ML20010D371

From kanterella
Jump to navigation Jump to search
Updated NRC Staff Exhibit List
ML20010D371
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/10/2020
From:
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-443-LA-2, ASLBP 17-953-02-LA-BD01, RAS 55526
Download: ML20010D371 (17)


Text

APPENDIX A: NextEra Energy Seabrook, LLC, Docket No. 50-443-LA-2 September 2019 Evidentiary Hearing Exhibits

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC001-R NRC Staff Staff Testimony NRC002 NRC Staff Statement of Professional Qualifications of Angela Buford NRC003 NRC Staff Statement of Professional Qualifications of Bryce Lehman NRC004 NRC Staff Statement of Professional Qualifications of George Thomas NRC005 NRC Staff Jacob Philip Testimony NRC006 NRC Staff Statement of Professional Qualifications of Jacob Philip NRC007 NRC Staff Seabrook Station Updated Final Safety ML17310A406 Analysis Report (UFSAR), Chapter 3, "Design of Structures, Components, Equipment and Systems, Revision 18 (October 2017)

NRC008 NRC Staff Enclosure 3 to Original LAR, MPR- ML16216A242 4273, Revision 0, Seabrook Station -

Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction (July 2016)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC009 NRC Enclosure 6 to Original LAR, MPR- ML16216A246 Staff 4273, Revision 0, Seabrook Station -

(Proprietary) Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction (July 2016)

NRC010 NRC Staff Letter from Ralph A. Dodds III, NextEra, ML16279A048 to NRC Document Control Desk, Seabrook Station, Supplement to License Amendment Request 16-03, Revise Current Licensing Basis to Adopt a Methodology for the Analysis of Seismic Category I Structures with Concrete Affected by Alkali-Silica Reaction (Sept. 30, 2016)

NRC011 NRC Staff Enclosure 3 to Sept. 2016 LAR ML16279A050 Supplement, MPR-4153, Revision 2, Seabrook Station - Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction (July 2016)

NRC012 NRC Enclosure 5 to Sept. 2016 LAR ML16279A055 Staff Supplement, Revision 2, MPR-4153, (Proprietary) Rev. 2, Seabrook Station -

Approach for Determining Through Thickness Expansion from Alkali-Silica Reaction (July 2016)

NRC013 NRC Staff Letter from Eric McCartney, NextEra, to ML17277A337 NRC Document Control Desk, Seabrook Station, Response to Request for Additional Information Regarding License Amendment Request 16-03 Related to Alkali-Silica Reaction (Oct. 3, 2017)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC014 NRC Staff Letter from Eric McCartney, NextEra, to ML17345A641 NRC Document Control Desk, Seabrook Station, Response to Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (Dec. 11, 2017)

NRC015 NRC Staff Letter from Christopher Domingos, ML18158A540 NextEra, to NRC Document Control Desk, Seabrook Station, Response to Request for Additional Information Regarding License Amendment Request 16-03 (June 7, 2018)

NRC016 NRC Staff Letter from Eric McCartney, NextEra, to ML18141A785 NRC Document Control Desk, Seabrook Station Revised Structures Monitoring Aging Management Program (May 18, 2018)

NRC017 NRC Staff Letter from Tam Tran, NRC, to Dean ML15307A022 Curtland, NextEra, Alkali Silica Reaction Monitoring Aging Management Program Audit Report Regarding the Seabrook Station, Unit 1, License Renewal (TAC No. ME4028)

(Dec. 17, 2015)

NRC018 NRC Staff Seabrook ASR-Monitoring Program ML15337A047 Audit Report, Enclosure to Dec. 17, 2015 Letter to NextEra (undated)

NRC019 NRC Staff Confirmatory Action Letter, Seabrook ML12125A172 Station, Unit 1 - Information Related to Concrete Degradation Issues (May 16, 2012)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC020 NRC Staff Letter from Richard A. Plasse, NRC, to ML110280424 Paul Freeman, NextEra, Audit Report Regarding the Seabrook Station License Renewal Application (TAC Number ME4028) (Mar. 21, 2011)

NRC021 NRC Staff Letter from Arthur L. Burritt, NRC, to ML111330689 Paul Freeman, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2011002 (May 12, 2011)

NRC022 NRC Staff Letter from Richard J. Conte, NRC, to ML111360432 Paul Freeman, NextEra, NextEra Energy Seabrook - NRC License Renewal Inspection Report 05000443/2011007 (May 23, 2011)

NRC023 NRC Staff Letter from Arthur L. Burritt, NRC, to ML112241543 Paul Freeman, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2011003 (Aug. 12, 2011)

NRC024 NRC Staff Letter from Christopher G. Miller, NRC, ML120480066 to Paul Freeman, NextEra, Seabrook Station - NRC Inspection Report 05000443/2011010 Related to Alkali-Silica Reaction Issue In Safety Related Structures (Mar. 26, 2012)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC025 NRC Staff Letter from Christopher G. Miller, NRC, ML12338A283 to Kevin Walsh, NextEra, Seabrook Station, Unit No. 1 - Confirmatory Action Letter Follow-up Inspection -

NRC Inspection Report 05000443/2012009, Enclosure, Inspection Report No.

0500044312012009 (Dec. 3, 2012)

NRC026 NRC Staff Letter from Raymond K. Lorson, NRC, ML13221A172 to Kevin Walsh, Seabrook Station, Unit No. 1 - Confirmatory Action Letter Follow-up Inspection - NRC Inspection Report 05000443/2012010 (Aug. 9, 2013)

NRC027 NRC Staff Letter from Glenn T. Dentel, NRC, to ML14030A509 Kevin Walsh, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2013005 (Jan. 30, 2014)

NRC028 NRC Staff Letter from Glenn T. Dentel, NRC, to ML14127A376 Kevin Walsh, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2014002 (May 6, 2014)

NRC029 NRC Staff Letter from Glenn T. Dentel, NRC, to ML14212A458 Dean Curtland, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2014003 (Aug. 5, 2014)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC030 NRC Staff Letter from Glenn T. Dentel, NRC, to ML15037A172 Dean Curtland, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2014005, (Feb. 6, 2015)

NRC031 NRC Staff Letter from Glenn T. Dentel, NRC, to ML15217A256 Dean Curtland, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2015002, (Aug. 5, 2015)

NRC032 NRC Staff Letter from Fred L. Bower, III, NRC, to ML16043A391 Dean Curtland, NextEra, Seabrook Station, Unit No. 1 - NRC Integrated Inspection Report 05000443/2015004 and Independent Spent Fuel Storage Installation Report No.

07200063/2015001 (Feb. 12, 2016)

NRC033 NRC Staff Letter from Mel Gray, NRC, to Dean ML16127A155 Curtland, NextEra, Seabrook Station, Seabrook Station - Inspection Report 05000443/2016008 Related to Alkali-Silica Reaction Affects On Safety-Related Concrete Structures And Notice Of Violation, (May 6, 2016)

NRC034 NRC Staff Letter from to Eric McCartney, NextEra, ML16218A455 Seabrook Station, Unit No. 1 -

Integrated Inspection Report 05000443/2016002, (Aug. 5, 2016)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC035 NRC Staff Letter from Fred L. Bower, III, NRC, to ML17040A220 Eric McCartney, NextEra, Seabrook Station, Unit No. 1 - Integrated Inspection Report 05000443/2016004, (Feb. 8, 2017)

NRC036 NRC Staff Letter from Fred L. Bower, III, NRC, to ML17227A018 Mano Nazar, NextEra, Seabrook Station, Unit No. 1 - Integrated Inspection Report 05000443/2017002, encl. at 31-32 (Aug. 14, 2017)

NRC037 NRC Staff Letter from Fred L. Bower, III, NRC, to ML18043A821 Mano Nazar, NextEra, Seabrook Station, Unit No. 1 - Integrated Inspection Report 05000443/2017004, encl. at 24-27 (Feb. 12, 2018)

NRC038 NRC Staff Letter from Fred L. Bower, III, NRC, to ML18134A222 Mano Nazar, NextEra, Seabrook Station, Unit No. 1 - Integrated Inspection Report 05000443/2018001, encl. at 8-9 (May 14, 2018)

NRC039 NRC Staff Letter from Mel Gray, III, NRC, to Mano ML18222A292 Nazar, NextEra, Seabrook Station, Unit No. 1 - Integrated Inspection Report 05000443/2018011, (Aug. 10, 2018)

NRC040 NRC Staff Letter from Fred L. Bower, NRC, to ML18318A009 Mano Nazar, NextEra, Seabrook Station, Unit No. 1 - Integrated Inspection Report 05000443/2018003, (Nov. 13, 2018)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC041 NRC Staff Letter from Richard Plasse, NRC, to ML13354B785 Kevin Walsh, NextEra, Aging Management Program Audit Report Regarding the Seabrook Station License Renewal Application (TAC No.

ME4028) (Dec. 23, 2013)

NRC042 NRC Staff Letter from Tam Tran, NRC, to Eric ML16333A247 McCartney, NextEra, Alkali Silica Reaction Monitoring Aging Management Program Audit Report Regarding the Seabrook Station, Unit 1, License Renewal (CAC No.

ME4028) (Dec. 21, 2016)

NRC043 NRC Staff Letter from Justin C. Poole, NRC, to ML17199T383 Mano Nazar, NextEra, Seabrook Station, Unit No. 1 - Site Visit Report Regarding Regulatory Audit for License Amendment Request Re: Alkali-Silica Reaction License Amendment Request and License Renewal Alkali-Silica Reaction Aging Management Program Review (CAC No. MF8260; EPID L-2016-LLA-0007) (July 26, 2017)

NRC044 NRC Staff Letter from Justin C. Poole, NRC, to ML18135A046 Mano Nazar, NextEra, Seabrook Station, Unit No. 1 - Site Visit Report Regarding Regulatory Audit for License Amendment Request Re: Alkali-Silica Reaction License Amendment Request and License Renewal Alkali-Silica Reaction Aging Management Program Review (CAC No. MF8260; EPID L-2016-LLA-0007) (May 21, 2018)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC045 NRC Staff Memorandum from Eric J. Leeds, NRR, ML121250588 and William M. Dean, Region 1, Seabrook Alkali-Silica Reaction Issue Technical Team Charter (July 9, 2012)

NRC046 NRC Staff Summary of August 24, 2017, Meeting ML17278A748 with NextEra Energy Regarding license amendment request on alkali silica reaction (CAC No. MF8260; EPID l-2016-lla-0007) (Oct. 13, 2017)

NRC047 NRC Staff Memorandum from James G. Danna, ML18226A205 NRC, to Andrea D. Veil, NRC ACRS, Seabrook Station, Unit No. 1 -

Submission of Alkali-Silica Reaction License Amendment Request Draft Safety Evaluation to Support the Advisory Committee on Reactor Safeguards Review of Seabrook License Renewal (CAC No. MF8260; EPID L-2016-LLA-0007) (Sept. 28, 2018)

NRC048 NRC Staff Letter from Michael Corradini, ML18348A951 Chairman, ACRS, to Kristine L.

Svinicki, Chairman, NRC, Seabrook Station Unit 1 License Renewal Application: Review of Licensee Program Addressing Alkali-Silica Reaction (Dec. 14, 2018)

NRC049 NRC American Concrete Institute (ACI)

Staff Standard 318-71, Building Code (copyright) Requirements for Reinforced Concrete (1971)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC050 NRC Section Ill, Division 2, of the 1975 Staff Edition of the American Society of (copyright) Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) for containment NRC051 NRC Report of ACI-ASCE (American Staff Society of Civil Engineers)

(copyright) Committee 326, Shear and Diagonal Tension (1962)

NRC052 NRC ACI 408R-03, Bond and Staff Development of Straight Reinforcing (copyright) Bars in Tension (effective Sept. 24, 2003) (reapproved 2012)

NRC053 NRC Staff Letter from Public Service Company of New Hampshire to NRC Region I, Office of Inspection and Enforcement re: Response to NRC IE Bulletin 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts, Revision 2, November 8, 1979 (Jan 3. 1980)

NRC054 NRC Staff NUREG/CR-5563, A Technical Basis ML032740128 for Revision to Anchorage Criteria, March 1999 NRC055 NRC ACI 349-13, Code Requirements for Staff Nuclear Safety-Related Concrete (copyright) Structures and Commentary 2013

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC056 NRC Madhu M. Karthik, et. al.,

Staff Experimental Behavior of Large (copyright) Reinforced Concrete Specimen with Heavy ASR and DEF [delayed ettringite formation] Deterioration, J. Struct. Eng. (2018) (published online May 31, 2018)

NRC057 NRC M. Kathleen Eck Olave, et. al.,

Staff Performance of RC Columns (copyright) Affected by ASR. II: Experiments and Assessment, Vol. 20. ASCE J. of Bridge Engg (March 2015)

(published online June 12, 2014)

NRC058 NRC F. Habibi, et. al., Alkali Aggregate Staff Reaction in Nuclear Concrete (copyright) Structures: Part 3: Structural Shear Wall Elements, Transactions, 23rd Conference on Structural Mechanics in Reactor Technology (SMiRT-23),

Manchester, UK, August 10-14, 2015, Division I, Paper ID 044.

NRC059 NRC ACI 349.3R, Evaluation of Existing Staff Nuclear Safety-Related Concrete (copyright) Structures (2002) (Reapproved 2010)

NRC060 NRC Staff NRC Information Notice 2011-20: ML112241029 Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC061 NRC Staff Standard Review Plan for Review of ML17188A158 Subsequent License Renewal Applications for Nuclear Power Plants (Final Report), NUREG-2192 (July 2017)

NRC062 NRC Staff Interagency Agreement between NRC ML14147A221 and NIST (Mar. 31, 2014)

NRC063 NRC Staff Grant and Cooperative Agreement ML14275A015 between NRC and Northwestern University (Sept. 30, 2014)

NRC064 NRC Staff Sherry Berhoft, EPRI Senior Program Manager, NRC Commissioner Briefing on the Status of Subsequent License Renewal Preparations, EPRI Long Term Operations: Research &

Development for Aging Management (Apr. 26, 2017)

NRC065 NRC Emma L. Wong & Sherry Bernhoft, Staff Overview of the Electric Power (copyright) Research Institutes Research for Long Term Operations, 117 Transactions of the Am. Nuclear Socy, 648, 648 (Oct. 29-Nov. 2, 2017)

NRC066 NRC Staff U.S. Department of Energy, Light Water Reactor Sustainability Program A Summary of Collaborative Research and Development Activities, INL/EXT-19-52416, Rev. 0 (Jan. 2019)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC067 NRC Staff Organisation for Economic Co-operation and Development, Nuclear Energy Agency, Final Report on the Phase 1 of the Assessment of Structures Subjected to Concrete Pathologies NEA/CSNI/R(2016)13 (July 2017)

NRC068 NRC Staff Organisation for Economic Co-operation and Development, Nuclear Energy Agency, Phase II of the Assessment of Structures Subjected to Concrete Pathologies (ASCET): Final Report NEA/CSNI/R(2018)4 (Jan. 21, 2019)

NRC069 NRC Staff IRSN, ODOBA Research programs, (last update Aug. 2018),

https://www.irsn.fr/EN/Research/Resear ch-organisation/Research-programmes/Odoba-project/Pages/ODOBA.aspx NRC070 NRC Staff Research Activities FY 2018-2020, ML18071A139 NUREG-1925, Rev. 4 (Mar. 2018)

NRC071 NRC Staff NUREG/CR-7153, Expanded Materials ML14279A430 Degradation Assessment (EMDA),

Volume 4: Aging of Concrete and Civil Structures (Oct. 2014)

NRC072-R NRC R. Park and T. Paulay, Reinforced Staff Concrete Structures (John Wiley &

(copyright) Sons, Inc. 1975).

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC073 NRC David Darwin, Charles W. Dolan, and Staff Arthur H. Nilson, Design of (copyright) Concrete Structures (McGraw Hill, Inc., 15th Ed. 2016).

NRC074 NRC Stéphane Multon, et. al., Flexural Staff Strength of Beams Affected by (copyright) ASR, 12th International Conference on Alkali-Aggregate Reaction, Beijing, China (2004)

NRC075 NRC Staff Dean J., Deschenes, et. al., ASR/DEF-Damaged Bent Caps: Shear Tests and Field Implications, Technical Report No. 12-8XXIA006 summarizing work conducted for the Texas Department of Transportation at Ferguson Structural Engineering Laboratory, The University of Texas at Austin (August 2009)

NRC076 NRC Canadian Standards Association Staff (CSA) A864-00, Guide to the (copyright) Evaluation and Management of Concrete Structures Affected by Alkali-Aggregate Reaction (Feb.

2000) (Reaffirmed 2005)

NRC077 NRC Geoffrey E. Blight and Mark G.

Staff Alexander, Alkali-Aggregate (copyright) Reaction and Structural Damage to Concrete - Engineering Assessment, Repair and Management, (CRC Press Taylor & Francis Group, 2011)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC078 NRC Staff Letter from Paul O. Freeman, NextEra, ML12151A396 to NRC, Seabrook Station Response to Confirmatory Action Letter (May 24, 2012)

NRC079 NRC Staff Enclosure 2 to SBK-L-12106, The ML12151A397 Evaluation, Impact of ASR on Concrete Structures and Attachments, (May 2012) (Interim Structural Assessment)

NRC080 NRC Staff Memorandum from John G. Lamb, ML121070659 NRC, to Meena Khanna, NRC, Forthcoming April 23, 2012 Meeting with NextEra Energy Seabrook, LLC (NextEra) Regarding Seabrook Station Concrete Degradation (Mar. 23, 2012)

NRC081 NRC Staff Letter from Paul O. Freeman, NextEra, ML12125A022 to NRC, Seabrook Station Actions for Resolution of Alkali Silica Reaction (ASR) Issues (May 3, 2012)

NRC082 NRC Staff Letter from Paul O. Freeman, NextEra, ML12131A479 to NRC, Seabrook Station Supplement to Actions for Resolution of Alkali Silica Reaction (ASR) Issues (May 10, 2012)

NRC083 NRC Staff Memorandum from William M. Dean, ML12242A370 NRC, to R.W. Borchardt, NRC, Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction Issue at Seabrook (Sept. 5, 2012)

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC084 NRC Staff Letter from Darrell J. Roberts, NRC, to ML12258A042 Kevin Walsh, NextEra, Deviation from the Reactor Oversight Process Action Matrix for Seabrook Station, Unit No. 1 (Sept. 12, 2012)

NRC085 NRC Staff Letter from William M. Dean, NRC, ML13274A670 Kevin Walsh, NextEra, Closure of Confirmatory Action Letter 1-12-002, Seabrook Station, Unit 1 (Oct. 9, 2013)

NRC086 NRC Staff Letter from Darrell J. Roberts, NRC, to ML13246A107 Kevin Walsh, NextEra, Mid-cycle Performance Review and Inspection Plan - Seabrook Station, Unit No. 1 (Report 05000443/2013006), (Sept. 3, 2013)

NRC087 NRC Staff Email from Justin Poole, NRC, to ML17017A162 Kenneth Browne, NextEra, Audit Plan Regarding Seabrook ASR License Amendment Review, (Jan. 13, 2017)

NRC088 NRC Staff Regulatory Guide (RG) 1.29, Seismic ML16118A148 Design Classification for Nuclear Power Plants (July 2016)

NRC089 1 NRC Enclosure 1 to Original LAR, NextEra ML16216A244 Staff Energy Seabrook's Evaluation of the (Proprietary) Proposed Change Including Attachment 1 Markup of UFSAR Pages 1 The Staff is filing this exhibit because Exhibit INT011 includes highlighting that is not a part of the original document.

[Party] Witness/ Exhibit Title/Description ADAMS Exh. No. Panel Accession No.

NRC090 NRC Staff Staff Testimony in Response to Exhibit INT030 NRC091 NRC Staff Staff Testimony in Response to Exhibit INT051-R