WAktachmentto'NO 90-0014-v, l
OmmNG Dm REP =r DOCKET NO.
50-482 NOLF CREEK GENERATI!G STATICH WOLF CREEK NUCLEAR OPERATI!G OCRPCRATICN DATE 11-01-89 OCMPLETED BY M. Willian=
TELEPfENE316-364-8831 i
' OPERATING EEASUS l'.
Reporting Period Octt-w, 1989 Gross Hours in Reporting Period: 745 2.
Currently Authorized Power Isvel(Mt):_33J.1 Nax. Depend. Capacity (NWe-Net).JJ.35
' Design Electrical Rating (M4e-Net): 1170
- 3. - Power Isvel to Which Restricted (If Any)(he-Net):
N/A
.4.= Reasons for restriction (If Any):
N/A j
'Ihis Month Yr to Date. Cunulative 5.
Number of Hours Reactor was Critical 745.0 7,251.3 28,835.4 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
Hours Generator on Id.ne 745.0 7.155.6 28,323.1 1
8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 1
9.~ Gross 'Ibemal Energy Generated (NHH) 2,465,235 23,918,602 93,490,719 l l -:
- 10. Gross Electrical Energy Generated (NHH) 866,128 8,353,629 32,522,834 l
- 11. - Net Electrical Energy Generated (NHH) 831,317 8,017,985 31,031,091
,12.. Reactor Service Factor 100.0 99.4 79.0
- 13. Reactor Availability Factor 100.0 99.4 80.0 1s
' 14 -
Unit Service Factor 100.0 98.1 77.6 15... Unit Availability Factor 100.0 98.1 77.6
- 16. Unit Capacity Factor (Using MDC) 98.3 96.8 75.3 17.. Unit Capacity Factor (Using Design NNe) 95.4 93.9 72.7
- 18. : Unit Forced Outage Rate 0.0 0.7 4.8 19.'
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):
Refueling Outage on March 15, 1990, for 70 days.
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
N/A Wolf Creek Generating Station pp[2$D00k$Oob82 Monthly Operating Report R
PDC October 1989 Page 2 of 5