ML19225B011
| ML19225B011 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/19/1979 |
| From: | Verrelli D Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| TAC-43083, TAC-43202, TAC-43282 NUDOCS 7907230318 | |
| Download: ML19225B011 (3) | |
Text
[&* **%g UNITED STATES Do NUCLEAR REGULATORY COMMISSION yi..,, *j W ASHINGTON, D. C. 20555
{ ',-
j 5
j June 19, 1979
.s Docket No. 50-321 LICENSEE:
Georgia Power Company FACILITY:
HATCH UNIT NO. 1
SUBJECT:
MEETING
SUMMARY
A meeting was held with representatives from Georgia Power Company 1.
in Bethesda, Maryland on June 13, 1979.
The purpose of the meeting was to discuss the licensee's proposed instrumentation changes for Hatch Unit No. I which are to be completed prior to operation for Specific items of discussion included:
Reactor Protection Cycle 4.
System (RPS) Power Supply, end-of-cycle recirculation pump trip (E0C RPT) and themal power monitor (TPM). A summary of the results of the meeting follows:
a.
RPS Power Supply The staff indicat2d that the licensee should provide additional
- nfomation to that contained in their June 4,1979 letter.
In particular, the licensee should address the level of pro-tection and surveillance that would detect failure of the alternate power supply. The licensee should verify the Class IE design of this source and that the range of protective relaying provides adequate protection for the equipment being supplied power.
b.
E0C RPT The staff determined fr.am its preliminary review of the schematic diagram that the design implementation of the EOC RPT at Hatch 1 is different from what has been previously licensed on a similar The staff stated that it would be necessary to review reactor.
these differences further to verify the design adequacy prior to licensing the E0C RPT for Hatch.
c.
Thermal Pcwer Monitor The staff indicated that the licensee should functionally verify that the ficw-biased APRM trip capability has not been affected by the addition of a 5 second delay to the existing logic.
m J
700723ct S 3 108
. 2.
A list of Attendees is attached.
I i
/[ co '
obtu-Dav d M. Ve elli, Project Mariager 0p rating P actors Branch #3 Division of Operating Reactors 413 106
ATTENDANCE LIST NRC - G_Pg MEETING June 13,1979 Bechtel C. Feltman L. Rowe EG&G_ INRC consultant)
S. Udy NRC D. Vercelli P. Boehnert J. Beard M. Mendonca R. Bottimore GPC W. Burns J. Betsell M. Doyle lID 4l3 Efi$