ML20005G787
| ML20005G787 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/31/1989 |
| From: | Mike Williams WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | |
| Shared Package | |
| ML20005G780 | List: |
| References | |
| NUDOCS 9001230091 | |
| Download: ML20005G787 (1) | |
Text
i.4 : Att'achmehtito NO.90-0014' l
OPERATI!G DPOL REP @T DOCKET 10.
50-482 NOLF GEEK GENER,WIlG STM' ION NOLF CREEK NUCLEAR OPERATIIG ONP@ATION IATE 06-01-89 O NPLETED BY M. Wi11iama TELEPIENE316-364-8831 OPERATDG STM'US 11.
Reporting Period:
Nav, 1989 Gross Hours in Reporting Period: 744 2.=
Currently Authorized Power Isvel(MWt) 3.jJJ, Max. Depend. Capacity (MWe-Net): 1135 Design Electrical Rating (MNe-Net):
1170 3.
Power Imvel to Which Restricted (If Any)(Mwe-Net):
N/A 4.
Reasons for restriction (If Any):
N/A
'1his lenth Yr to Date Cunnlative
~5.
Number of Hours Reactor was Critical 744.0 3,578.3 25,162.4 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
Hours Generator on Line 744.0 3,487.2 24,654.7 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Themal Energy Generated (MHH) 2,479,413 11,666,181 81,238,298 l
- 10. Gross Electrical Energy Generated (16H)-
858,914 4,084,180 28,253,385
- 11. Net Electrical Energy Generated (MHH) 824,541 3,921,745 26,934,851
- 12. Reactor Service Factor 100.0 98.8 76.7
- 13. Reactor Availability Factor 100.0 98.8 77.7
- 14. Unit Service Factor 100.0 96.3 75.2
- 15. Unit Availability Factor 100.0 96.3 75.2 16.~
Unit Capacity Factor (Using MDC) 97.6 95.4 72.7
- 17. Unit Capacity Factor (Using Design NHe) 94.7 92.5 70.2
- 18. Unit Forced Outage Rate 0.0 1.4 5.5
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None.
'20.
If Shut Down at End of Report Period, Estimated Date of Startup:
N/A Nolf Creek Generating Station i
hDR bb82 Monthly Operating Report O
R PDC May 1989 Page 2 of 5
-