Notifies of Mods Required Re Facility Emergency Notification Sys & Health Physics Network,As Result of NRC Review.Nrc Will Install Lamps Near Emergency & Telephones & Output Jacks in Communication Lines
ML19351F046
Person / Time
Site: Beaver Valley
Issue date: 11/14/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dunn C
DUQUESNE LIGHT CO.
References
TAC-46068, NUDOCS 8012290006
Download: ML19351F046 (2)


Text

f iIk

[v.snua, v

o UNITED STATES

! ' j w (',i NUCLEAR REGULATORY COMMISSION s g((.- l REGION I 0,, i g

631 PARK AVENUE

%'V

,o#

KING OF PRUSSIA, PENNSYLVANIA 19406 y

g g

Docket No. 50-334 NOV 141980 5

E S50

$3 o

i Duquesne Light Company M!;=

fag ATTN:

Mr. C. N. Dunn

@g6, y

O '.

Vice President

'3 M

Operations Division g

co g

435 Sixth Avenue C

y Pittsburgh, Pennsylvania 15219 Gentlemen:

The NRC has reviewed existing emergency communications systems with its licensees and as a result, certain modifications will be made to the equipment associated with the Emergency Notification System (ENS) and the Health Physics Network (HPN).

The following changes will be initiated in the near future.

The NRC will have lamps installed on emergency telephones in all Control Rooms, Technical Support Centers, and Emergency Operations Facilities.

These lights will indicate when the phone is ringing and should be helpful in those areas where many phones are located.

The NRC will also install output jacks on one extension of the Emergency Notification System and one extension of the Health Physics Network.

These jacks will provide the capability for adding one-way speakers to these systems.

Two-way (talk-listen) speaker systems will not be permitted because they would add additional and unnecessary parties to the conversation which potentially could cause some confusion and possibly hinder the transmission of necessary plant data.

Headsets for use by the operators using these jacks will also not be permitted due to safety considerations.

The NRC is presently considering l

possible alternatives to meet the mobility requirements of operators using the ENS.

l Although the NRC will pay for the installation of these Jacks, any plant desiring a one-way speaker must purchase that equipment frem their local phone company.

Please select one location for each of the systems (ENS and HPN),

not to include the control rooms, for installation of the output jacks and inform Dr. Charles Gallina at this NRC Regional Office of your selection.

Sincerely, 4

W l

ce H. Grier irector

Contact:

Dr. Charles Gallina (215-337-5275) l 8012090006

Duquesne Light Company 2

cc:

F. Bissert, Technical Assistant Nuclear R. Washabaugh, QA Manager J. Werling, Station Superintendent G. Moore, General Superintendent., Power Stations Department J. J. Carey, Director of Nuclear Operations R. Martin, Nuclear Engineer J. Sieber, Superintendent of Licensing and Compliance, BVPS I