LER-1981-010, /03L-0:on 810217,after Routine Shutdown,Rcs Sampling Revealed That Dose Equivalent I-131 Exceeded Tech Specs.Caused by Leaking Fuel & Anticipated Dose Equivalent Iodine Transient.Purification Flow Increased |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 3021981010R03 - NRC Website |
|
text
!.!CENSEE EVENT RE.:C AT EXHI3IT J cenract st::c 1 i
f f
I f
l@
sp. zA:s acia r ca ; vet n. at:.;ing: macaucess e
l g; i g 0 0 go i O rgj
- 1,2. glg a
lo s i J l? l Li C ?.) ? 3 Ig-l>010-l-1 O i 0l 01 i
1
. Caus,-...
a a
casu
..s w
utsu a c::a C:NT 7 8: 1-@l0 31113:8i1 G
,.,'*,"y[ L '@l 01 510, -10 1 310 I 2 'gl 0 : 2 i 1 1 loei!
P 64 _
68
- CEST %*.988 e4 48 4 v i,f ;4 71
- 4 il a g e;a ? ;ar y 4;
svsur erscaimes Ano eacsasu c,ss:.aNers @
r go,:j ; At 1515 after routine shutdown it was discovered by Reactor Coolant System sampling that the Dose Equivalent I-131 exceeded 1.0 microcuries per gram. This created toe ) I an event contrary to T. S. 3.4.8.
Redundancy NA. There was no effect upon the This is the twentieth event reported
,,,,), health or safety of the general public go,.j t under this Specification.
Istil f f
1089i l 4
C On*,
wa6vt sysT1u CAL;18 Cabst C ct C:
SbS ::t C 's*C,1,r t: t sba c::t 3;4c;;g isisi I z i z i@ IX I@ 12 l@ l 21212 I zi z i z i@ [.z_j@ gr @
n n
u..
%,7....
i'Jsi0^2
"l'i"-
"T"
@ Aig; 18 11 I t--J l01110l
[,d 1013]
lLl
(--!
l0 l
_v
=
=
s.
u
- s a
a u
2 u
n= 'r?'5 Mis'.i.'?d:,
"!!,'.5 '
,,52l?2.!;;.
,Cf0 Sc".!
c','!!Er
'"#s?.".
.eu.
LX_.f@lz ig i zig i zi@
i01010roi w @
i Nrg i zi@
l z i 91 91 9; u
2 a
crusc :ss:aime.un:::aas:nvs 4,- isss The cause of tflis event is attributed to leakina fuel or "Tramo Unanium" (i.e.,
s i.o i :
,,,,, g uranium in the cladding within one recoil radius of the surface) and an anticipated
,, Dose Equivaient 'odine transient following a Reactor Coolant System transient.
RCS purification flow was increased; Dose Equivalent I-131 was less than 1.0
,,,,,g g...)i microcuries per gram at 1400 February 18. 1981.
7 3 p awa= st.r.:s @
EsE:*EN
- se:vtav :nca.e=
'WC se:wea li i s J LGJ@ 10 I O I O l@l NA I
IBl@l Technician analysis
_fa a
li n i t_z J @...=%. imLIJ@l tocr.s.....,u,@
'.!m,r.
. 2,....,A,.r. @ l c
,1 N
l NA
..s*
,..,,.'s...e.S o f i e ? I l 0. 5.. @r zig [ u:
., @ NA l
0;
,,..:,, Ab'J.o Cu:n -e,.@
1 w,,..
lii.]I0101Ol@l NA o
,a',c";,=e';sg "a" @
I NA le#,)L.Zj@l
~aei.5r ~
.,,..,Y '*,7 1: a e 1 [._H,[gl NA f.IIIIIIIII8 II I
Name of Preparer:
g 90 795-6l.86
a (S:"'. ATT.J.m SL'??LE2fE2C).P.! Di?OP.Pa. ICN 5 - a)
SUPPLEMENTARY INFORMATION Report No.:
50-302/81-010/03L-0 Facility:
Crystal River Unit 3 Report Date:
March 13, 1981 Occurrence Date:
February 17, 1981 Identification of Occurrence:
Primary Coolant Dose Equivalent I-131 was greater than 1.0 microcuries per gram contrary to Technical Specification 3.4.8.
Conditions Prior to Occurrence:
Mode 3 (Hot Standby, 0%)
Description of Occurrence:
At 1515 after routine shutdown, it was discovered that Dose Equivalent I-131 exceeded 1.0 microcuries per gram. This determination was made by analysis of a Reactor Coolant sample drawn at 1315.
Designation of Apparent Cause:
The cause of this event is attributed to leaking fuel or
" Tramp Uranium" (i.e., uranium in the cladding within one recoil radius of the surface) and an anticipated Dose Equiva-lent Iodine transient following a Reactor Coolant System transient.
Analysis of Occurrence:
There was no effect upon the health or safety of the general public.
Corrective Action
The Reactor Coolant System flowrate through the Makeup and Purification System was increased. Dose Equivalent I-131 was determined to be less than 1.0 microcuries per gram at 1400 on February 18, 1981.
Failure Data:
This is the twentieth event reported under this Specification.
/rc
- - Q
\\
REACTOR POWER HISTORY OF PRIOR FORTY-EIGHT (48) HOURS ITEM I Event Date:
February 17, 1981
1 i
NATE 2,15,81 C) ma..... u.m -n..._
TUfu... 5 _.. d.J L._.._J. _ _. J.c.
, G.__.s.,...u_
...,r
.u
- E730)
(
B".6 i fPT3~i (F723i NI.'M7. M E. ' h '-
=/*FF BTU /KlJH
w c c.._. s l.. L. D.... e.. e.. : s.._ a. L. u,
..,,. ~n..E....
.w.
.I.
2 97.78 10100 98.95 101.00 1.020
.983
'8 97.78 9880 98.93 301.00 1.020
.968 ti 9.7.,2n enan os ou aos nn 1 n64 ee-li.
5 97.78 10300 99.02 101.00 1.020
.987
.U.
6 77.78
.10100 99.02 101.00 1.020
.957 8".Lt 6 9EED_
S'.c5 9.8.00 1.061
.99u 1:
7 a
6 73.33 9650 7t+. 5 9 80.00 1.072
.953 2
2 9
72.63 98S0 73.90 79.50 3.076
.953 7
1n 7.1 4A 9BS D._
73.'"'
'LO.D D 1.n7u
- _ov, 11 72.05 9880 73.57 75.00 1.060
.979 12 71.93 9800 73.?4 78.00 1.055
.973
.__r 1,
a+
e3 a g-.
-.gr
,p n g _.., 3 : e _.
e, e _..
l' 14 71.70 9880 73.82 78.00 1.057
.971 15 73.70 9080 73.37 75.00 3.063
.977 1A 71.11 9nao 23 22._
75.on 1.nA4
_97n E
17 71.46 9880 74.23 77.00 1.037
.963 16 81.52 9830 82.40 S6.00 1.043
.939 1_ _ _ ic Ae.eu 9 eon 71.,2 6 72 J1r i.n76
_c7u il 20 71.81 9880 72.84 79.00 1.085
.986 E'
21 71.23 9880 73.21 78.00 3.065
.973
{
0 22 71.13 9800 71.E.C 76.G3 1 M ;...._. 967 il 23 71.46 9880 7ti. 27 7 0. (,0 1.051 963 2
24 71.35 9080 73 4; 78.00 1.063
.972 21.
orF ave e Ar;.j _JM,ILY GERE FETOP _REDEE._
675.62_liUHAE1. -
AVERAGE DAILY THERMAL POWER 1977.96 MWl(T) 2 ll AVERAGE DAILY TURBINE GROSS HEAT RATE 9917 BTU /5'WH c
AvrR,.nF DAI1Y fiWJH POWEP
_ED 667_a/=FF-E
. AVERAGE DAILY NUCLEAR INST. POWER 84.646 */*FP
~
y 1
RATIO OF NI TO MWTH = 1.049 i
4:
u:
i'
~, i g" h it.
Mu b
O D
.9 s,
P00R_ORRA!
T
f. r.. _.
_...4v.C1
(!
riO*J R GMUE TURB 6
%TU t43
- RATH, E A _*. t.
t FT.. _
. t.,
- ..!s.,-
r u n 1. _ _...
.: )
ut vi tsusos t r, s.:..
T
</*FF e/aFP' a/=FP 7
1 71.11 10000 73.82 80.00 1.064
.963
... 1__., 1
.A,,Ta r,
..:.. < a c,6. c o G.,..o..
. f e.,- - - -_
71.23 10000 72.55 50 00 1.103
.952 La..
o 4
71.35 10000 74.30 79.00 1.066 963 r. c
- - wr. 7. c,.:,
o7.00
- . 01~. 'r-fM Gu-o-
7oo 3
.;. 44 s
6 96.84 1000f.
97.To 100.00 1.02;
.989 0,
0v,
,..e 7
. s.c. c, e
n,.,._.,-
10000 9 c.0...
4 4
a 7
o
.g I t UM-7 U-~15 lui.UU 1.02Y
-~ Fo o
~~
o v6.ve I
- - I T
9T.03 10006 96.24
- 00. 00 1.025 TO' 10 97.05 10000 90.-
101.00 1.027 007 12
- - 7(.uo 2 0 DTio yT N 15'4_ Ui:. _ _ I T).o __. _.,E o. __....
.v 7
12 97.05 10000 90.41 101.00 1.026
.906 7
13 97.00 10000 e5.33 201.00
- .027
.967 i
. > c,4:.~ _ -
s..
i 1 w..uu, -_-._,_ Tie,
aDv
,- f. c
. oUU
>v.se s8 A. i4 Yo.Yo i. ;
b..
15 c7.08 10000 08.25 101.00 1.029
.CBS 16 97.00 10000 98.u?
100.00 1.015
.?86 r
li
,o.76 lococ vB. %
100- 0L T UI6 19Bs 18 97.0E 10000 98.16 99.00 1.00?
.989
,i 10 9 6. 9 d.
10000 98.49 99.00 1.005
.oG4 i-
.N TE.. BC IE FD v s..n 9T 00
- 1. U UE-
~936 -
~.f 21 97.08 10000 98.33 99.00 1.007
.987 22 96.96 10000 08.37 99.00 1.006 966
-- - :- " 9 5 7 5 - 2 0 7 0 0 -~ 9 5.17 ~ ~ ? ?. 0 0 -
I. 0Ti?'- -~~. 9 F2 ' - -
h
.7 21 97.08 10000 98.20 10.00
- 1. 0.'8
.908
.r._
E AVERAGE DAILY GEiJERATOR GROSS 757.25 tiUH(E)
~
n.i_ RAGE DA!I.T Ti!E RT, AT F0Z r. ~ ~ ~ -----~ ":M5'. SC riCRTil E
AVERAGE DAILY TURDIi'E GEOSS HEAT R".'C 20000 BTU /l:UH E
AVERAGE DAILY MUTH POWER 93.619 */*FP
.:. ir.RliG'I~DA-'Iri NUCL'E Ar IN3OOUEE--
9E.}33} a / eTF"~~-- ~ ~
m._.
..}
1.020 ur. s iu ui-tu io nWin =
c T
42.
, m j
s 5
g t,
F_.
,o B...
e.
s O
r-
_ P00R OR 1N.._M._
?
l l
1
/*
.17o31 S t k. Y '
.-J 1 t f GMUE TURP G MUTh N.T R."
In f A I:
. s ;.; a'-..
!v;../t w-.
-'e t
r r..;-...
g.. e..
e g
g,a.j. )
. -, t 7..
(,
..L I
, c.
s 6, ' e I f*
[:TU,'ff yH s / o f" P c,rFF c ' c F F'.
6, e f~ i 1
97.0G 10000 9C.27 101.00 1.026
.950 00 1 007 esi _..
10 98.37 i n '.t 1'.,00v, 2
96.96
.t.
0, i.0.ao
.0, 9.e.,.., 7
> o. v.-
a t
4 06.96 10000 98.33 101.00 1.027
.?S6
~
m 5
4 6, 9 A If.pk n 95.49 101.00 1. 0 'E 20' 47.00 10000 95.61 101.00 1.024 95L 97 :. 7.
10000 95.57 10;.00 1.D2:
.c.~
o
~'
C 97.06 1_0_000 98.57 19.b j.C_ a.L pl k _ m M ".
e 7. 0 F.
20000 96.37 100.00 1.017 967 c
}
10 62.34 10000 65.42
.:,3. 01, 1.04b
. 5:
i.,
ou, c.
'.600.0 4 L8. u". _
4'<.(.0
,'.#4; v
1 12 0.00 0
. O li 0.00 0.000 0.000 v.
13 0.00 0
.an 0.00 0.000 0.000
'I 14 0.00 0
.00 0 O f' O.000 0 000 c
15 0.00 0
.00 0.00 0. l. C. 0 0.000
[
16 0.00 0
.00 0.00 0.000 0.000 17 0.00 0
.00 0. 0 r.
n.n0r 0.000 18 0.00 0
.0P 0.00 0.000 0.000 17 0.00 0
.00 0.00 0. 0 G f.
0.000
~
0.00 0.00C 0.n00 20 0.00_
0
.00 C.00 0.000 0.000 2;
C.00 0
.00
- e 2?
0.00 0
.00 0.00 0.000 0.00n 23 0.00 0
.00 0.00 0.000 0. 0 t:i f
-.. - D i 0
.o0 (i.00 0.000 0.OD 0
(
747.12 MUM (E)
'~
AVERi4GE DAILY GENERATG0, GRO5F 1017.7) MWHiT)
AVERAGE DAILY THERMAL POWER 4 5.., F.T U..l r..
En. E 0.
.n GDe
........ : Jr n:
i
~
n n.nnot,...-
Dr.,J, n o u n t..
.t 4 ). 5 0 0 * / c-F F u
7 AVEPi,GE D(-.ILY MWTH POWER
~~
AVEEAF.E DAILY NUCLEAR INST. PCIJE r 1.P.553 */.FP
=..
s
- enap RATIC OF NI 70 HWTH = 1.026
~.J.'
?
('
s i.
j.
t i
.r:
_.r 0
- - w
=
100R ORGINAL
FUEL BURNUP BY CORE REGION ITEM 2 Event Date:
February 17, 1981
f i
i i
i 4
4 4
ITEM 2:
The burnup was calculated at 168.457 EFPD for the four (4) 1 enrichment regions.
I REGION NUMBER of FA BURNUP B
9 22,785 MWD /MTU C
60 20,713 MWD /MTU D
52 10,429 MWD /MTU E
56 4,295 MWD /MTU t
AVE.
12,602.7 MWD /MTU I
l l
l 1
CLEANUP FLOW HISTORY ITEM 3:
Event Date:
February 17, 1981 i
l l
i I
l l
l l
l I
l 1
t
ITEM 3:
"B" Demineralizer 59 GPM on Feb. 15; 16; and 17th.
I I
l i
i I
t
\\
i
DEGAS OPERATIONS ITEM 4:
Event Date:
February 17, 1981 l
I e
O r
DEGAS OPERATIONS ITEM 4:
Event Date:
February 17, 1981 1755 started spraying pressurizer 2/14/81 0630 stopped spraying pressurizer 2/15/81 2020 started spraying pressurizer 2/15/81 1023 stopped spraying pressurizer 2/16/81 1755 started spraying pressurizer 2/16/81 commenced venting MUT and PZR 2/16/81 2230 termincted venting MUT andPZR 2/17/81 0510
TIME DORATION WHEN DEI-131 EXCEEDED 1.0 uCI/ml and I-131 ANALYSIS RE ITEM 5:
Event Date:
February 17, 1981 n
G ITEM 5:
As per Technical Specification 3.4.8, the four (4) hour sampling frequency as 17, 1981 and the depicted on the Table below was initiated at 1315 on fecruary The four (4) hour sampling c
Dose Equivalent I-131 was 1.77 microcuries per ml.
18, 1981 when the DEI-131 was deter-period was terminated at 1215 on February mined to be 0.674 microcuries per ml. The time duration when the specific activity of primary coolant exceeded 1.0 microcuries per ml Dose Equivalent Iodine was twenty (20) hours.
TIME DEI-131 (wCI/ml)
DATE 1.77 1315 2/17/81 1.96 1715 2/17/81 1.51 2115 2/17/81 1.17 0115 2/18/81 1.04 0415 2/18/81 0.858 0858 2/18/81 0.674 1215 2/18/81 4
9 4
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000302/LER-1981-001-01, /01T-0:on 810107,during Performance of Quarterly Battery Check SP-511,determined That Battery Did Not Meet Tech Spec Requirements.Caused by Decrease in Specific Gravity of One Cell.Battery Placed on Equalize Charge | /01T-0:on 810107,during Performance of Quarterly Battery Check SP-511,determined That Battery Did Not Meet Tech Spec Requirements.Caused by Decrease in Specific Gravity of One Cell.Battery Placed on Equalize Charge | | | 05000302/LER-1981-001, Forwards LER 81-001/01T-0 | Forwards LER 81-001/01T-0 | | | 05000302/LER-1981-002, Forwards LER 81-002/03L-0 | Forwards LER 81-002/03L-0 | | | 05000302/LER-1981-002-03, /03L-0:on 810109,containment Isolation Valve CAV-1 Failed to Close After Sampling Pressurizer Steam Space. Caused by Failed Contacts in Torque Switch of Valve Operator.Switch Replaced & Operability Restored | /03L-0:on 810109,containment Isolation Valve CAV-1 Failed to Close After Sampling Pressurizer Steam Space. Caused by Failed Contacts in Torque Switch of Valve Operator.Switch Replaced & Operability Restored | | | 05000302/LER-1981-003, Forwards LER 81-003/01T-0 | Forwards LER 81-003/01T-0 | | | 05000302/LER-1981-003-01, /01T-0:on 810129,containment Isolation Valves AHV-1C & AHV-1D Found Inoperable Contrary to Tech Spec 3.6.3.1.Caused by Failure of Valve to Seal at Low Ambient Temp During Purge Conditions | /01T-0:on 810129,containment Isolation Valves AHV-1C & AHV-1D Found Inoperable Contrary to Tech Spec 3.6.3.1.Caused by Failure of Valve to Seal at Low Ambient Temp During Purge Conditions | | | 05000302/LER-1981-004, Forwards LER 81-004/03L-0 | Forwards LER 81-004/03L-0 | | | 05000302/LER-1981-004-03, /03L-0:on 810119,position Indication for Containment Isolation Valves CAV-2 & CAV-126 Found Inoperable,In Violation of Tech Spec 3.6.3.1.Cause of CAV-2 Inoperability Unknown.Cause of CAV-126 Was Bad Breaker | /03L-0:on 810119,position Indication for Containment Isolation Valves CAV-2 & CAV-126 Found Inoperable,In Violation of Tech Spec 3.6.3.1.Cause of CAV-2 Inoperability Unknown.Cause of CAV-126 Was Bad Breaker | | | 05000302/LER-1981-005, Forwards LER 81-005/03L-0 | Forwards LER 81-005/03L-0 | | | 05000302/LER-1981-005-03, /03L-0:on 801215,mechanical Seal for Bldg Spray Pump BSP-1A Found Leaking Greater than 6 Gallons/H,In Violation of Tech Spec 3.6.2.1.Caused by Defective Mechanical Seal.Review of Maint Procedure in Progress | /03L-0:on 801215,mechanical Seal for Bldg Spray Pump BSP-1A Found Leaking Greater than 6 Gallons/H,In Violation of Tech Spec 3.6.2.1.Caused by Defective Mechanical Seal.Review of Maint Procedure in Progress | | | 05000302/LER-1981-006-03, /03L-0:on 810123,breaker for Control Complex Emergency Ventilation Fan AHF-18A Found Open.Caused by Inadvertent Bumping of Breaker.Breaker Shut,Operability Checks Performed & Personnel Advised to Exercise Caution | /03L-0:on 810123,breaker for Control Complex Emergency Ventilation Fan AHF-18A Found Open.Caused by Inadvertent Bumping of Breaker.Breaker Shut,Operability Checks Performed & Personnel Advised to Exercise Caution | | | 05000302/LER-1981-006, Forwards LER 81-006/03L-0 | Forwards LER 81-006/03L-0 | | | 05000302/LER-1981-007, Forwards LER 81-007/03L-0 | Forwards LER 81-007/03L-0 | | | 05000302/LER-1981-007-03, /03L-0:on 810126,radiation Monitor RM-A5 Failed to Restart After Filter Change.Caused by Blown Fuse.Fuse Replaced | /03L-0:on 810126,radiation Monitor RM-A5 Failed to Restart After Filter Change.Caused by Blown Fuse.Fuse Replaced | | | 05000302/LER-1981-008, Forwards LER 81-008/03L-0 | Forwards LER 81-008/03L-0 | | | 05000302/LER-1981-008-03, /03L-0:on 810204,during Charcoal Testing,Filter Sys AHFL-2D Methyl Iodide Removal Efficiency Was 92.14%. Caused by Atmospheric Pollutants & Normal Air Flow.Charcoal Cells Replaced W/New Impregnated Charcoal | /03L-0:on 810204,during Charcoal Testing,Filter Sys AHFL-2D Methyl Iodide Removal Efficiency Was 92.14%. Caused by Atmospheric Pollutants & Normal Air Flow.Charcoal Cells Replaced W/New Impregnated Charcoal | | | 05000302/LER-1981-009, Forwards LER 81-009/03L-0 | Forwards LER 81-009/03L-0 | | | 05000302/LER-1981-009-03, /03L-0:on 810209,RCS Drain Tank Level Indication Was Erratic & Prevented Leak Rate Surveillance.Caused by Vapor Condensation in Instrument Sensing Lines.Lines Blown Down | /03L-0:on 810209,RCS Drain Tank Level Indication Was Erratic & Prevented Leak Rate Surveillance.Caused by Vapor Condensation in Instrument Sensing Lines.Lines Blown Down | | | 05000302/LER-1981-010-03, /03L-0:on 810217,after Routine Shutdown,Rcs Sampling Revealed That Dose Equivalent I-131 Exceeded Tech Specs.Caused by Leaking Fuel & Anticipated Dose Equivalent Iodine Transient.Purification Flow Increased | /03L-0:on 810217,after Routine Shutdown,Rcs Sampling Revealed That Dose Equivalent I-131 Exceeded Tech Specs.Caused by Leaking Fuel & Anticipated Dose Equivalent Iodine Transient.Purification Flow Increased | | | 05000302/LER-1981-010, Forwards LER 81-010/03L-0 | Forwards LER 81-010/03L-0 | | | 05000302/LER-1981-011, Forwards LER 81-011/01T-1 | Forwards LER 81-011/01T-1 | | | 05000302/LER-1981-011-01, /01T-1:on 810306,containment Isolation Valves CAV-1,3,4,5 & 126 Found Incapable of Meeting Environ Qualification During Evaluation of IE Bulletin 79-01B.Caused by Potential Electrical Short Due to Flooding After LOCA | /01T-1:on 810306,containment Isolation Valves CAV-1,3,4,5 & 126 Found Incapable of Meeting Environ Qualification During Evaluation of IE Bulletin 79-01B.Caused by Potential Electrical Short Due to Flooding After LOCA | | | 05000302/LER-1981-012, Forwards LER 81-012/03L-0 | Forwards LER 81-012/03L-0 | | | 05000302/LER-1981-012-03, /03L-0:on 810219,Limitorque-operated Containment Isolation Valves MUV-260 & 261 Failed to Close.Cause Unknown.Torque Switch MUV-261 Replaced & Operability Restored on 810224.Investigation Continuing | /03L-0:on 810219,Limitorque-operated Containment Isolation Valves MUV-260 & 261 Failed to Close.Cause Unknown.Torque Switch MUV-261 Replaced & Operability Restored on 810224.Investigation Continuing | | | 05000302/LER-1981-013, Forwards LER 81-013/03L-0 | Forwards LER 81-013/03L-0 | | | 05000302/LER-1981-013-03, /03L-0:on 810302,during Routine Testing in Mode 5 Operation,Rcs Discovered W/Chloride Concentration of 0.18 Ppm.Caused by Release of Chlorides from Makeup. Procedures Will Be Revised by 810430 | /03L-0:on 810302,during Routine Testing in Mode 5 Operation,Rcs Discovered W/Chloride Concentration of 0.18 Ppm.Caused by Release of Chlorides from Makeup. Procedures Will Be Revised by 810430 | | | 05000302/LER-1981-014-03, /03L-0:on 810301,Clark Relay Model 5UK6-3 in Reactor Bldg Isolation Channel B,Group 2,failed to Actuate When Coil Was de-energized During SP-130.Caused by Burr on Relay Shaft.Relay Replaced | /03L-0:on 810301,Clark Relay Model 5UK6-3 in Reactor Bldg Isolation Channel B,Group 2,failed to Actuate When Coil Was de-energized During SP-130.Caused by Burr on Relay Shaft.Relay Replaced | | | 05000302/LER-1981-014, Forwards LER 81-014/03L-0 | Forwards LER 81-014/03L-0 | | | 05000302/LER-1981-015, Forwards LER 81-015/03L-0 | Forwards LER 81-015/03L-0 | | | 05000302/LER-1981-015-03, /03L-0:on 810301,Agastat Relay Model 3722B12C in Engineered Safeguards High Pressure Injection Actuation Channel B,Group 3 Block 4,failed to Change State After Receiving Signal During SP-130.Caused by Defective Relay | /03L-0:on 810301,Agastat Relay Model 3722B12C in Engineered Safeguards High Pressure Injection Actuation Channel B,Group 3 Block 4,failed to Change State After Receiving Signal During SP-130.Caused by Defective Relay | | | 05000302/LER-1981-016-03, /03L-0:on 810304,breaker for DHV-110,decay Heat Pump a Discharge Throttle Valve Tripped.Cause Unknown. DHV-110 Repetitively Cycled W/No Failures | /03L-0:on 810304,breaker for DHV-110,decay Heat Pump a Discharge Throttle Valve Tripped.Cause Unknown. DHV-110 Repetitively Cycled W/No Failures | | | 05000302/LER-1981-016, Forwards LER 81-016/03L-0 | Forwards LER 81-016/03L-0 | | | 05000302/LER-1981-017, Forwards LER 81-017/03L-0.Detailed Event Analysis Encl | Forwards LER 81-017/03L-0.Detailed Event Analysis Encl | | | 05000302/LER-1981-017-03, /03L-0:on 810304,during Testing,Discovered That Containment Isolation Valve CFV-16 Would Not Move from mid-position.Caused by Valve Binding on Bushing Due to Insufficient Lubrication | /03L-0:on 810304,during Testing,Discovered That Containment Isolation Valve CFV-16 Would Not Move from mid-position.Caused by Valve Binding on Bushing Due to Insufficient Lubrication | | | 05000302/LER-1981-018, Forwards LER 81-018/03L-0 | Forwards LER 81-018/03L-0 | | | 05000302/LER-1981-018-03, /03L-0:on 810313,Gow Mac 20-250 Dihydrogen Analyzer Failed Calibr During Surveillance Program SP-708. Caused by Defective thermo-conductivity Cell.Cell Replaced & Instrument Calibr & Restored on 810316 | /03L-0:on 810313,Gow Mac 20-250 Dihydrogen Analyzer Failed Calibr During Surveillance Program SP-708. Caused by Defective thermo-conductivity Cell.Cell Replaced & Instrument Calibr & Restored on 810316 | | | 05000302/LER-1981-019-03, /03L-0:on 810313,during Normal operation,RC3,RC6 & RB3 Relays Tripped in Emergency Safeguards Actuation Channel B.Cause Attributed to Failed Hamlin Relay.Maint Revealed Addl Faulty Relays.Hamlin Replaced W/Cryden Relays | /03L-0:on 810313,during Normal operation,RC3,RC6 & RB3 Relays Tripped in Emergency Safeguards Actuation Channel B.Cause Attributed to Failed Hamlin Relay.Maint Revealed Addl Faulty Relays.Hamlin Replaced W/Cryden Relays | | | 05000302/LER-1981-019, Forwards LER 81-019/03L-0 | Forwards LER 81-019/03L-0 | | | 05000302/LER-1981-020-03, /03L-0:on 810405,during Performance of Engineered Safeguards Monthly Functional Tests,Discovered That Subsystem a Low Power Injection Channel RC-4 Would Not Reset W/Reset Permissive.Caused by Failed mercury-wetted Relay | /03L-0:on 810405,during Performance of Engineered Safeguards Monthly Functional Tests,Discovered That Subsystem a Low Power Injection Channel RC-4 Would Not Reset W/Reset Permissive.Caused by Failed mercury-wetted Relay | | | 05000302/LER-1981-020, Forwards LER 81-020/03L-0 | Forwards LER 81-020/03L-0 | | | 05000302/LER-1981-021, Forwards LER 81-021/03L-0 | Forwards LER 81-021/03L-0 | | | 05000302/LER-1981-021-03, /03L-0:on 810411,failure of Inverter D Resulted in Loss of Vital Bus VBDP-6.Caused by Shorted Diode & Blown Fuse Which May Have Resulted from Overheating in Inverter Cabinet.Diode & Fuse Replaced & Mod Procedure Revised | /03L-0:on 810411,failure of Inverter D Resulted in Loss of Vital Bus VBDP-6.Caused by Shorted Diode & Blown Fuse Which May Have Resulted from Overheating in Inverter Cabinet.Diode & Fuse Replaced & Mod Procedure Revised | | | 05000302/LER-1981-022-03, /03L-0:on 810412,following Reactor Trip,Main Steam Isolation Valve Msv Found Inoperable.Cause Undetermined.Mods Performed to Improve Valve Operation & Reliability. Functional Test Results Satisfactory.Operability Restored | /03L-0:on 810412,following Reactor Trip,Main Steam Isolation Valve Msv Found Inoperable.Cause Undetermined.Mods Performed to Improve Valve Operation & Reliability. Functional Test Results Satisfactory.Operability Restored | | | 05000302/LER-1981-022, Forwards LER 81-022/03L-0 | Forwards LER 81-022/03L-0 | | | 05000302/LER-1981-023, Forwards LER 81-023/03L-0 | Forwards LER 81-023/03L-0 | | | 05000302/LER-1981-023-03, /03L-0:on 810412,atmospheric Radiation Monitor RM-A5 Failed Due to Seized Sample Vacuum Pump.Caused by Worn Carbon Vanes.Pump Replaced.Engineering Evaluation in Progress.Supplementary Info Sheet Encl | /03L-0:on 810412,atmospheric Radiation Monitor RM-A5 Failed Due to Seized Sample Vacuum Pump.Caused by Worn Carbon Vanes.Pump Replaced.Engineering Evaluation in Progress.Supplementary Info Sheet Encl | | | 05000302/LER-1981-024-03, /03L-0:on 810414,emergency Diesel Generator 1A Found Inoperable During Monthly Test SP-354.Caused by Plugged Oil Separator in Air Ejector Train.Procedure Being Revised to Increase Cleaning & Insp Frequency | /03L-0:on 810414,emergency Diesel Generator 1A Found Inoperable During Monthly Test SP-354.Caused by Plugged Oil Separator in Air Ejector Train.Procedure Being Revised to Increase Cleaning & Insp Frequency | | | 05000302/LER-1981-024, Forwards LER 81-024/03L-0 | Forwards LER 81-024/03L-0 | | | 05000302/LER-1981-025-03, /03L-0:on 810417,EFP-2 Control Switch Discovered in Off Position.Caused by Procedural Deficiencies.Procedures Modified to Require Assurance That EFP-2 Is Selected to Auto | /03L-0:on 810417,EFP-2 Control Switch Discovered in Off Position.Caused by Procedural Deficiencies.Procedures Modified to Require Assurance That EFP-2 Is Selected to Auto | | | 05000302/LER-1981-025, Forwards LER 81-025/03L-0 | Forwards LER 81-025/03L-0 | |
|