Revised Monthly Operating Rept for Mar 1989 for Wolf Creek Generating Station
ML20005G785
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/31/1989
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20005G780 List:
References
NUDOCS 9001230088
Download: ML20005G785 (1)


Text

,

, LAttachment to NO 90-0014 OPERATI!G DATA REP @T DOCKET NO.

50-482 NOLF CREEK GPJ3ERATING STATICH NOLF CREEK NUCLFAR OPERATDG ONPCRATION DATE 04-01-89 CXMPIETED BY M. Willians TELEPIKNE316-364-8831 OPERATDG SDSUS 1,. Reporting Period:

March, 1989 Gross Hours in Reporting Period: 744 2.

Currently Authorized Power Isvel(MNt):_3111 Max. Deperxi.- Capacity (NNe-Net):_1LM

Design Electrical Ratfag (MNe-Net): 1170

.3.

Power Imvel to Nhich Restricted (If Any)(Mwe-Net):

N/A L4 ' Reasons for restriction (If Any):

N/A

'1his Month Yr to Date Cuna11ative o

5., Number of Hours Reactor was Critical 744.0 2,115.3 23,699.4 6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.

Hours Generator on Lile 744.0 2,024.2 23,191.7 8.' Unit Reserve Shutdown Hours 0.0~

0.0 0.0

'9.

Gross '1hermal Energy Generated (NEI) 2,533,016 6,740,962 76,313,079 l 104 - Gross Electrical Energy Generated (NEI) 890,906 2,366,238 26,535,443

11.. Net Electrical Energy Generated (NHH) 857,870 2,271,319 25,284,425 s
12. Reactor Service Factor 100.0 97.9 75.6
13. Reactor Availability Factor 100.0 97.9 76.7
14. Unit Service Factor 100.0 93.7 74.0 15.- Unit Avai1ahi14ty Factor 100.0 93.7 74.0

' 16.. Unit Capacity Factor (Using NDC) 101.6 92.6 71.5 I

17. Unit Capacity Factor (Using Design MWe) 98.6 89.9 68.9
18. Unit Forced Outage Rate 0.0 2.5 5.8
19. -Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None.

L 20.'

If Shut Down at End of Report Period, Estimated Date of Startup:

N/A Wolf Creek Generating Station 900123Oop_:e 900116 Monthly Operating Report l

PDR ADOCK 0500 March 1989 R