Text
.
AttachmNt'to?NO 90-0014-
[
1; L
OPERATIIG DATA REPCRT
~
DOCKET NO.
50-482 L
NOLF CREEK GENERATI!G S'IATIN KILF CREEK NUCLFAR OPERATI!G CWPORATICN DATE 08-01-89 ONPIETED BY M. Wi114a==
TELEPIENE316-364-8831
' OPl!RATDG SDSUS 1.. Reporting Periods-Julv, 1989 Gross Hours in Fmporting Period 744 2.
Currently Authorized Power level (MRt):,_3D,1 Max. Depend. Capacity (MNe-Net): 1135
' Design Electrical Rating (MWe-Net):__,1170 3.
Power Isvel to Nhich Restricted (If Any)(We-Net):
N/A
'4.
Reasons for restriction (If Any):
N/A
'1his Month Yr to Date Cunulative L 5.
Ntznber of Hours Reactor was Critical 744.0 5,042.3 26,626.4 16./ Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
Hours Generator on Idne 739.5 4.946.6 26,114.1 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 L
9.
Gross 'Ihermal Energy Generated (MHH) 2,462,595 16,553,150 86,125,267 l L
- 10. Gross Electrical Energy Generated (MHH) 852,303 5.782,117 29.951,322 1
11._ Net Electrical Energy Generated (M W) 816,829 5,550,876 28,563,982
- 12.. Reactor Service Factor 100.0 99.1 77.7 l
.13.- Reactor Availability Factor 100.0 99.1 78.7 L
- 14.. Unit Service Factor 99.4 97.2 76.2 l.
- 15.. Unit Avai1ahility Far, tor 99.4 97.2 76.2
- 16. LUnit Capacity Fad.or (Using MDC) 96.7 96.1 73.8
- 17.. Unit Capacity Factor (Using Design NNe) 93.8 93.3 71.2
-18.
Unit Forced Outage Rate 0.0 1.0 5.2
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None.
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
N/A 9r_IO123 g9 Wolf Creek Generating Station 0
82 Monthly Operating Report
>PDR A
PDC July 1989 R
Page 2 of 5 i.