Revised Monthly Operating Rept for Sept 1989 for Wolf Creek Generating Station
ML20005G792
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/30/1989
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20005G780 List:
References
NUDOCS 9001230097
Download: ML20005G792 (1)


Text

'AtNchmenttoN090-0014-1 OPERATING DATA REPWT DOCKET NO. ~50-482 NOIE CREEK GENERATI!G STATIN WOLF CREEK NUCLEAR OPERATING ONPNATIW DATE 10-01-89 O NPLETED BY M. Williams TELEP10NE316-364-8831 OPERATIIG STATUS 1., Reporting Period:

Seotenbar, 1989 Gross Hours in Reporting Period: 720

2. - Currently Authorized Power Isvel(let):_3411 Max. Depend. Capacity (NNe-Net),_ll).5 Design Electrical Rating ()Me-Net):

1170

'3.

Power Isvel to Which Restricted (If Any)(We-Net):-

N/A 4.

Reasons.for restriction (If Any):

N/A

'Ihis Month Yr to Date O - lative 5.- Number of Hours Reactor was Critical 720.0 6,506.3 28.090.4

' 6.1 Reactor Reserve Shutdown Hours 0.0 0.0 339.8

'7.

Hours Generator on Line 720.0 6,410.6 27,578.1 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross 'Ihannal Energy Generated (MNH) 2,407,152 21,453,367 91,025,484 l

10. Gross Electrical Energy Generated (IMH) 839,699 7,487,501 31,656,706
11. Net Electrical Energy Generated (NHH) 805,793 7,186,668 30,199,774
12.- Reactor Service Factor 100.0 99.3 78.6

'13.

Reactor Availability Factor 100.0 99.3 79.6

14. Unit Service Factor 100.0 97.9 77.2
15. Unit Availability Factor 100.0 97.9 77.2
16. Unit Capacity Factor (Using NDC) 98.6 96.7 74.8
- 17. Unit Capacity Factor (Using Design NWe) 95.7 93.8 72.2
18. Unit Forced Outage Rate 0.0 0.8 5.0
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):

Refueling Outage on March 15, 1990, for 70 days.

20. If Shut Down at End of Report Period, Estimated Date of Startup:

N/A Wolf Creek Generating Station khoh[ [hh[g'2, Monthly Operating Report 16 D

R September 1989 Page 2 of 5