05000321/LER-1981-029-01, /01T-0:on 810413,supports G31-RWCUH-57,P41-SWH-96, P41-SWH-143 & P41-SWH-169 Were Discovered to Exceed Design Requirements Per IE Bulletin 79-14 Review.Caused by Weight Plus DBE Seismic Loads.Supports to Be Modified or Repla

From kanterella
(Redirected from ML20003G461)
Jump to navigation Jump to search
/01T-0:on 810413,supports G31-RWCUH-57,P41-SWH-96, P41-SWH-143 & P41-SWH-169 Were Discovered to Exceed Design Requirements Per IE Bulletin 79-14 Review.Caused by Weight Plus DBE Seismic Loads.Supports to Be Modified or Replaced
ML20003G461
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/23/1981
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003G457 List:
References
IEB-79-14, LER-81-029-01T, LER-81-29-1T, NUDOCS 8104290498
Download: ML20003G461 (2)


LER-1981-029, /01T-0:on 810413,supports G31-RWCUH-57,P41-SWH-96, P41-SWH-143 & P41-SWH-169 Were Discovered to Exceed Design Requirements Per IE Bulletin 79-14 Review.Caused by Weight Plus DBE Seismic Loads.Supports to Be Modified or Replaced
Event date:
Report date:
3211981029R01 - NRC Website

text

NHC F 00T.136G U.S. NUCLEAR REGULATORY COMMISelON l111)

LICENSEE EVENT REPORT

' )

CONT ROL BLOCK: ( l l

l l

l l

(PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 I G l A l E l I l H l l l@l 0101-1010lo1010l-1010l@l41111Illil@l I

l@

7 8 9

' LICENSE'E CODE 14 15 LICENSE NUM8EH 23 20 LICENSE TYPE JO b7 GAI 68 C

T 10111

% Z LLl@l 01 s l o l 0101312111Gl o l 411 131 a l 1 1@l 1412I31811 l@

7 8

t,0 61 DOCKET NUMisER 68 t>9 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBAULE CONSEoVENCES h O 2 10n 4-10-81, the AE conducted a surveillance walkdown of pipe supports IO ia l l pe r IEB 79-14.

On 4-13-81, it was discovered that supports G31-RWCUH-l Inl41157, P41-SWH-96, P41-SWH-143, and P41-SWH-169 failed the functionality 1

10151: criteria for 1EB 79-14.

This is a repetitive occurrence - see LER 50-l O c 1321/1980-122.

tlo system operability was affected.

There were no ef-l 10171 l fects on public health or safety.

Unit I was already shutdown for a re'1 lOla l l fueling / torus modification outage.

I 80 7

8 9 DE COD

$ BC E COMPONENT CODE SUSC DE SU E

l C l G l@ [f j@ l E l@ l Sl Ul Pl 01 Rl Tlh [B_j@ [Z_j @

10191 t

7 8

9

  • 10 11 12 13 18 19 20 SEQUE NTI AL OCCURRENCE REPORT REVISION LE RinO EVENT YEAR REPORT NO.

CODE TYPE N O.

O,agg 18 11 I L-J 10 12 19 I L_J l 01 11 1TI l-1 W

21 22 23 24 26 27 28 29 30 31 32 TAKE A T ON ON PL NT ET HOURS S BL IT ED FOR h 8.

SUPPL R MAN FACTURER "j

Lx_J@l ^ I@

LZ_l@

Lzj@

l0101010l I yig i nig lA l@

lB l2 10 19 l@

33 34 ab M

31 40 44 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h lilOI IThe desian reauirements of the suonorts were exceeded.

The ma te ri al s' l

}i lil Ivield stresses were exceeded and sunoorts had deflections of over 1/4" I

las a result of the weight plus DBE seismic loads.

These supports will bei i,#2i l li j al l modified or replaced prior to startup such that the requirements of I

! ii l4 l l Tech Specs 6.9.1.8.1 are satisfied.

I 80 7

8 9 STA S

% POWER OTHER STATUS 015 Ov i Y DISCOVERY DESCRIPTION [Gj@ l010l0l@l NA l

lBl@l Surveillance of pipe supports l

i 5

' !riv:T <

A CO icei HFLEAtf'O OF RE LE ASF AMOUNT C5 ACTIVITY LOCATION OF RELE ASE l1161 Lzj @ Wgl NA l

l NA l

7 8 9 10 tt 44 45 80 PLR50N NE L f APOM.,HES NU'.'H F H TYPE DE SCRif* TION -

l 1ilil l Oi 0l 0l@l Zl@L NA

,mSONd',N>u'LS ouCn,PfiON@

Nu n R l 0l 0l 0l@l NA l

7 8 9 11 12 80 L OSS OF OH OAMAGE TO FAlf LITY TYPE DE SCitiP T ION lil91 Lzj@l NA l

80 7

si 9 lu 121011tif@l NA i

liiiiiiiiiiill 155t' OCSCHiPTION 810429054%

e c

LER #:

50-321/1981-029 Licensee:

Georgia Power Company Facility Name:

Edwin I. Hatch Docket #:

50-321

Narrative

Report for LER 50-321/1981-029 On 4-10-81,. with Unit 1 shutdown for a refueling / torus modif-ication outage the AE conducted a surveillance walkdown of

~

pipe supports per IEB 79-14.

On 4-13-81, the site was notif-ied by the AE that supports G31-RWCUH-57, P41 - SWil-9 6, P41-SWH-143, and P41-SWH-169 failed the support functionality criteria for IEB 79-14.

This is a repetitive occurrence see LER 50-321/1980-122.

There were no effects on public health or safety.

No system operability was affected.

Supports G31-RWCUH-57, P41-SWH-96, and P41-SWH-169 had stres-ses in structural members resulting from weight plus DBE scis-mic loads exceeding the materials yield stresses.

Supports 9

P41-SWH-143 and P41-SWH-169 had deflections of over 1/4" resulting from weight plus DBE seismic loads.

Supports will be modified or replaced as necessary prior to startup such that the requirements of Tech Specs 6.9.1.8.I are satisfied.