Forwards QA Program Insp Repts 99900902/81-01 & 9990902/81-02 on 810915-17,21,22,1001-02 & 05.No Noncompliance Noted
ML20027B663
Person / Time
Issue date: 12/18/1981
From: Reinmuth G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20027B656 List:
References
FOIA-82-345, REF-QA-99900902 NUDOCS 8209290178
Download: ML20027B663 (2)


Text

. _ _...

!f'

  1. 'o UNITED STATES f*'*

NUCI. EAR REGULATORY COMMISSION

/

4 g

WASHINGTON, D. C. 20555 p.

Y

.. fj

- s *w y DEC 181381 l

A Wisconsin Electric Power Company 1

ATTN: Mr. C. W. Fay, Director Nuclear Power Department P.O. Box 2046 Milwaukee, WI 53201

.i Gentl emen:

3 This refers to two inspections conducted by the Nuclear Regulatory Commission (NRC) staff representatives of activities performed by Wyle Laboratories, Huntsville, Alabama.

One of the activities reviewed during these inspections was the Phase II Test Program for Rosemount 1153 Series D and Foxboro N-E 10 Series Pressure Transmitters.

Boiih~in'spectio'ns were conducted by Mr. D. G."

' ~

Mcdonald.

The first at Wyle Laboratories, Huntsville, Alabama on September 15, 15,17, 21 and 22,1981.

The second at Neeley Research Center (Georgia Tech.),

Atlanta, Georgia on October 1, 2 and 5,1981.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this 4

letter and the enclosed inspection reports will be placed in the NRC's Public Document Room.

If this report contains any infonnation that you believe to be i

exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to with-

?

hold such information.

If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office f

promptly so that a new due date may be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specific periods noted above, the report will be placed in the Public Document Room.

I S

U s=

_w m

m y7e 820g26 2-340

Wisconsin Electric Power Co.

-2_

DEC 181981

~

Should you have any questi-ons concerning these inspections, we will be pleased to discuss them with you.

Since, rely, jJ _?f. O b

G, A -: tw%

G. W. Reinmuth, Chief Vendor and Special Projects Branch Division of Resident and Regional Reactor Inspection Office of Inspection and Enforcement

Enclosures:

Phase II Test Program for Rosemount 1153 Series D and Foxboro N-E 10 Series Pressure Transmitters Report 1 - Initial Preparation Report 2 - Normal (Nonaccident) Radiation Simulation cc/w enclosures:

L. Frazier, Wyle W. Vosahlik, Wyle B. Fowl er, Wyl e J. White, Wyle G. Gray, Wyle J. Pritchard, Wyle D. Jeppesen, Sandia J. Benson, Sandia R. C. DeYoung, IE J. H. Sniezek, IE E. L. Jordan, IE J. M. Taylor, IE M. W. Peranich, IE Z. Rosztoczy, NRR T. ii, NRR K. Desai, NRR F. Ro.a, NRR U. Potapovs, RIV S. Phillips, RIV R. Agee, RIV A. Johnson, RIV D. G. Mcdonald, NRR A. B. Bennett, IE D#ft H M S