Category:NPDES NONCOMPLIANCE NOTIFICATION
MONTHYEARHL-2260, NPDES Noncompliance Notification:On 920529,all 3 Unit 1 Cooling Towers Were Overflowing.Caused by Restriction in Cooling Tower Return Flow.Cooling Tower Screens Cleaned1992-06-11011 June 1992 NPDES Noncompliance Notification:On 920529,all 3 Unit 1 Cooling Towers Were Overflowing.Caused by Restriction in Cooling Tower Return Flow.Cooling Tower Screens Cleaned ML20087A5031992-01-0303 January 1992 NPDES Noncompliance Notification:On 911230 Sample Indicated That Chlorinated Water Was Being Discharged to Altamaha River.Caused by Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Valve Replaced HL-2002, NPDES Noncompliance Notification:On 911230,chlorinated Water Discharged Into Altamaha River Due to Internal Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Failed Valve Replaced1992-01-0303 January 1992 NPDES Noncompliance Notification:On 911230,chlorinated Water Discharged Into Altamaha River Due to Internal Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Failed Valve Replaced HL-1925, NPDES Noncompliance Notification:On 911107,sample from Cooling Tower Basin Recorded Value Greater than 2 Ppm Free Available Chlorine/Total Residual Chlorine.Caused by Malfunction of Valve Torque Switch.Valve Manually Secured1991-11-15015 November 1991 NPDES Noncompliance Notification:On 911107,sample from Cooling Tower Basin Recorded Value Greater than 2 Ppm Free Available Chlorine/Total Residual Chlorine.Caused by Malfunction of Valve Torque Switch.Valve Manually Secured ML20133F2401985-07-30030 July 1985 NPDES Noncompliance Notification:On 850620,6,000 Gallons of Glycol Solution Discharged Into Altamaha River.State of Ga,Environ Protection Div Granted Util Permission for Disposal on 850619 ML19320A7011980-06-27027 June 1980 NPDES Noncompliance Notification:On 800619,at Full Power Operation,Circulating Water Chlorination Sequence Was Automatically Activated,Resulting in Release of Free Available Chlorine in Cooling Water Blowdown ML19323E4181980-05-16016 May 1980 NPDES Noncompliance Notification:On 800512,facility Circulating Overflow Exceeded NPDES Limit of 0.2 Ppm Average Residual Chlorine & 0.5 Ppm Max Residual Chlorine. Chlorine Analyzer Repaired & Returned to Svc 1992-06-11
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARHL-5780, Ei Hatch Unit 1 & 2 Annual Rept of Plant Radioactive Effluent Releases for 1998. with1998-12-31031 December 1998 Ei Hatch Unit 1 & 2 Annual Rept of Plant Radioactive Effluent Releases for 1998. with HL-5773, 1998 Annual Environ Operating Rept (Nonradiological), for Ei Hatch Plant,Units 1 & 2.With1998-12-31031 December 1998 1998 Annual Environ Operating Rept (Nonradiological), for Ei Hatch Plant,Units 1 & 2.With HL-5778, Ei Hatch Nuclear Plant Radiological Environ Operating Rept for 1998. with1998-12-31031 December 1998 Ei Hatch Nuclear Plant Radiological Environ Operating Rept for 1998. with ML20154B8941998-09-28028 September 1998 Environ Assessment & Finding of No Significant Impact Re Licensee Dose Assessment for Plant.Commission Has Determined Not to Prepare Environ Impact Statement for Proposed Action ML20237D5611998-08-21021 August 1998 Draft EA & Finding of No Significant Impact Re Proposed License Amends to Increase Max Rated Thermal Power Level HL-5621, Annual Radioactive Effluent Release Rept for Ei Hatch Nuclear Plant Covering Jan-Dec 19971997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for Ei Hatch Nuclear Plant Covering Jan-Dec 1997 HL-5618, 1997 Annual Environ Operationg Rept, for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 1997 Annual Environ Operationg Rept, for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5630, Ei Hatch Nuclear Plant Radiological Environ Operating Rept for 19971997-12-31031 December 1997 Ei Hatch Nuclear Plant Radiological Environ Operating Rept for 1997 ML20211A8291997-09-15015 September 1997 Environ Assessment & Finding of No Significant Impact Re 970702 Request for Exemption from Certain Requirements of 10CFR73.55(d)(5), Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors.. A000412, Amend to NPDES Permit GA0004120 Issued to Southern Nuclear Operating Co1997-04-15015 April 1997 Amend to NPDES Permit GA0004120 Issued to Southern Nuclear Operating Co ML20138G5511996-12-31031 December 1996 Ei Hatch Nuclear Plant Annual Radioactive Effluent Release Rept for Jan-Dec 1996 HL-5344, Annual Environ Operating Rept for 19961996-12-31031 December 1996 Annual Environ Operating Rept for 1996 HL-5127, Ei Hatch Nuclear Plant Annual Environ Surveillance Rept for 19951995-12-31031 December 1995 Ei Hatch Nuclear Plant Annual Environ Surveillance Rept for 1995 HL-5147, Ei Hatch Nuclear Plant Radiological Environ Operating Rept for 19951995-12-31031 December 1995 Ei Hatch Nuclear Plant Radiological Environ Operating Rept for 1995 HL-5149, Ei Hatch Nuclear Plant Annual Radioactive Effluent Release Rept for Jan-Dec 19951995-12-31031 December 1995 Ei Hatch Nuclear Plant Annual Radioactive Effluent Release Rept for Jan-Dec 1995 ML20086R5341995-07-21021 July 1995 Environ Assessment & Finding of No Significant Impact Re Increase of Licensed Core Thermal Power for Hatch,Units 1 & 2 HL-4831, Ei Hatch Nuclear Plant Units 1 & 2 Annual Rept Plant Radioactive Effluent Releases Jan-Dec 19941994-12-31031 December 1994 Ei Hatch Nuclear Plant Units 1 & 2 Annual Rept Plant Radioactive Effluent Releases Jan-Dec 1994 HL-4813, Annual Environ Surveillance Rept1994-12-31031 December 1994 Annual Environ Surveillance Rept HL-4785, Fitness for Duty Performance Data for six-month Reporting period,Jul-Dec 19941994-12-31031 December 1994 Fitness for Duty Performance Data for six-month Reporting period,Jul-Dec 1994 ML20092K2521994-12-31031 December 1994 Revised Pages to Plant Hatch Annual Radioactive Effluent Release Rept 1994 HL-4515, Semiannual Radioactive Effluent Release Rept for Jul-Dec 19931993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1993 HL-4537, Annual Environ Surveillance Rept for 19931993-12-31031 December 1993 Annual Environ Surveillance Rept for 1993 HL-4553, Ei Hatch Nuclear Plant Annual Radiological Environ Surveillance Rept for 19931993-12-31031 December 1993 Ei Hatch Nuclear Plant Annual Radiological Environ Surveillance Rept for 1993 HL-3428, Plant Ei Hatch,Units 1 & 2 Semiannual Radioactive Effluent Release Rept,Jan-June 19931993-06-30030 June 1993 Plant Ei Hatch,Units 1 & 2 Semiannual Radioactive Effluent Release Rept,Jan-June 1993 HL-3158, Plant Ei Hatch Semiannual Radioactive Effluent Release Rept,Jul-Dec 19921992-12-31031 December 1992 Plant Ei Hatch Semiannual Radioactive Effluent Release Rept,Jul-Dec 1992 HL-3255, 1992 Annual Radiological Environ Surveillance Rept. W/1992-12-31031 December 1992 1992 Annual Radiological Environ Surveillance Rept. W/ HL-3218, Ei Hatch Nuclear Plant Annual Environ Surveillance Rept1992-12-31031 December 1992 Ei Hatch Nuclear Plant Annual Environ Surveillance Rept ML20036A4711992-12-31031 December 1992 Monitoring Marine Environ of Long Island Sound at Millstone Nuclear Power Station,Waterford,Ct Annual Rept 1992 HL-2371, Plant Ei Hatch Units 1 & 2 Semiannual Radioactive Effluent Release Rept,Jan-June 19921992-06-30030 June 1992 Plant Ei Hatch Units 1 & 2 Semiannual Radioactive Effluent Release Rept,Jan-June 1992 HL-2260, NPDES Noncompliance Notification:On 920529,all 3 Unit 1 Cooling Towers Were Overflowing.Caused by Restriction in Cooling Tower Return Flow.Cooling Tower Screens Cleaned1992-06-11011 June 1992 NPDES Noncompliance Notification:On 920529,all 3 Unit 1 Cooling Towers Were Overflowing.Caused by Restriction in Cooling Tower Return Flow.Cooling Tower Screens Cleaned HL-2002, NPDES Noncompliance Notification:On 911230,chlorinated Water Discharged Into Altamaha River Due to Internal Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Failed Valve Replaced1992-01-0303 January 1992 NPDES Noncompliance Notification:On 911230,chlorinated Water Discharged Into Altamaha River Due to Internal Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Failed Valve Replaced ML20087A5031992-01-0303 January 1992 NPDES Noncompliance Notification:On 911230 Sample Indicated That Chlorinated Water Was Being Discharged to Altamaha River.Caused by Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Valve Replaced HL-2121, Annual Environmental Surveillance Rept - 19911991-12-31031 December 1991 Annual Environmental Surveillance Rept - 1991 ML20094G7361991-12-31031 December 1991 Joint Frequency Tables of Wind Speed & Wind Direction 60m Vs Delta Temp 60-10m for Jan-Dec 1991 ML20094G7251991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991 HL-2173, Annual Radiological Environ Surveillance Rept,CY91. W/1991-12-31031 December 1991 Annual Radiological Environ Surveillance Rept,CY91. W/ HL-1925, NPDES Noncompliance Notification:On 911107,sample from Cooling Tower Basin Recorded Value Greater than 2 Ppm Free Available Chlorine/Total Residual Chlorine.Caused by Malfunction of Valve Torque Switch.Valve Manually Secured1991-11-15015 November 1991 NPDES Noncompliance Notification:On 911107,sample from Cooling Tower Basin Recorded Value Greater than 2 Ppm Free Available Chlorine/Total Residual Chlorine.Caused by Malfunction of Valve Torque Switch.Valve Manually Secured HL-1785, Georgia Power Co Plant,Ei Hatch Units 1 & 2 Semiannual Radioactive Effulent Release Rept,Jan-June 19911991-06-30030 June 1991 Georgia Power Co Plant,Ei Hatch Units 1 & 2 Semiannual Radioactive Effulent Release Rept,Jan-June 1991 HL-1541, Annual Environ Surveillance Rept for 19901990-12-31031 December 1990 Annual Environ Surveillance Rept for 1990 HL-1477, Plant Ei Hatch Semiannual Radioactive Effluent Release Rept Jul-Dec 19901990-12-31031 December 1990 Plant Ei Hatch Semiannual Radioactive Effluent Release Rept Jul-Dec 1990 ML20073D5761990-12-31031 December 1990 1990 Annual Radiological Environ Surveillance Rept HL-1251, Semiannual Radioactive Effluent Release Rept for Jan-June 19901990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept for Jan-June 1990 ML20042E8711989-12-31031 December 1989 Annual Radiological Environ Surveillance Rept CY89. W/ 900426 Ltr ML20012B8401989-12-31031 December 1989 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989. W/900301 Ltr HL-1050, Annual Radiological Environ Surveillance Rept CY89. W/1989-12-31031 December 1989 Annual Radiological Environ Surveillance Rept CY89. W/ ML20246F5041989-06-30030 June 1989 Semiannual Radioactive Effluent Release Rept for Jan-June 1989 ML20236A4581989-03-0909 March 1989 Environ Assessment & Finding of No Significant Impact Re Util 881025 Request for Exemption from Footnote d-2(c) of App a to 10CFR20 to Allow Use of MSA GMR-I Canisters in Lieu of supplied-air or self-contained Breathing Apparatus ML20235V5381988-12-31031 December 1988 Semiannual Rept Plant Radioactive Effluent Releases, Jul-Dec 1988 ML20245C2381988-12-31031 December 1988 Annual Radiological Environ Surveillance Rept CY88. W/ ML20153C6401988-06-30030 June 1988 Semiannual Rept Plant Radioactive Effluent Releases Jan-June 1988 1998-09-28
[Table view] |
Text
'-, .
- ,- ~ .
- . r~.~,~
4.r.~h. Cosn\s .*Ma f.
g,. , hhh:rw 4'M LT-W#2 J
1
~
ww www. GeorghiPower e uu ,m.=...r tw i :, .
,n . .
- P' . . .
I-t .I.. '
Esy 16, 1980
- .V- r'- : . . . . . . - . . .
1....
s 9'
C,
- 6. .- .
h . T1.TCI WJCf.D.R FIJEr il l - X11CS Pernit ro, GA. 034120 w- -
{~ _
)v,. .-
u-.; . - .
h,'. 2 . Lr J.12.ca.ut Icdutter, Mrector j2 - .
' - %wim:nent:1 'rrotection Division
2?R 15chinc.tco .,Gtreet. 5. V. I
- d. f.Mmtc, G:orgin 30334 ,
j h.. . . . . - . .
1 k ,' reer sin p.
I ~' ~. As required by the tema of c.cbject pernit, I ci fo.-vardins the i.,. . ct*c :dfr:d Icteer notification b7 Mr. Mn : Es.nry, Pitot Mm;cr. of a W:).. .
rJer.w. plying dicebar?A of frer, avaliabic chlorine in the cooling tv.mr
@dc ,.
. . .Movdwn.
- s ..... '-
.L.
/K]ph, T.E. priey E r- - -
1haoner of 'cM1Tonoe.ntal Affairs
?*
723fe. -
E: sm Mr. J. H. Boytin
!,; - ifr. V, A. Widact
.? , . . l'r, R. H. Achtcr l* * . n:. D. O. Yoecer l' . .' Mr. J. R. Jordan -
Mr. nu: nm.cy ;
- r. --
ql .
. '. 80052SG G -
. .+ .
). -,
L a* . a
, . 3 nonn-socu-st tr-s * .
e INTERO'FFICE COMMUNICATION e May 16, 1980 EM-80-538
. ~
pt A?iT E. I . dl A T C51 Report of' NPDES Chlorine Limit Violation i
Mr. R. 11 . Bohler
On ita y 12, 1980, IInit T. I circ. water o ve r fl ow exceeded the Np0ES limit of 0.2 ppm average residual c hl o r i ne and 0.5 ppm maximum residual ch l o r ian e .
The cire. water chlorination was a u t om a t ica11. y started at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />. At 12 5 0 ' hou r s , the technician d i s'c o vere d the tower overflow free chlorine r'esidual to be 0.85 ppm. The l e v e l. of chlorine continued to rise reaching a maximum value of5.0 ppm at 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.
The chlorine concentration remained at a p p reti m a t e l y 5.0 ppm unti.1 the overflow was terminated at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br />. We estimate the total time the li ni ts were exceeded to he one hour and fifty-five minutes.
T h,e estimated discharge rate was 5000 gpm.
The chlorine limit was exceeded because of the following conditions:
- 1. The chloriue demand.of the circ. wa ter system uns determined while lin i t II was near f u l l. power operation for several days. The violation occurred when the unit h a d. been shut dowr. for 3 days with, no a p p r e c iibl e heat load on the system. Consequently, chlorine at ~
a high feedrats (predicted when the system had a bish chlorine demand) was injected into the relatively low d emrad system producing the
' high chlorine residuals.
.2 . The free chlorine analyzer u s ed to terninnte the chlorination . cycle if chlorine residuals exceed a predet' ermined set point was out of serv i c e due to a clogged line that feeds the analyzer cell.
To prevent a recurrence, the rollowing actionswill be taken:
- 1. The chlorine analyzer will be repired and returned to service.
- 2. Caution notices will be placed in the app ropri a t e procedures to warn the operator / technician as to the possibilities of chlor *ne demand- changing with pwer- changes and the i consequences- of high chlorine f eedr a t e s on lou demand
. systems. .
o
~
,- sA No further period of non-compliance i s expected as a result of this violation. If. addition'ai information i s r e q,u i r e d , please conta c t- Mr.
W. 11 . Rogers at extension 120. .
-.M. Manry Plant Manager J D B': t a b w
Xc: R. J. Kelly '
W. A. Widner T. V. Greene
W. H. Rogers C. L. Coggin D. Smith File i.