ML19347D363

From kanterella
Jump to navigation Jump to search
Forwards LER 81-010/03L-0
Date released: 12/27/2019 Download: ML19347D363


LER 81-010/03L-0:on 810217,after Routine Shutdown,Rcs Sampling Revealed That Dose Equivalent I-131 Exceeded Tech Specs.Caused by Leaking Fuel & Anticipated Dose Equivalent Iodine Transient.Purification Flow Increased
ML19347D365
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/13/1981
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347D365 (14)
Forwards LER 81-010/03L-0
ML19347D362
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/13/1981
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347D362 (1)