTRIbUTION SYSTFM (RIDS)
ACCESSION NbR:8505030356 DUC.DATE: 85/05/01 NOTARIZLV: NO DOCKET #
FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 50-3b1 San Onofre 4uclear Station, Unit 2, Southern Californ 50-362 San Onofre Nuclear Station, Unit 3, Southern Californ 05 AUTH.NAME AUTHwR AFFILIATION MEDFORDM,U.
Southern California Edison Co, RECIP.NAME RECIPILNT AFFILIATION KNIGHTUNG.oi.
Licensing branch 3
SUBJECT:
Advises that Chem-Nuclear Inc replaced by Nuclear Packaging, Inc as vendor of wet radwaste treatment svcsNuclear PackaginglInc will oewater wet radwaste for shlpmentper TP-02-NP.Approval requested by 850601.
DISTRIbUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZEs.......
TITLE: O Submittal: General Distribution NOTES:NRR/DL/SEP icy.
05000206 OL:03/27/67 EL) Chandler Icy.
05000361 UL;0/16/82 EL) Lhanoler Icy.
0500036?
OL;11/15/82 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR EN L ID CODE/NAME LTTR ENCL NRR ORb5 bC 01 7
NRR L83 BC 01 7
INTERNAL: ACRS 09 ADM/LFMB I
ELQ/HDS2 1
NRR/DE/MTEB 1
1 NRR/UL DIR a
NRP/DL/0RAB I
0 NRN/DL/TSRG 1
1 NRR DSI/MET8 1
1 NRR/DSI/KAB 1
1 04 1
RGNS 1
1 EXTERNAL: EG&G BRUSKE,S 1
1 LPD 03 2
NRC PDR 02 1
1 NSIC 05 1
NOTES:
TOTAL NUMBER OF COPIES RNEUIRED: LTTR 37 ENCL 4