ML20008D894

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 4.9,3.8 & 4.8 Re Reactor Protection Sys Electric Power Monitoring for Unit 1 & Operability & Surveillance of Ac Distribution Sys for Unit 2.Proposed Fee Determination Encl
ML20008D894
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/15/1980
From:
GEORGIA POWER CO.
To:
Shared Package
ML20008D877 List:
References
TAC-43083, TAC-43282, NUDOCS 8010230491
Download: ML20008D894 (6)


Text

, ,

V, ~ . -

ATTACHMENT 1 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. tiATCH NUCLEAR PLANT UNIT 1 PROPOSED TECHNICAL SPECIFICATIONS The proposed change to the Unit 1 Technical Specifications, Appendix A to Operating License DPR-57, would be incorporated as follows:

Remove Page Insert Page 3.9-6a 3.9-6a

}

l i

B910k30Y\

4

_ . _ - - . - - . _ _ _ . . ~-_ _ _ __ _

4 .

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS l 3.9.D Electric Power Monitoring for the 4.9.D Electric Power Monitoring for Reactor Protection System ' Reactor Protection System Specifications:- Specifications:

1. When either of the RPS MG sets or the 1. The Electric Power Monitoring for Alternate Source is in service, its The Reactor Proection System power monitoring system shall be shall be demonstrated c,perable:
OPERABLE.1 (a) If the power monitoring system is (a) At least once per operating not OPERABLE and Operability cycle by perfonning a cannot be restored within 30 FUNCTIONAL TEST, minutes of discovery, remove the.

power supply from service immediately (b) At least once per operating thereafter. cycle by demonstrating the OPERABILITY of under-voltage, .

(b) One channel of a power monitoring over-voltage and under-fre-system may be inoperable, as quency protective instrumenta-necessary for test or maintenance, tion by performance of a CHANNEL not to exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per month. CALIBRATION including simu-lated automatic actuation of the protective relays, trip- -

ping. logic and output cir-

, cuit breakers and verifying the following setpoints:

(1) Over-voltage <132 VAC, (2) Under-voltage >108 VAC, with time delay relay set

, to zero*  ;

(3) Under-frequency >57 Hz, with time delay relay set to zero*

l

  • Pending NRC approval of diff_er'e nt value, t

-3.9-6a

ATTACHMENT 2 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 .

EDWIN I. HATCH NUCLEAR PLANT UNIT 2 PROPOSED TECHNICAL SPECIFICATIONS The proposed changes to the Unit 2. Technical Specifications, Appendix A to Operating License NPF-5, would be incorporated as follows:

Remove Page Insert Page 3/4 8-10 3/4 8-10 3/4.8-11 ---

3/4 8-24 1

8 9

ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS ,

A.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 The followin motor-generator (MG) g be sets shall A.C. distribution OPERABLE system with breakers tusec, open betweeninverters and redundant buses:

a. 4160 volt Essential Buses 2E, 2F, and 2G,
b. 600 volt Essential Buses 2C and 2D,
c. 120/208 volt Essential Cabinets 2A and 2B,
d. 120/208 volt Instrument Buses 2A and 2B, and
e. A.C. inverters 2R44-S002 and 2R44-S003.

APPLICABILITY: CONDITIONS 1, 2 and 3 ACTION:

a. With one of the above required A.C. distribution system buses or inverters inoperable, restore the inoperable bus or inverter to OPERABLE status within 2 hrars or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD daiUT009N within the fol-lowing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b. With two or more of the above required A.C. distribution system ,

buses or inverters inoperable, restore at least all except one of the inoperable buses and inverters to OPERABLE status within ,

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least H0T SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> j and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. I SURVEILLANCE REQUIREMENTS 4.8.2.1 The above required A.C. distribution system buses and inverters shall be determined OPERABLE:

a. At least once per 7 days by verifying correct breaker alignment and indicated power availability, and l
b. At least oncer per 31 days by determining that the 250 volt DC/600 volt AC inverters 2R44-S002 and 2R44-5003 are OPERABLE by verify-ing inverter output voltage of 600 volts + 5% while supplying their respective buses.

HATCH - UNIT 2 3/4 8-10

ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS ELECTRIC POWER M0ilITORING FOR REACTOR PROTECTION SYSTEM ,

LIMITING CONDITION FOR OPERATION 3.8.2.7 The power monitoring system for a RPS MG set or the Alternate Source shall be OPERABLE if in service.

APPLICABILITY: CONDITIONS 1 and 2.

ACTION:

With the ptWer monitoring system for a RPS MG set or the Alternate Source inoperable, restore the inoperable power monitoring system to OPERABLE status within 30 minutes or remove the RPS MG set or Alternate Source associated with the inoperable power monitoring system from service.

SURVEILLANCE REQUIREMENTS l'

4.8.2.7 The 1bese specified RPS power monitoring system instrumentation shall be determined OPERABLE:

a. At least once per operating cycle by performing a FUNCTIONAL TEST; and
b. At least once per operating cycle by demonstrating the OPERABILITY of over-voltage, under-voltage and under-frequer.cy protective instrumentation by performance of a CHANNEL CALIBRATION including simulated automatic actuation of the protective relays, tripping logic and output circuit breakers and verifying the following setpoints.
1. Over-voltage i 321 VAC,
2. Under-voltage > 108 VAC, with time delay relay set to zero*,

and

3. Under-frequency > 57 Hz.
  • Pending NRC approval of different value.

HATCH - UNIT 2 3/4 8-24

ATTACHMENT 3 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2

. PROPOSED DETERMINATION OF /J1ENDt1ENT CLASS Pursuant to 10 CFR 170.12 (c), Georgia Power Company has evaluated the attached proposed amendment to Operating Licenses DPR-57 and NPF-5 and has determined that:

a) The proposed amendment does not require the evaluation of a new Safety Analysis Report or rewrite of the facility license; b) The proposed amendment does not contain several complex issues, does not involve ACRS review, or does not require an environmental impact statement; c) The proposed amendment does not involve a complex issue, an environ-mental issue or more than one safety issue; d) The proposed amendment does involve a single issue; namely, the replacement of specifications on RPS MG sets with specifications on the RPS power supply monitoring systems and appropriate sur;eillance requirements; e) The proposed amendment is therefore a Class III amendnent for Unit 2 and a Class I amendnent for Unit 1.

l l

L- -__________________m