Model Tech Specs Re Definition of Term operable- Operability & Limiting Conditons for Operations & Associated Bases.Time to Place Plant in Hot Standby Relaxed to 6-h & Cold Shutdown within Subsequent 30-h
ML20027C863
Person / Time
Site: Davis Besse 
Issue date: 10/13/1982
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20027C860 List:
References
TAC-43038, NUDOCS 8210270325
Download: ML20027C863 (3)


Text

-

+.

,.-...~. -

-n MODEL TECHNICAL SPECIFICATIONS PRESSURIZED WATER REACTORS 1.0 DEFINITIONS OPERABLE - OPERABILITY 1.6 A system, subsystem, train, component or device shall be OPERABLE or have OPERABILITY when it is capable of perfoming its specified function (s). Implicit in this definition shall be the assumption that.all necessary attendant instru-mentation, controls, nomal and emergency electrical power sources, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component or device to perform its function (s) are also capable of performing their related support function (s).

3/4 LIMITING CONDITIONS FOR OPERATION (GENERAL) 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.3 In the event a Limiting Condition for Operation and/or associated ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the specification, the unit shall be placed in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least H0T SHUTDOWN within-the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless corrective measures are completed that pemit operation under the permissible ACTION statements for the specified time interval as measured from initial discovery or until the reactor is placed in a MODE in which the specification is not applicable. Exceptions to these requirements shall be stated in the individual specifications.

3.0.5 When a system, subsystem, train, component or device is detemined to be inoperable soley because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting Condition for Operation, provided:

(1) its corresponding normal or emergency power source is OPERABLE; and (2)(all of its redundant system (s), subsystem (s),

train (s), component (s) and device s) are OPERA 3LE, or likewise satisfy the requirements of this specification. Unless both conditions (1) and (2) are satisfied, the unit shall be placed in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This specification is not applicable in MODES 5 or 6.

l l

8210270325 821013 PDR ADOCK 05000346 P

PDR

i 2-3/4.0 APPLICABILITY BASES 3.0.3 This specification delineates the ACTION to be taken for circumstances not directly provided for in the ACTION statements and whose occurrence would violate the intent of the specification. For example. Specification 3.5.1 requires each Recctor Coolant System accumulator to be OPERABLE and provides explicit ACTION requirements if one accumulator is inoperable. Under the tems of Specification 3.0.3, if more than one accismulator is inoperable, the unit is required to be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. As a further example, Specification 3.6.2.1 requires two Containment Spray Systems to be OPERABLE an( provides explicit ACTION mquirements if one spray system is inoperable: Unter the tems of Specification 3.0.3, if both of the required Containment Spray Systems are inoperable ' the unit is required to be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTD0WN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least COLD SHUTDOWN in the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. It is assumed that the unit is brought to the required MODE within the required times by promptly initiating and carrying out the appropriate ACTION statement, 3.0.5 This specification delineates what additional conditions must be satisfied to pemit operation to continue, consistent with the ACTION statements for power sources, when a normal or emergency power source is not OPERABLE. It specifically prohibits operation when one division is inoperable because its normal or emergency power source is inoperable and a system, subsystem, train, component or device in another division is inoperable for another reason.

l The provisions of this specification pemit the ACTION statements associated with individual systems, subsystems, trains, components, or devices to be consistent with the ACTION statements of the associated electrical power source. It allows operation to be governed by the time limits of the ACTION statement associated with the Limiting Condition for Operation for the normal or emergency power source, not the individual ACTION statements for each system, subsystem, train, component or device that is determined to be inoperable solely because of the inoperability of its nomal or emergency powe.r source.

For example, Specification 3.8.1.1 requires in part that two emergency diesel generators be OPERABLE. The ACTION statement provides for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time when one emergency diesel generator is not 0PERABLE. If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable emergency power source would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable Limiting Conditions for Operation.

However, the provisions of Specification 3.0.5 pemit the time limits for continued operation to be consistent with the ACTION statement for the inoperable

-.e,, _,.,,,,, - -. _.,.. _, _ _ _______ _________,__.-__

n

_ow..we,..va.

,,-,,_,,,,,.,,-,..,,n-

.y.,

w

. emergency diesel generator instead, provided the other specified conditions are satisfied. In this case, this would mean that the. corresponding nomal power source must be OPERABLE, and all redundant systems, subsystans, trains, components, and devices must be OPERA 8LE, or othentise satisfy Specification 3.0 5 (i.e., be capable of perfoming their design function ~and have at least one nomal or one emergency power source OPERABLE).

If they are not satisfied, shutdown is required in accordance with this specification.

As a further example, Specification 3.8.1.1 requires in part that two physically independent circuits between the offsite transmission network and the onsite Class IE distribution system be OPERABLE. The ACTION statement provides a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> out-of-service time when both required offsite circuits are not OPERABLE.

If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable ncrmal power sources, both of the offsite circuits, would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable LCOs. However, the provisions of Specification 3.0.5 pemit the time limits for continued operation to be consistent'with the ACTION statement for the inoperable nonnal power sources instead, provided the other specified conditions are satisfied. In this case, this would mean that for one division the emergency power source must be OPERABLE (as must be the components supplied by the emergency power source) and all redundant systems, subsystems, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e., be capable of perfoming their design functions and have an emergency power source OPERABLE). In other words, both emergency,

power sources must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE. If these conditions are not satisfied, shutdown is required in accordance with this specification.

In MODES 5 or 6 Specification 3.0.5 is not applicable, and thus the individual ACTION statements for each applicable Limiting Condition for Operation in these MODES must be adhered to.

~