Revised Monthly Operating Rept for Oct 1989 for Wolf Creek Generating Station
ML20005G798
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/31/1989
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20005G780 List:
References
NUDOCS 9001230103
Download: ML20005G798 (1)


Text

WAktachmentto'NO 90-0014-v, , ,

l OmmNG Dm REP =r DOCKET NO. 50-482 NOLF CREEK GENERATI!G STATICH WOLF CREEK NUCLEAR OPERATI!G OCRPCRATICN DATE 11-01-89 OCMPLETED BY M. Willian=

TELEPfENE316-364-8831 i

' OPERATING EEASUS l'. Reporting Period Octt-w, 1989 Gross Hours in Reporting Period: 745

2. Currently Authorized Power Isvel(Mt):_33J.1 Nax. Depend. Capacity (NWe-Net) .JJ.35

' Design Electrical Rating (M4e-Net): 1170

3. - Power Isvel to Which Restricted (If Any)(he-Net): N/A

.4.= Reasons for restriction (If Any): N/A j

'Ihis Month Yr to Date. Cunulative  ;

5. Number of Hours Reactor was Critical 745.0 7,251.3 28,835.4
6. -

Reactor Reserve Shutdown Hours 0.0 0.0 339.8

7. Hours Generator on Id.ne 745.0 7.155.6 28,323.1 1
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1

9 .~ Gross 'Ibemal Energy Generated (NHH) 2,465,235 23,918,602 93,490,719 l l -: 10. Gross Electrical Energy Generated (NHH) 866,128 8,353,629 32,522,834 l

11. - Net Electrical Energy Generated (NHH) 831,317 8,017,985 31,031,091

,12.. Reactor Service Factor 100.0 99.4 79.0

13. Reactor Availability Factor 100.0 99.4 80.0 1s

' 14 -. Unit Service Factor 100.0 98.1 77.6 15.. . Unit Availability Factor 100.0 _ _ _

98.1 77.6

16. Unit Capacity Factor (Using MDC) 98.3 96.8 75.3 17.. Unit Capacity Factor (Using Design NNe) 95.4 93.9 72.7
18. : Unit Forced Outage Rate 0.0 0.7 4.8 19.' Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):

Refueling Outage on March 15, 1990, for 70 days.

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A Wolf Creek Generating Station pp[2$D00k$Oob82 Monthly Operating Report R PDC October 1989 Page 2 of 5