76
' Att'achmedt to' N0 90-0014
\\
'1 DOCKET NO.
50-482
]
Nat.F mEEx GmERAT1NG SmT1m NOLF CREEK NUCLEAR OPERATING OTPTATIN i
DATE 03-01-89 ONPIRIED BY M. Willia==
TELEPH21E316-364-8831 OPERATDG SIA'IUS 1.
Reporting Period:
Febr - v, 1989 Gross Hours in_ Reporting Period 672 2.
Currently Authoriseci Power Isvel(NWC):_J(ll Max. Depend. Capacity (MNe-Net):_113 5 Design Electrical Rating (NWe-Net): 1170
- 3. ' Power Isvel to Which Restricted (If Any)(Mwe-Net):
N/A 4.
Reasons for restriction (If Any):
N/A Shis Month Yr to Date 0 - 1ative 5.
Number of Hours Reactor was Critical 637.4 1,371.3 22,955.4 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.. Hours Generator on Line 629.9__
1,280.2 22,447.7 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Shermal Energy Generated (NHH) 2,112,860 4,207,946 73,780,063 - l
- 10. Gross Electrical Energy Generated (NHH) 740,328 1,475,332 25,644,537
'11.
Net Electrical Energy Generated (NHH) 710,484 1,413,449 24,426.555
- 12. Reactor Service Factor 94.9 96.8 75.0 L
- 13. Reactor Availability Factor 94.9 96.8 76.1 1
L
- 14. Unit' Service Factor 93.7 90.4 73.4
- 15. Unit'Avai1ahility Factor 93.7 90.4 73.4
- 16. Unit Capacity Factor (Using MDC) 93.2 87.9 70.7
- 17. Unit Capacity Factor (Using Design NWe) 90.4 85.3 68.2
=18..
Unit Forced Outage Rate 6.3 3.8 6.0
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None.
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
N/A 9001230087 90011,3 Wolf Creek Generating Station
{DR ADOCK 05000482 Monthly Operating Report PDC February 1989 Page 2 of 5