LER 88-010-01:on 880921,observed That Test/Operate Switch for Each of Containment Atmosphere Gaseous Radiation Monitors Was in Test Position.Caused by Operator Error. Switch Placed in Operate position.W/891002 Ltr
ML19325C194
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/02/1989
From: Bergin J, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-88-010-01, LER-88-10-1, MP-13569, NUDOCS 8910120156
Download: ML19325C194 (4)


Text

-

o

], sl, g Gener;l Offio:s*Seloon Street. Berian Connecticut wT I.E$sIeNNitIY c 7 P O. box 270 Sf IwEI[$5 s.erbe*cNany H ARTFORD. CONNECTICUT 06414-0270 twineast ta==ar Enroy comny (203)666-6000 y, u

[ Octolser 2, 1989 MP-13569 e

Re: 10CFR50.73(a)(2)(i)(B) h',

e-U.S. Nuclear Regulatory Commission l Document Control Desk Washington, D.C. 20555 n

Facility perating License No. DPR-65

Reference:

Docket o.50-336 Licensee Event Report 88-010-01 Gentlemen:

O" This letter forwards update Licensee Event Report 88-010-01 required to be submitted pursuant to paragraph 50.73(a)(2)(i)(B).

t Very truly yours, j NORTHEAST NUCLEAR ENERGY COMPANY  !

/ut ac w Step e/;E. cace

. Station Superintendent Millstone Nuclear Power Station

' SES/JMB:mo 1

Attachment:

LER 88-010-01 cc: W. T. Russell, Region I Administrator W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2 and 3

-G. S.-Vissing, NRC Project Manager, Millstone Unit No. 2 s

G

, 89101201D6 891002 '~

i

- t

PDR S

..ADOCK 05000336 '

I PDC

q r- i

!-' N8t C f o'm DM U $. NOOSE AR 6<E GUgATORY COMMQQN A%QVf D OMb NO. 31bMID4 (6 40) E AFIRES 4!30'92 j 4 istimated buroen per nsponse to comply with this into mation cometion rea.est: 60 0 hrs. Ftrw3rd 1

. . . LICENSEE EVENT REPORT (LER) IncE E Ta'n"$,7,U m*E N @ t$0[*vY 'I2'ein,

, 84eJsintory Commession. Washington Dc P0666 anc to I tre Fare work Recuttion karp.ect (315C-01 Del. Ott co of Managemem anc Buopet. Washington. DC 2D603 F AcviY 4 Mg o p DOatl NsMMb di M Millstone Nuclear Power Stauon Unit 2 ol $l ol ol ol3 l3 l6 1hFl 0] 3 )

Tactis i Containment Atmosphere Gaseous Radiation Monitor Sulich Alignment e /ENT DATE 16) L FD NuVp[ A #f.1 $1FOORT DATE m OTN[54 F AOILITIF E PJVOLVED f t

  • MQfg 4 DAY YEAR YEAR ==

MONTH DAY YE A4 F AWT Y NAW 6

]

ofsiofof01 1 I

~ ~

o 9]2l1 8 8 s l8 0l1l0 0l 1 1l0 0l 2 8 l9 ol si of of of I I DDERATINa TH!$ Af PORT is BEtN3 $UBMTTED Pus <SUANT TO THE AEOUIAEMENTS OF 10 CFA (: (Chem one o' mo.e of the toteomngM11) 20 dC2(b) 20 802tc) 60 73(a)(2 Hew) 73 71(b)

Pow R -

20 806(4)(110) 60 36tcl(1) 60.73:alititv) 73.7t(ci et 1l0l0 20 40$ia)(is ot) 20 40$(a)(1)(114)

[ 60.36:es c2) _

50. rs. ca> <2nvii) _ gtgA, r st.ei+pe,n ,

T**1. NR o'm 3%A) 1 60.734a)(27 f 0 60.73 t al(2)f vinit A) ]

20 406la)(1)Ov) 60 731a)(2)U0 60 73(a)(2)lv110(B)

PO 406f at tit rivl 60. 73 t a H2l Old 60 73f aH211x) l LICENSEE CONT ACT FOR TH $ LER (121 NAME TELEDHONE NJMBER j AER A CQUI i Joseph M. Bergin. Engineer, Ext. 5352 2 0l3 4l4l7l-l1l7l9l1 ,

, COMDLETE ONE LINE FOR E ACM COMPONENT F AILVAE des 0simED IN THis REPOAT #13: l cAUSE SYSTEM COMDONENT h k* CAVEE SYSTEM COMDONENT "h h*

I II I I i I I II I I I I I II I I I I I i ll I I i, SUDALEMENTAL AEDOAT ExDECTED tial MONTH DAY YEAR s"fe$I E N

"""} ves nt vn. comoiei. ExmEcTED $UBMISSiON DATEl CATE D6)

% NO l l AesTRAc1 n. mit to , x .gace.. . ... awo imalpiy tmeen sing.-sme typomen i ne , Dei On September 21,1965 at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> with the Unit in Mode 1 and at 100'~c power operation, the Instrument and Controls Department, (l&C), was performing routine monthly functional tests on a process radiation monitor. While performing this test the l&C technician observed that the Test / Operate switch for each of the Containment Atmosphere Gaseous Radiation monitors. RM 6123B and RM 8262B, was in the Test position. This switch posioon introduces an artificial 3600 count per minute signal into the radiation monnor making each of the Radiation Monitors inoperable.

The Unit's Technical Specifications require at least one of these radiation monitors for Reactor Coolant System Leak detecuan. These two monnors had been functionally tested on August 23,1965. The switches had been left in the test position at the conclusion of the August funcuonal test. The Unit operated fc 29 days without either of the two gaseous radiauon monitors.

Upon discovery of the switch position the Shift Supervisor was notified and the Test / Operate switches were placed in the Operate position.

I orm 366 L

r gwm ae.A U $ NVed AA RECM,AToRY CoMM:66CN AF%ogQ Q360-W e ]

  • to - .s. o s, t~.
LICENSEE EVENT REPORT (LER) ,.. . n..6f j,";m, ,n-lf *4,, 3

.. m TEXT CONTINUATION 75,**.'g",cy,cl,'f.m;,'.g;*54.n,ch

.no R.oorie uan.p nt Br m-6h U E. N

"* 1 tr.T E M. 6t odSIo/ M u.,..*E N.,, C,, U w. I'o'n E U. oc = =

FACiJrY NAME Oi oocAET NJABER @ L F A NWPFD @ l E ACaf I36 YEAR N j

, Millstone Nuclear Power Station Umt 2 - ~

0l 6l 0l 0l 0l3 l3 l6 $l8 rExT m me.. .o.e. is ,.asn.0, u.. .o>1 ion.1 NRc EWm 366A O 04 0l1l0 0l1 0l 2 OF 0l3

1. Dee6ntion of Frent On September 23,1988, at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> with the plant operating in Mode 1 at 1009 power, it was i

determined that two of the Unit's process radiauon monitors were inoperable. Radiation monitors RM S123B and RM S260B are the Containment Atmosphere Oaseous Radmonitors. Technical i-Specihcotions require that at least one of these monitors be operable for the purposes of Reactor Coolant System Leak Detection. The radiation monitors were inoperable because the Test / Operate switch on each morutor was in the Test position. The Test position introduces an artificial 3600 count per minute signal into the radiauon monitor and does not process the signal coming from the detector.

An Instrument and Controls (l&C) Department Technician performing a functional test on one of the Unit's process radiation monitors, observed that the Test / Operate switch on two adjacent radiation monitors, RM $123B and RM $262B, was in the Test position. The 1&C Technician notified the Shift Supervisor who then instructed the technician to place the switches in Operate position. The radiauon monitors were then determined to be operable.

11. Caine nf Frent A review of the past data on these two Radiauon monitors shows that the Test position had been selected during the functional test of these instruments on August 23, 1966. The Operate position was not selected at the conclusion of the functional test. . This resuhed in the instruments displaymg a constant 3600 counts per minute. The root cause of the event being operator error on the part of the Instrument and Controls technician who periormed the functional test on these monitors on August 23, 1968. The restoration step of the functional test, SP 2404AK, was not performed.

These two radiation monitors are observed during the performance of the Operations Department daily surveillances. The surveillance on this monitor did not pick up this discrepancy due to the 3600 count per minute reading being within the normal range for the instrument.

Ill. An A+ of Event This event is being submitted pursuant to 10CFR50.73(a)(2)(i)(B). Technical Specifications require a minimum of one of these two monitors for the purpose of detecting pressure boundary leakage in the Reactor Coolant System. If and when neither of these two monitors are available, grab samples satisf) the requirements of this Specification. Since these monitors were inoperable and grab samples were not taken, the Unit operated outside the requirements of this Specification for 29 days.

The event has no safety consequences. During the period when these monitors were inoperable the leakage limits on the Reactor Coolant System were not exceeded, as determined by the process computer unidentihed leak rate calculation. The two remaining Contamment Atmospheric paruculate radiation monitors and the Containment Sump level indication require;l by this Specification were operable and showed no abnormal condition.

The two inoperable radiation monitors supply a signal to the Engineered Safeguards Actuation Signal, ESAS Cabmets. This signal is an input to a one out of four logic which causes tre closure of the Containment Purge Isolation valves. Since the Purge valves are required to be closed in Mode 1, the inoperabihty of the monitors, RM 5123B and RM F262B had no impact or, the ESAS.

In the event that the Unit had shutdown and cooled down during this 29 day time frame there would still have been no impact as a result of this switch misposition. Unit procedures require manipulation of the Test / Operate switch in preparation for initiation of Conta nment purge. This manipulation would have found and corrected the switch misposition prior to the requirements for its use in the ESAS actuation logic.

NRO Form 366A (6-69)

M wno torm s66A u.s NscLE*a atoutomy couu:ssioN e sovto oupNo- 3160-0104 (6-39) EXPIR[$: 4/30 /92 Estimatee twroom por rsponse to comply with this l*e LICENSEE EVENT REPORT (LER) pj"g,*a;,*:'d,q'g"j,,6&f,,"',5

, g,,,5",*j',5,,,

TEXT CONTINUATION .ne m.ovt. u n.pe-.nt er nen in-caot u.s Nacio r ,

s Repatory Commission WasNngton DO 20655 anc to tne F' ape work Roswetion Project (3160-0104). Office of Manapement anc bacoet Wasnsnoton DC 20603-F ACR,fTY NAME (t) DOCt4T NUMBER (2) 1 F A NiMPFm gi PAGE (31 YE A84 N [

+ Millstone Nuclear Power Station ~ ~

Unit 2 OF 0l 6l 0l 0l 0l3 l3 l6 $l8 0l 1l0 0l1 0) 3 0l3  ;

Text ne meo . c. is ,oosaee. use moeition i Nec *orm as6a si on i

i IV, Cntrective Action Upon discovery of this condition the Shift Supervisor was notified and he instructed the technician  !

to place the Test / Operate swltches for the two radiation monitors in the Operate position. The

! indications which are provided by these monitors was observed to be normal. i The importance of a thorough performance and completion of all surveillances and functional tests was highlighted at the last Instrument and Controls Department meeting. The procedure for the i radiation monitors' functional testing has been reviewed. The procedure data sheet has been

' revised to include a dual verification for documentauon of proper restoration. As a final action to l l prevent recurrence, the Unit has reviewed a change in the type of switch used for the Test / Operate g switch. A spring return to Operate switch has been installed.

V. Additlnntl Informntion L

There were no failed components as a result of this event.

The radiation Monitors were manufactured and supplied by Nuclear Measurements Corporation.

Model No. CRA-70.

EIIS NO 1L-45-N305 ESAS Cabinets Ells NO: JE-XC-C560 Similar LERs: 62-026 a