ML20005G791

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1989 for Wolf Creek Generating Station
ML20005G791
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/31/1989
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20005G780 List:
References
NUDOCS 9001230095
Download: ML20005G791 (1)


Text

'

i- /sttachmentito NO 90-0014

'-r OPl! RATING DP&A REPORT DOCKET NO.

50-482 NOLF CREEK GENERATING STATICH WLF CREEK NUCLEAR OPERATDG CXRPCRATICN DATE 09-01-89 OCHPIRI'!!D BY M. Williams TELEPIKME316-364-8831 OPERATDG SDSUS

16. Reporting Period:

Anaust, 1989 Gross Hours in Rcptrting Period 744 2

Currently Authorinad Power Isvel(MNt): lD1 Max. Depend. Capacity (M9e-Net):_,ll))

. Design Electrical Rating.(l@e-Net):= 1170 l3. Power Isvol to Which Restricted (If Any)(Mwe-Net):

N/A 4~

Reasons for restriction (If Any):

N/A Uhis Month-Yr to Date Cunulative.

5.

Number of Hours Reactor was Critical 744.0 5,786.3 27,370.4 6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.

Hours Generator on Line 744.0 5.690.6 26,858.1

. 8.' Unit Reserve Shutdown Iburs 0.0 0.0 0.0 9.

Gross Uhennal Energy Generated (NHH)

,2,493,065 19,046,215 88,618,332 l

10. Gross Electrical Energy Generated (MEI) 865,685 6,647,802 30,817,007 111. Net Electrical Energy Generated (MHH) 829,999 6,380,875 29,393,981
12. Reactor Service Factor 100.0 99.2 78.2
13. Reactor Availability Factor 100.0 99.2 79.1
14. Unit Service Factor 100.0 97.6 76.7
15. Unit Availability Factor 100.0 97.6 76.7
16. Unit Capacity Factor (Using MDC) 98.3 96.4 74.3
17. Unit Capacity Factor (Using Design MWe) 95.3 93.5 71.7

-18.

Unit Forced Outage Rate 0.0 0.9 5.1

.19.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None.

20. If Shut Down at End of Repart Period, Estimated Date of Startup:

N/A 9001230095 900116 Wolf Creek Generating Station ADOCK0500p,g82 Monthly Operating Report PDR R

August 1989 Page 2 of 5