ML20003G457

From kanterella
Jump to navigation Jump to search
Forwards LER 81-029/01T-0
Date released: 01/17/2020 Download: ML20003G457


LER 81-029/01T-0:on 810413,supports G31-RWCUH-57,P41-SWH-96, P41-SWH-143 & P41-SWH-169 Were Discovered to Exceed Design Requirements Per IE Bulletin 79-14 Review.Caused by Weight Plus DBE Seismic Loads.Supports to Be Modified or Replaced
ML20003G461
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/23/1981
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003G461 (2)
Forwards LER 81-029/01T-0
ML20003G456
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/23/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003G456 (1)