ML20009C586

From kanterella
Jump to navigation Jump to search
Forwards LER 81-059/03L-0
Date released: 01/23/2020 Download: ML20009C586


LER 81-059/03L-0:on 810620,delta P Was Not Established within Required Time After Mode Switch Was Placed in Run Mode.Caused by Steam Supply to Vaporizer Not Being Available Due to Slow Inerting of Drywell to Less than 4% O
ML20009C594
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/07/1981
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C594 (2)
Forwards LER 81-059/03L-0
ML20009C585
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/07/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C585 (1)