- Ath. achr 6ent to N0 90-0014 -
l N N REPW T c
D03ET NO. 50-482 WJLF G EEK GENERATING STATIW NOLF CREEK NUCLEAR OPERATDC CORPCRATICM DATE 05-01-89 O NPLETED BY M. Williams TELEPIKEE316-364-8831 OPERATING SDmlS 1.
Reporting Periods-
- Anril,1989 Gross Hours in Reporting Period:
719 2.-
Currently Authorized Power Isvel(NWt): 3411 Nax. Depend. Capacity (NWe-Net) ll3ji Design Electrical Rating (NWe-Net): 1170 3.
Power Isvel to Which Restricted (If Any)(Mwe-Net):
N/A 4.' Reasons for restriction (If Any):
N/A This Mcnth Yr to Date 0 - 1ative 5.. Number of Hours Reactor was Critical 719.0 2,834.3 24,418.4 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
Hours Generator en Line 719.0 2,743.2 23,910.7 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Thennal Energy Generated (NHH) 2,445,806 9,186,768 78,758,885 l
- 10. Gross Electrical Energy Generated (NHH) 859,028 3.225,266 27,394,471
- 11. Net Electrical Energy Generated (NHH) 825,885 3,097,204 26.110,310
- 12. Reactor Service Factor 100.0 98.4 76.2
- 13. Reactor Availability Factor 100.0 98.4 77.2
- 14. Unit Service Factor 100.0 95.3 74.6
- 15. Unit Availability Factor 100.0 95.3 74.6
- 16. Unit Capacity Factor (Using NDC) 101.2 94.8 72.2
- 17. Unit Capacity Factor (Using Design NWe) 98.2 91.9 69.6
- 18.. Unit Forced Outage Rate 0.0 1.8 5.7
- 19. Shutdowns Scheduled Over Next 6 m nths (Type, Date, and Duration of each): None.-
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
N/A a
gS on 9001230089 900116 PDR ADOCK 05000482 Nonthly Operating Report R
PDC April 1989 i
Page 2 of 5