05000321/LER-1981-059-03, /03L-0:on 810620,delta P Was Not Established within Required Time After Mode Switch Was Placed in Run Mode.Caused by Steam Supply to Vaporizer Not Being Available Due to Slow Inerting of Drywell to Less than 4% O

From kanterella
(Redirected from ML20009C594)
Jump to navigation Jump to search
/03L-0:on 810620,delta P Was Not Established within Required Time After Mode Switch Was Placed in Run Mode.Caused by Steam Supply to Vaporizer Not Being Available Due to Slow Inerting of Drywell to Less than 4% O
ML20009C594
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/07/1981
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009C586 List:
References
LER-81-059-03L, LER-81-59-3L, NUDOCS 8107210250
Download: ML20009C594 (2)


LER-1981-059, /03L-0:on 810620,delta P Was Not Established within Required Time After Mode Switch Was Placed in Run Mode.Caused by Steam Supply to Vaporizer Not Being Available Due to Slow Inerting of Drywell to Less than 4% O
Event date:
Report date:
3211981059R03 - NRC Website

text

__

U. S. NUCLEAR REGULATORY COMMISSION NRC FORM 366 m,

LICENSEE (EVENT REPORT CONTROL BLOCK: l l

l l

l l

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 10l1llGlAlElIlHl1l@lOlOl-lOl0]OlOlOl-l010l@l4lllllllll@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUM8ER 25 26 LICENSE TYPE Jo 57 CAT 58 CObt'T loIiI 3oCO lLl@l015I010I0l312l1l@l016l2InlRI1l@l0I7l 017l8l1l@

"E R

7 8

60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES iOl2l l While performing reactor startup, T Specs. 3.7.A.7.1 states that after the reactor l

mode switch is placed in the run mode, the Delta P will be obtained in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The l

,o,3,

, o,,,,, mode switch was placed in the run mode at 1910 6-19-81 and the Delta P was established l at 2110 6-20-81. There were effects upon public health and safety due to this l

101stI 1Ote1I event.

I 10171 I I

iIAS I

l o is i i s

  • $o'E

,g,A

  1. "SE C

C0oe C E COMPONENT CODE SUSC 0 S

!al91 l Sl El@ I X I@ l Z l@ l Zl Zl 21 ZI ZI Zl@ l Zl@ l Z l@

7 8

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LE RiRO EVENT YEAR REPORT NO.

CODE TYPE N O.

@, REP g l21 8l 1l l-l l 01 5l 9l l/l 10l 3 l lLl l-l l 0l 22 23 24 26 27 28 29 30 31 32 K N AC O ON PL NT ET HOURS 22 S8 i FOR 8.

SU PLI MANUFACTURER lXl@lZl@

l Blg l Zl@

l0 l0l0 lz l lYl@

l Y l@

l Zl@

l Z l 9 l 9 l 91@

33 34 35 36 31 40 41 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS i,,o j ; The cause of the event was due to getting the drywell inerted to less than four per-l which took 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> and 57 minutes. The valves for inerting had to he closed i

,,,,,, cent 07 before Delta P system could be re-aligned and normal steam supply to the vaporizer was i

,,,,,; not available.

Investigation by Engineering Department is underway to provide a l

steam source to vaporizer.

80 7

8 9 ST S

% POWER OTHER STATUS DlS O RY DISCOVERY DESCRIPTION I115 I l C l@ l 01 61 4l@l N/A l

l A l@l Operator Observation l

ACTIVITY CO TENT RELEASE F RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE [1_j.6J l 2 l lZ l@l N/A l

l N/A l

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

li 171 l 0 l 0 l 0 l@l Z l@l N/A l

PERSONNEL INJURIES oESCRiPTiON@

NuveER l0l0l0[@l N/A l

i a 7

8 9 11 12 80 TYPE DESCR PT ON W lZi@l N/A l

7 8 9 10 8107210250 810707 80 PUBLICITY PDR ADOCK 05000321 NRC USE ONLY S

PDR ISSUED @ DESCRIPTION

[,N_j l

N/A lIl1IIIIIIIIl1 2 O 7

8 9 TO 68 69 80 5

o y*

LER #:

50-321/1981-059 Licensee: Georgia Power Company Facility Name:

Edwin I. Hatch Docket #:.50-321

Narrative

Report for LER 50-321/1981-059 During reactor start-up the drywell was 'oeing inerted to less than four percent 02 after the mode switch was placed in the run mode.

The drywell Delta P was established but two hours after the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> had axpired.

l

- When the drywell was less than four percent 0, the valves were re-aligned 2

and the Delta P system was placed in service.

During this time an orderly shutdown was begun and the shutdown was terminated after the Delta P was established.

This is not a reoccurring problem and this problem is not applicable to Unit II.

I

~

An extension was-obtained on the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> requirement for inerting, but an extension on Delta P was not included in the same request.

l l

2 f