Stipulation on Suffolk County Contention EP 3 Re Federal Resources.Plant Emergency Plan to Be Amended to Respond to Concerns
ML20027C344
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 10/12/1982
From: Black R, Latham S, Latham S, Mccleskey K, Mccleskey K, Mcmurray C, Shapiro R
LONG ISLAND LIGHTING CO., NORTH SHORE COMMITTEE AGAINST NUCLEAR & THERMAL POLLU, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD), SHOREHAM OPPONENTS COALITION, SUFFOLK COUNTY, NY
To:
Shared Package
ML20027C313 List:
References
ISSUANCES-OL, NUDOCS 8210150324
Download: ML20027C344 (4)


Text

-

4 M1 o

October 12, 1982 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of

)

)

LONG ISLAND LIGHTING COMPANY

)

Docket No. 50-322 (OL)

)

(Emergency Planning (Shoreham Nuclear Power Station,

)

. Proceeding)

Unit 1)

)

RESOLUTION OF SUFFOLK COUNTY CONTENTION EP 3 -- FEDERAL RESOURCES THIS AGREEMENT by and among Long Island Lighting Company ("LILCO"), the Nuclear Regulatory Commission Staff

(" Staff"), Suffolk County ("SC"), the Shoreham Opponents Coalition (" SOC"), and the North Shore Committee ("NSC") (here-inafter collectively the " Parties") resolves Suffolk County Contention EP 3 in accordance with the terms stated below, sub-ject to the approval of the Atomic Safety and Licensing Board

(" Licensing Board").

Suffolk County Contention EP 3 concerns whether the Shoreham Emergency Plan ("LILCO Plan" or " Plan") adequately incorporates Federal Resources that can be made available to respond at the Shoreham Nuclear Power Station in the event of a radiological emergency.

Suffolk County has contended that the SEAolB88R*OlasTag 0

4 6

provision for utilization of Federal resources is not clearly set forth in the LILCO Plan.

By this Resolution agreement, LILCO agrees to respond to the County's concerns by amending the fifth paragraph of Section 5.3 of the Plan (page 5-8) to read as follows:

A brief description of Federal agencies available for assistance is presented below:

U.S. Department of Energy The U.S. Department of Energy operates the Federal Radiological Monitoring and Assessment Plan (FRMAP) from its Northeast regional area office, located at the Brookhaven National Laboratory (BNL).

The FRMAP, which specializes in radiation safety and medicine, will provide assistance to the Nuclear Facility Operator, the State or County upon request.

This assistance is available twenty-four (24) hours a day by calling the contact phone number listed in the Emergency Plan Implementing Procedures.

Due to the close proximity of BNL in relation to the Shoreham plant it is anticipated that the response time will be immediate.

An agreement letter which addresses this assistance is contained in Appendix B.

A copy of the Federal Radiological Monitoring and Assessment Plan is appended to this plan.

U.S.

Coast Guard During a radiation incident which could have offsite consequences, the U.S. Coast Guard will assist by maintaining' traffic control on the Long Island Sound in the I

proximity of the Shoreham Nuclear Power j

Station.

Assistance is available twenty-

_2_

o four (24) hours a day by calling the contact phone number listed in the Emergency Plan Implementing Procedures.

It is anticipated that the U.S. Coast Guard's maximum response time will be four (4) hours.

An agreement letter which addresses this assistance is contained in Appendix B.

U.S. NRC The United States Nuclear Regulatory Commission (NRC) requires notifica".ivn in accordance with regulatory and license requirements.

Initial notification to the NRC shall be within one hour of declaration of an emergency by use of the Emergency Notification System (ENS).

During and after a radiological emergency, the primary role of the NRC is that of conducting investigative activities associated with the incident and verifying that emergency plans have been implemented and proper agencies notified.

Should the NRC deem it necessary, additional NRC personnel will be dispatched to the site to augment the two resident on-site NRC inspectors.

The NRC team, in an advisory capacity, will provide on-site technical response assistance

~

including monitoring, ansessment, technical control and assessing radiological hazards to the public.

Sufficient space and provisions for the NRC are provided in the TSC, EOF, and the ENC.

Based upon LILCO's agreement to amend the Plan to read as set forth, the County finds that SC Contention EP 3 is resolved.

As a result, the Parties jointly urge the Licensing Board to accept this Resolution to terminate litigation of SC Contention EP 3.

', e J

fkdu,EAMithAu, /s//shs dbunsell for ' ' ' ' ' '

/

/ / bate)

LONG ISLAND LIGHTING COMPANY R s=d t %L/w isir/zt Counsel for (Date)

NUCLEAR REGULATORY COMMISSION STAFF l0 2.-

Mw dounsel for

/

/ ~~

(bcite )

NORTH SHORE COMMITTEE l'8'Z,

/

A m

'Coun6el for

/'

(Da'te$

SHOREHAM OPPONENTS COALITION bO g

Couns(1 fo'r (d ge)

SUFFOLK COUNTY l

l l

.. - -