HL-4537, Annual Environ Surveillance Rept for 1993

From kanterella
Jump to navigation Jump to search
Annual Environ Surveillance Rept for 1993
ML20064N966
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/31/1993
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-4537, NUDOCS 9403300193
Download: ML20064N966 (83)


Text

Georgia Power Compey 40 invemess Center Parkway Post Ofree Box 1295 Birmingham, Alabama 35201 Telophone 2e5 877-7279 J. T. Beckham, Jr. Georgia Power Vice President Nuclear Hatch Projm:t  !!>e aumern ciectrc m um Docket Nos. 50-321 HL-4537 50-366 March 23, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 1

I Edwin I. Hatch Nuclear Plant Annual Environmental Surveillance Report i

Gentlemen: 1 In accordance with the Plant Hatch Units 1 and ? Emironmental Technical SpecificWons, j (Appendix B to the Operating Licenses) Section 5.6.1, Georgia Power Company is submitting the I enclosed Environmental Surveillance Report for 1993.

l If you have any questions in this regard, please contact this office at any time.

Sincerely, h

J. T. Beckham, Jr.

LPD. sis ENV 94-067

Enclosure:

Annual Emironmental Surveillance Report cc: Gro_rgia_Eower Company Mr. H. L. Sunmer, General Manager - Nuclear Plant Mr. C. M. Hobson, Manager - Environmental Affairs NORMS U. S. Nuclear Regulatory Commission. Washincton. D. Cm Mr. K. N. Jabbour, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Recion 11 Mr. S. D. Ebacter, Regional Administrator Mr. L. D. Wert, Senior Resident Inspector - Hatch 3000C_

9403300193 931231 PDR ADOCK 05000321

/

d 95 j #

R PDR ( l a

ENCLOSURE EDWIN I IIATCll NUCLEAR PLANT- UNITS 1 AND 2 NRC DOCKETS 50-321,50-366 OPERATING LICENSES DPR-57, NPF-5 ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT 1993 Specification In accordance with the Edwin I. Hatch Nuclear Pir.nt (Plant Hatch) Technical Specifications, Appendix B, Section 5.6.1, this report is submitted summarizing the environmental activities for Units I and 2 of the Edwin I. Hatch Nuclear Plant for the period January 1,1993 through December 31,1993.

Reportina Requirg_ments A. Summaries, Analyses, and Interpretations of the Environmental Monitoring Activities Results for the Report Period No nonradiological environmental monitoring activities were perfonned at Plant Hatch during the reporting period beyond those performed in accordance with NPDES Permit No. GA 0004120 Monitoring activities performed in accordance with NPDES Permit No. GA 0004120 are referenced in Section H.

B. Comparison With Preoperational Studies, With Operational Controls, and With Previous Monitoring Reports Comparisons with preoperational studics, operational controls, and previous monitoring reports were not necessary because no nonradiological monitoring programs were conducted during the monitoring period beyond those perfonned in accordance with NPDES Pennit No. GA 0004120.

C. An Assessment of Observed Impacts of Plant Operation on the Environment No significant environmental impacts were associated with plant operation during the reporting period.

IIL-4537 ENV-94-067 i

F EDWIN 1. IIATCII NUCLEAR PLANT- UNITS 1 AND 2 ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT 1993 D. Environmental Technical Specifications (ETS) Noncompliances and Corrective Actions Taken No instances ofIsrS noncompliance occurred during the reporting period.

E. Changes to Federal and State Permits or Certificates U. S. Anny Corps of Engineers Permit No. 199101536 was reissued in 1993.

This permit authorizes the construction of a temporary weir in the Altamaha River to assure adequate cooling water during severe drought periods.

Attachment 1 provides an informational copy of the permit.

F. Changes in Station Design or Operation that Could Involve an Environmental Impact or Change in the Findings of the Final Environmental Statement In 1993, no changes were made in station design or operation which presented significant environmental impact or resulted in a change in the findings of the Final Environmental Statement.

G. Changes in the ETS No amendments to the ETS were issued during the reporting period.

II. Copies of All Reports Regarding Station Discharges Made in Accordance With NPDES Permit No. GA 0004120 Copies of the Plant liatch 1993 quarterly NPDES Operations Monitoring Reports and the 1993 Flow Monitoring and Characterization Study are included as Attachments 2 and 3 respectively.

Ill-4547 ENV-94-067 2

~-

ATTACIIMENT 1 EDWIN 1. IIATCll NUCLEAR PLANT - UNITS 1 AND 2 CORPS OF ENGINEERS PERMIT NO.199101536 T

IIL-4537 ENV-94-067 Edwin 1. llatch Nuclear Plants - Units 1 and 2 NRC DocLets 50421,50-3M Operating Ucenses DPR-57, NPF-5 Annual Environmental Surveillance Report

l t.

DEPARTMENT OF THE ARMY PERMIT Permittee: Georgia Power Company Permit Number: 199101536 ISSUING OFFICE: ,

Savannah District Corps of Engineers Post office Box 889 Savannah, GA 31402-0889 NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer.

You are authorized to perform work in accordance with the terms and conditions specified below.

PROJECT DESCRIPTION: The permitted activity is the construction of a temporary water retaining structure (weir) containing approximately 475 cubic yards of bagged river sand. The temporary structure will.be 550' long, 3' wide at the top, and 8' to 23 ' wide at the base. The height of the structure will vary from l' to 4 ' depending on river bottom contours. The crest elevation will be 62.3' above mean sea level, adequate to provide intake water to Plant Hatch. The temporary structure will have 2 fish ladders each 30' wide with the crest at 62.0' mean sea level. There will be a boat pass near the center of the structure 15' wide and approximately 4' deep. The temporary structure will be marked upstream with 6 lighted buoys at 100' center to center spacing 1,000' upstream and 3 lighted buoys at 200' center to center spacing 500' upstream. Six lighted buoys at 100' center to center spacing will also be placed 500'  :

downstream of the structure. The weir would be placed only in the event of an extreme low flow situation in the Altamaha River, after supplemental flows from upstream reservoirs were near exhaustion.

PROJECT LOCATION: The site is located in the Altamaha River, approximate River Mile 116.3, near the E. I. Hatch Steam Electric Generating Station, Plant Hatch, approximately 4,200 feet downstream of U. S. Highway 1, in Appling and Toombs, Counties Georgia.

]

ll l

,, : ..' l PERMIT CONDITIONS:

General Conditions:

1. The time limit for completing the work authorized ends on February 1, 1998. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached.

j

2. You must maintain the activity authorized by this permit in  !

good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions.
6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

Special Conditions:

1. The weir will only be constructed in the event of an extreme low flow situation after supplemental flow from upstream reservoirs are near exhaustion.
2. That the permittee will notify this office as early in advance of construction as possible, at least 10 days in advance.

Once the notification is received, the District Engineer will

c notify the appropriate Federal and State agencies, and issue the necessary Notice to Mariners.

3. That the permittee will place all lights and signals to mark the weir as may be prescribed by the U. S. Coast Guard. These lights and signals shall be installed and maintained by and at the expense of the permittee.
4. That all materials used in construction of the weir vill be removed to a high ground site.
5. That any change to the river due to construction equipment be restored after construction.
6. That someone with a background in riparian and riverine habitat studies be present during construction of the weir to insure that impacts to riparian and riverine habitats are minimized. That the weir be under surveillance and daily reports on weir conditions be made by the permittee.
7. That the permittee shall begin removal of the weir on or before 1 January and complete removal of the weir by 1 February.

If deviation from this schedule is anticipated by the permitte due to extreme low or high water elevations,.the permittee shall notify the District Engineer of the situation at the earliest possible date and request approval of a new schedule of removal.

B. That sounding or bottom probing be conducted to ensure that That results of all sounding all materials have been removed.

and/or probing shall be reported.

9. That the permittee shall notify this office once removal of the weir is completed.

FURTHER INFORMATION:

1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:

(x) Section 10 of the River and Harbor Act of 1899 (33 U.S.C.

403).

(x) Section 404 of the Clean Water Act (33 U.S.C. 1344).

( ) Section 103 of the Marine Protectio'n, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413). 7

2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law.

l l

l

  • .o -

i

b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorite any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal projects.
3. Limits of Federal Liability. In issuing this permit, the 7ederal Government does not assume any liability for the  !

following:

a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes,
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
4. Reliance on Applicant's Data. The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.
5. Re-evaluation of Permit Decision. This office may re-evaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require re-evaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above).
c. Significant new information surfaces which this office did not consider in reaching the original public in.terest decision.

Such a re-evaluation may result in a determination that it is I appropriate to use the suspension, modification, and revocation procedures contained.in 33 CFR 325.7 or enforcement procedures 1

4

'Ehe such as those contained in 33 CFR 326.4 and 326.5.

referenced enforcement procedures provide'for the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will.be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209 170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

6. Extensions. General Condition 1 establishes a time. limit for the completion of the activity authorized by.this permit. Unless there are circumstances requiring either a prompt completion of.

the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to.

a request for an extension of this time limit.

,v. , - - ,- - y , -,

_ _ . _ .. _ _ _ _ _ . _ _ . ~ _ _ . _ . _ _ _. _ _

. . , .t ...-

Your signature below, as permittee, indicates that you. accept and agree to comply with the terms and conditions of this permit.

S~ .5/~ f3 '

hsY(PERMITTEE) (DATE)

This permit becomes effective when the Federal, official',

designated to act for the Secretary of the Army, has signed below.

~ T *

  1. (DATE)

/ /

Issued for and in behalf of:

Donald R. Holzwarth Colonel, U. S. Army District Engineer When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner (s) of the property. To validate the transfer of this permit and the associated liabilities with compliance with its terms and-conditions, have the transferee sign and date below.

(DATE)

(TRANSFEREE) i I

l

.l l

l h

- . . , , . - , , , . . , . . - y -

y .

7 , p-

l l

1 l

iibis hotice of.huthorization must.be ~ / (... .% . I conspicuously: displayed at the site 1of mork.',A - ,

United States Army Corps of Engineers 19 93-1 l

A permit to construet a tervorary weir in the Altamha niver i at Plant flatch in Applina and Toonos Counties has been issued to c~m4a s-v cyny on ar rei t 10 m Address of Permittee _ccoran Per en,nanv t

Permit Number 4 l 199101536 For str/Cf Comp 0nder r Donald R. Holzwarth Colonel. U.S. Army District Engineer ENG FORM 4336, Jul 81 f u CPn monos soita or sut to uay og usto teret: cecw.o) i 1

I

i

, ATTACilMENT 2 EDWIN 1. HATCil NUCLEAR PLANT - UNITS l' AND 2 1993 NPDES OPERATION MONITORING REPORTS p

HL-4537 ENV-94-067

. Edwin L Hatch Nuclear Plants - Units I and 2 NRC Dockets 50-321,50-366 Operating Licenws DPR-57, NPF-5 Annual Environmental Surveillance Report -

'l i

Paga 1 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: O1G - Low Volume Waste (Neutralization Tank)

Type of Sample: Grab Frequency of Analysis: 2/Mo 4

Code: (530) (550)

Parameter: Suspended Solids Oil & Grease mg/l 29/1 Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 Date:

01-08-93 0.5 0.0 01-18-93 14.7 0.0 02-01-93 6.0 0.1 02-16-93 11.9 1.0 03-11-93 24.2 0.0 03-16-93 8.0 0.0 Number of Samples: 6 6 Average Value: 10.9 0.2 Maximum Value: 24.2 1.0 Minimum Value: 0.5 0.1 Limits Exceeded: 0 0

Paga 2 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: O1H - Lov Volume Waste (Pressure Filters Backwash)

Type of Sample: Grab Frequency of Analysis: 1/Qtr Code.4 (530) (550)

Parameter: Suspended Solids Oil & Grease mg/l mg/l Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 Date:

03-23-93 (A) 3 <5 03-23-93 (B) 4 <5 03-23 (C) 3 <5 03-23-93 (D) 5 <5 Number of Samples: 4 4 Average Value: 4 <5 Maximum Value: 5 <5 Minimum Value: 3 <5 Limits Exceeded: 0 0 1

I

.Paga 3 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company ,

From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01A - Cooling Tower Blowdown Unit One Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mitpl Grab Mltpl Crab Mitpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium 4 of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

01-06-93 0 0 0 0 -- --

01-08-93 - - - -

.06 0 01-13-93 0 0 0 0 -- --

01-20-93 0 0 0 0 -- --

01-27-93 0 0 0 0 -- --

02-03-93 0 0 0 0 -- --

02-10-93 0 0 0 0 -- --

02-18-93 0 0 0 0 -- --

02-24-93 0 0 0 0 -- --

03-03-93 0 0 0 0 -- --

03-10-93 0 0 0 0 -- --

  • 03-17-93 - - - - -- --
  • 03-24-93 - - - - -- --

J Humber of Samples: 10 10 10 10 1 1 Avg Value: 0 0 0 0 .06 0 Max Value: 0 0 0 0 .06 0 Min Value: 0 0 0 0 .06 0 Limits Exceeded: 0 0 0 0 0 0

  • Note: Unit 1 in outage. Unable to obtain sample.

Pag 3 4 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02A - Cooling Tower Blowdown Unit Two Location: Blowdown Blowdown Blowdown ' Tower Basin Tower Basin Type: Mltpl Grab Mltpl Grab Mltpl Grab Grab Grab Frequency:1/Wk/ Unit 1/WX/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter:

Fac Fac max. Total Time Zinc Chromium of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min)(mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

01-05-93 0 0 0 0 -- --

01-08-93 - -

0 0 .87 0.0 01-13-93 0 0 0 0 -- .--

01-20-93 0 0 0 0 -- --

01-27-93 0 0 0 0 -- --

02-03-93 0 0 0 0 -- --

02-10-93 0 0 0 ,0 -- --

02-18-93 0 0 0 0 -- --

02-24-93 0 0 0 0 -- --

03-03-93 0 0 0 0 -- --

  • 03-10-93 -- -- -- -- -- --
  • 03-17-93 -- -- -- -- -- --
  • 03-24-93 -- -- -- -- -- --

Number of Samples: 9 9 9 9 1 1 Avg Value: 0 0 0 0 0 0 Max Value: 0 0 0 0 0 0 Min Value: 0 0 0 0 0 0 Limits Exceeded: 0 0 0 0 0 0

  • Unit Two in outage. Unable to obtain sample.

1

p Paga 5 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01B - Unit One Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mltpl Grab Mltpl Grab Mltpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zine Chromium a of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min)(mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

03-19-93 -- -- -- --

<.1 <.1

-l l

I Number of i Samples: 0 0 0 0 1 1 l Avg Value: - - - -

<.1 <.1 l Max Value: - - - -

<.1 <.1  !

Min Value: - -- - -

<.1 <.1 o Limits Exceeded: 0 0 0 0 0 0 l l

1 1

i l

l 1

3 Pcg3 6 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch Tot 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120

    • Discharge Location: 01I - Unit One Cooling, Tower Basin Drains Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mitp1 Grab Mltpl Grab Mltpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

03-23-93 - - - -

.5 0 Discharge occured during period of no chlorination.

Number of Samples: 0 0 0 0 1 1 Avg Value: 0 0 0 0 .5 0 Max Value: 0 0 0 0 .5 0 Min Value: 0 0 0 0 .5 0 Limits

. Exceeded: 0 0 0 0 0 0 i j

l i

i

Pega 7 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01J - Unit One Cooling Tower Basin Overflows to Storm Drains Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch..

Type: Mltpl Grab Mltpl Grab Mitpl Grab Grab Grab Frequency:1/WK/ Unit 1/WX/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium of TRC rel max. max.

4

& TRC avg.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

03-23-93 - - - -

.1 0 Discharge occured during period of no chlorination.

1 Number of Samples: 0 0 0 0 1 1 Avg Value: 0 0 0 0 .1 0 Max Value: 0 0 0 0 .1 0 Min Value: 0 0 0 0 .1 0 Limits Exceeded: 0 0 0 0 . 0 0 l

I

Pcga 8 of 14 1

NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 l l

P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02B - Unit Two Cooling Water Overflow To Storm Drains Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mltpl Grab Mitpl Grab Mitpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr - 1/Qtr Para 6eter: Fac Fac max. Total Time Zinc Chromium of TRC rel max. max.

& TRC avg.

(mg/1) (mg/l) (min) (mg/1) (ag/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

01-16-93 -- -- -- -- 0.6 0

  • 03-31-93 <.1 <.1 0 <.1 0.2 0
  • Temperature reading = 68 0 F ( 20 0 C), Flow rate of 400 gpm
  • Bypass Authorization due to Unit One Dual Division Plant Service Water Outage.

Discharges occured during periods of no chlorination.

Number of Samples: 1 1 1 1 2 2 Avg Value: <.1 <.1 0 <.1 0.4 0 Max Value: <.1 <1 0 <.1 0.6 0 Min Value: <.1 . <.1 0 <.1 0.2 0 Limits Exceeded: 0 0 0 0 0 0

l PGg3 9 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From:01-01-93 Plant E.I. Match - To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02C - Unit Two Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mltpl Grab Mltpl Grab Mitpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium 4 of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min)(mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

01-16-93 -- -- -- --

0.6 0 Discharge occured during a period of no chlorination.

Number of Samples: 0 0 0 0 1 1 Avg Value: 0 0 0 0 0.6 0 Max Value: 0 0 0 0 0.6 0 Min Value: 0 0 0 0 0.6 0 Limits Exceeded: 0 0 0 0 0 0 l

l i

l l

l 1

Paga 10 of 14 i

NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01E - Low Volume Waste (Liquid Radwaste System Unit One)

Type of Sample: Grab Frequency of Analysis: 2/Mo Code: (530) (550)

Parameter: TSS O&G Nitrite (Chill Water) Releases mg/l mg/l to discharge point OSN 01 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb)

Date:

01-04 7 0.5 -- -- -- --

01-18-93 14 0.0 -- -- -- --

02-01-93 .1 0.3 -- -- -- --

02-15-93 1 0.0 -- -- -- --

03-01-93 2 2.9 -- -- -- --

03-15-93 4 2.4 -- -- -- --

03-30-93 - -

300 6792 14000 141 Number of Samples  : 6 6 1 1 1 1 Average Value: 5 1.0 300 6792 14000 141 Maximum Value: 14 2.9 300 . 6792 14000 141 Minimum Value: .1 0.0 300 6792 14000 141 Limits Exceeded: 0 0 NA NA NA NA

Pcg3 13 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02E - Low Volume Waste (Liquid Radwaste System Unit Two)

Type of Sample: Grab Frequency of Analysis: 2/Mo Cod e'i (530) (550)

Parameter: TSS O&G Nitrite (Chill Water) Releases mg/l mg/l to discharge point OSN 02 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb)

Date:

01-04-93 2 1.3 --

01-18-93 1 0.3 --

02-01-93 3 1.3 --

02-15-93 1 1.9 -- --

03-01-93 2 2.4 --

03-15-93 .7 0.9 --

Number of Samples  : 6 6 0 0 0 0 Average Value: 1.6 1,4 0 0 0 0 Maximum Value: 3 2.4 0 0 0 0 Minimum'Value: .7 0.3 0 0 0 0 Limits Exceeded: 0 0 NA NA NA NA 1

i

Pcg3 12 of 14 l NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 - Permit Number: GA0004120 Discharge Location: 01 - Combined Plant Waste Streams Unit One Frequency of Analysis: 1/Wk Type of samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH LimiEs: Deg. F N/A N/A Min. 6.0 Max. 9.0 Code: (11) (50060) (50064) (400)

Date:

01-04-93 62 <.1 <.1 6.8 01-11-93 68 <.1 <.1 6.6 01-18-93 73 , <.1 <.1 7.3 01-25-93 71 <.1 <.1 7.4 02-01-93 77 <.1 <.1 7.4 02-08-93 71 <.1 <.1 7.7 02-15-93 64 <.1 <.1 7.0 02-22-93 60 <1 <.1 7.1 03-01-93 59 <.1 <.1 7.1 03-08-93 75 <.1 <.1 7.5 03-15-93 60 <.1 <.1 7.2 03-22-93 59 <.1 <.1 7.3 03-29-93 66 <.1 <.1 6.9 Number of Samples: 13 13 13 13 Average Value: 67 <.1 <.1 7.2 Maximum Value: 77 <.1 <.1 7.7 Minimum Value: 59 0 0 6.6 Limits Exceeded: 0 0 0 0

t P293 13 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02 - Combined Plant Waste Streams Unit Two Frequency of Analysis: 1/Wk Type of Samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Deg. F N/A N/A Min. 6.0 Max. 9.0 code: (11) (50060) (50064) (400)

Date:

01-04-93 73 <.1 <.1 7.4 01-11-93 73 <.1 <.1 7.1 01-18-93 73 <.1 <.1 7.4 01-25-93 66 <.1 <.1 7.1 02-01-93 68 <.1 <.1 7.5 02-08-93 68 <.1 <.1 7.6 02-15-93 71 <.1 <.1 7.8 02-22-93 66 <.1 <.1 7.1 03-01-93 64 <.1 <.1 7.8 03-08-93 62 <.1 <.1 7.4 03-15-93 66 <.1 <1 7.2 03-22-93 57 <.1 <.1 6.8 03-29-93 66 <.1 <.1 6.9 Number of Samples: 13 13 13 13 Average Value: 67 <.1 <.1 7. 3-Maximum Value: 73 <.1 <.1 7.8 Minimum Value: 57 <.1 <.1 6.8 Limits Exceeded: 0 0 0 0

P0ga 14 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 01-01-93 Plant E.I. Hatch To: 03-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 I certify under the penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted.is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations.

h 1 S L - 80714-0v H. L. Sumner, Jr.

General Manager Nuclear Plant

r q

Paga 1 of 15 i NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: O1G - Low Volume Waste (Neutralization Tank)-

Type of Sample: Grab Frequency of Analysis: 2/Mo Code: (530) (556)

Parameter: Suspended Solids Oil & Grease mg/l mg/l Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 Date:

04-05-93 . 2.9 1.0 04-26-93 13.5 0.0 05-06-93 15.2 0.5 05-19-93 19.0 0.0 06-07-93 0.3 0.0 06-23-93 2.4 0.5 Number of Samples: 6 .6 Average Value: 8.9 0.3 Maximum Value: 19.0 1.0 Minimum Value: 0.3 0.0 Limits Exceeded: -0 0 l

i

.]

Pago 2 of 15 ]

NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge I,ocation: 01H - Low Volume Waste (Pressure Filters Backwash)

Type of Sample: Grab Frequency of Analysis: 1/Qtr Cod e": (530) (556)

Parameter: Suspended Solids 011 & Grease mg/l mg/l Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 Date:

05-17-93 (A) 2 <5 05-17-93 (B) 2 <5 05-17-93 (C) 4 <5 05-17-93 (D) 5 <5 Number of Samples: 4 4 Average Value: 3.3 <5 Maximum Value: 5 <5 Minimum Value: 2 <5 Limits Exceeded: 0 0 l

l

~; _ - - - - . . . . , . ,

Page 3lof 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01A - Cooling Tower Blowdown Unit One Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Grab Mltpl Grab Mitpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium

  1. of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date: --

  • 04-07-93 - -
  • 04-14-93 - - -
  • 04-21-93 - - -
  • 04-28-93' - -
  • 05-04-93 - -

05-12-93 0 0 0 0 -- --

05-19-93 0 0 0 0 --

05-25-93 - - - -

0.4 0 05-26-93 0 0 0 0 --

06-02-93 0 0 0 0 -- --

06-09-93 0 0 0 0 --

06-16-93 0 0 0 0 -- --

06-23-93 0 0 0 0 --

Number of  ;

Samples: 7 7 7 7 1 1 Avg Value: 0 0 0 0 0.4 0 Max Value: 0 0 0 0 0.4 0 Min Value: 0 0 0 0 0.4 0 Limits Exceeded: 0 0 0 0 0 0

  • Note: Unit 1 in outage. Unable to obtain sample.

Page 4 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 I To: 06-30-93 I Plant-E.I. Hatch P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120  ;

Discharge Location: 02A - Cooling Tower Blowdown Unit Two Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Grab Mltpl Grab Mltpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium 4 of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 ti/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

04-07-93 0 0 0 0 .04 0.0 04-14-93 0 0 0 0 --

04-22-93 0 0 0 0 -- --

04-28-93 0 0 0 0 --

05-04-93 0 0 0 0 --

05-12-93 0 0 0 0 --

05-19-93 0 0 0 0 --

05-26-93 0 0 0 0 --

06-02-93 0 0 0 0 --

06-09-93 0 0 0 0 --

06-16-93 0 0 0 0 --

06-23-93 0 0 0 0 --

Number of samples: 12 12 12 12 1 1 Avg Value: 0 0 0 0 .04 0 Max Value: 0 0 0 0 .04 0 Min Value: 0 0 0 0 .04 0 Limits Exceeded: 0 0 0 0 0 0 w

q Page 5 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01B - Unit One Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mltpl Grab Mltpl Grab Mltpl-Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zine Chromium of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (29/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

04-20-93 -- -- -- --

0.8 0.0 Number of Samples: 0 0 0 0 1 1 Avg Value: - - - -

0.8 0.0 Max Value: - - - -

0.8 0.0 Min Value: - - - -

0.8 0.0 Limits Exceeded: 0 0 0~ 0 0 0

Page 6 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: O1I - Unit One Cooling Tower Basin Drains Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mitpl Grab Mltpl Grab Mltpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium of TRC rel max, max.

& TRC avg.

(mg/l) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

There were no discharges from this sample point during this time period.

I i

Number of Samples: O O O O O O 1 Avg Value: - - - - - -

Max Value: - - - - - -

Min Value: - - - - - -

Limits  !

Exceeded: - - - - - -

I i

Pago 7 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01J - Unit One Cooling Tower Basin Overflows to Storm Drains Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type Mltpl Grab Mitpl Grab Mltpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium of TRC rel max. max.

2 & TRC avg.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1) i Limits: 0.2 0.5 120 N/A 1.0 0.2 l Codes: 50064 50064 81400 50060 1092 1034 Date:

06-30-93 - - - - ** **

    • Sample results are to be submitted on next quarter's report due.to lateness of sample and turn around time from the lab.

Discharge occurred C 'ig period of no chlorination. '

Number of Samples: 0 0 0 0 1 1 Avg Value: - - - - ** **

Max Value: - - - - ** **

Min Value: - - - - ** **

Limits Exceeded: - - - - ** **

Pago 8 of.15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 To: 06-30-93 Plant E.I. Match P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02B - Unit Two Cooling Water Overflow To Storm '

Drains Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mitp1 Grab Mltpl Grab Mltpl Grab Grab Grab Frequency:1/Wk/ Unit 1/Wk/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium of TRC rel max. max.

& TRC avg.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1).

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

04-10-93 -- -- -- -- 0 0 Discharge occurred during period of no chlorination.

Number of samples: 0 0 0 0 1 1 Avg Value: - - - -

0 0 Max Value: - - - -

0 0 Min Value: - - - - 0 0 '

Limits Exceeded: - - - -

0 0 l

l

Pegn.9 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From:04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02C - Unit Two Cooling Water Overflow

. Location: Blowdown Blowdown Blowdown Tower Disch. Tower Disch.

Type: Mitpl Grab Mitp1 Grab Mitp1 Grab Grab Grab Frequency:1/Wk/ Unit 1/WX/ Unit 1/Wk/ Unit 1/Qtr 1/Qtr Parameter: Fac Fac max. Total Time Zinc Chromium

  • of TRC rel max. max.

& TRC avg.

(mg/l) (mg/l) (min) (mg/1) (ag/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 Codes: 50064 50064 81400 50060 1092 1034 Date:

04-20-93 -- -- -- -- 0.5 0 Discharge occurred during a period of no chlorination.

Number of Samples: 0 0 0 0 1 1 Avg Value: - - - -

0.5 0 Max Value: - - - -

0.5 0 Min Value: - - - -

0.5 0 Limits 0 0 Exceeded: - - - -

Pago 10 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01E - Low Volume Waste (Liquid Radwaste System Unit One)

Type of Sample: Grab Frequency of Analysis: 2/Mo a

code: (530) (556)

Parameter: TSS O&G Nitrite (Chill Water) Releases mg/l mg/l to discharge point OSN 01 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(Ppm) (gallons) (gpm) (ppb)

Date:

04-05-93 15 1.4 -- --

04-19-93 2 2.8 --

04-26-93 - -

120 6829 12000 720 05-03-93 7 2.5 --

05-17-93 3 7.1 05-29-93 - - 80 6110 16000 357 06-07-93 6 6.3 --

06-21-93 12 3.9 -- --

Number of Samples  : 6 6 2 2 2 2  ;

Average Value: 8 4 100 6470 14000 539 i Maximum Value: 15 6.3 120 6829 16000 720 357 1 Minimum Value: 3 1.4 80 6110 12000 Limits Exceeded: O O NA NA NA NA

q P2g3-11 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02E - Low Volume Waste (Liquid Radwaste System Unit Two)

Type of Sample: Grab Frequency of Analysis: 2/Mo Codea (530) (556)

Parameter: TSS O&G Nitrite (Chill Water) Releases ag/l ag/l to discharge point OSN 02 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb)

Date:

04-05-93 5 0.0 -- -- -- --

04-07-93 - --

320 5015 15000 1488 04-08-93 - --

360 5182 10000 1984 04-10-93 - --

480 4897 11000 2705 04-11-93 - --

80 6591 8500 564 04-19-93 2 2.9 -- -- -- --

05-03-93 1 3.8 -- -- -- --

05-17-93 2 0.0 -- -- -- --

06-07-93 2 1.0 -- -- -- --

06-21-93 2 1.0 -- -- -- --

Number of Samples  : 6 6 4 4 4 4 Average Value: 2.3 1.5 310 5414 11125 1685 <

Maximum Value: 5 3.8 480 6591 15000 2705 Minimum Value: 1 0.0 80 5015 8500 564 Limits Exceeded: 0 0 NA NA NA NA

Pag 3 12 of 15 NPDES: OPERATION MGAITORING REPORT Georgia Power Company From: 04-01-93 To: 06-30-93 Plant E.I. Hatch P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Sewage Treatment Plant Sludge Disposal (lbs/ day / month)

April May June Date 1bs Date lbs Date .l bs No sludge removed 05/06 131 06/01 312 during the month 05/10 138 06/02 196 of April 05/11 196 06/03 436 05/12 128 06/05 1347 05/14 128 06/06 442 05/15 140 06/07 242 05/18 148 06/08 246 05/20 534 06/09 '237 05/22 367 06/10 163 05/25 248 06/11 86 05/26 144 06/12 220 05/27 473 06/13 209 05/28 230 06/15- 378

'06/16 201 This sludge was removed for disposal for incineration and burial as dry active waste. .

l l

l 1

1

Pego 13 of 15 NPDES: OPERATION MONITORING REPORT 4 Georgia Power Company From: 04-01-93 Plant E.I. Hatch To: 06-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit' Number:' GA0004120 Discharge Location: 01 - Combined Plant Waste Streams 'Onit One Frequency of Analysis: 1/Wk Type of Samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Deg. F N/A N/A Min. 6.0 Max. 9.0 Code: (11) (50060) (50064) (400)

Date:

04-05-93 66 <.1 <.1 6.8 04-12-93 62 <.1 <.1 6.7 04-19-93 66 <.1 <.1 7.0 04-26-93 71 <.1 <.1 7.4 05-03-93 73 <.1 <.1 7.5 05-10-93 75 <1 <.1 7.2 05-17-93 82 <.1 <.1 7.4 05-24-93 82 <.1 <.1 8.1 05-31-93 87 <.1 <.1 8.2 06-07-93 88 <.1 <.1 7.3 06-14-93 84 <.1 <.1 8.0 06-21-93 86 0 0 8.1 06-28-93 86 <.1 <.1 7.6 l

i l

I Number of Samples: 13 13 13 13 Average Value: 78 <.1 <.1 7.5 Maximum Value: 88 <.1 <.1 8.2 Minimum Value: 62 0 0 6.7 Limits Exceeded: 0 0 0 0

.q Paga 14 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company From: 04-01-93 To: 06-30-93 Plant E.I. Hatch

.P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02 - Combined Plant Waste Streams Unit Two  ;

Frequency of Analysis: 1/Wk Type of samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH ,

Limits: Deg. F N/A N/A Min. 6.0 Hax. 9.0 Code: (11) (50060) (50064) (400)

Date:

04-05-93 66 <.1 <.1 6.8 04-12-93 64 <.1 <.1 6.8 04-19-93 69 <.1 <.1 7.5 04-26-93 68 <.1 <.1 7.4 05-03-93 75 <.1 <.1 7.7 05-10-93 77 <.1 <.1 7.4 05-17-93 82 <.1 <.1 7.6 05-24-93 78 <.1 <.1 8.2-05-31-93 82 <.1 <.1 7.6 06-07-93 91 <.1 <.1 7.6 06-14-93 86 <.1 <.1 8.1 06-21-93 86 0 0 8.0 06-28-93 87 <.1 <.1 7.6 Number of Samples: 13 13 13 13 l Average Value: 78 <.1 <.1 7.6 l Haximum Value: 91 <.1 <.1 8.2  !

Minimum Value: 64 0 0 6.8 Limits Exceeded: 0 0 0 0

.i

a- ,

'Psg3 15 of--15 x q NPDES: OPERATION MONITORING REPORT:

-Georgia Power. company From:- 04-01-93 Plant E.I. Hatch To: ' 06-30-93 P.O. Box 4545

. Atlanta, Georgia 30302 Permit Number: GA0004120-I certify under the penalty of law that this document and all attachments were prepared under my direction;or' supervision in accordance with, a system designed to assure that qualified. personnel properly gather,-

and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible .for gathering the information, the information' submitted is, to the best of my knowledge and belief, true, accurate,:and. complete.- I am aware that there are significant penalties for submitting false, information, including the possibility of fine'and imprisonment for known violations.

~

01/MC

'H. L.

ltwi&

Sumner, Jr.

General Manager Nuclear Plant I

i

)

QUARTERLY OPERATIONAL MONITORING REPORT From: 07-01-93 Georgia Power Company 09-30-93 To:

Plant E.I. Hatch P.O. Box 4545 GA0004120 Atlantn, Georgia 30302 Permit Number:

Discharge Location: 01G - Low Volume Waste (Neutralization Tank)

Type of Sample: Grab Grab Frequency of Analysis: 2/ Month 2/ Month PCS Code: (530) (556)

Parameter: Suspended Solids mg/l (TSS) Oil & Grease ug/l (O&G)

Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 TSS O&G Daini MG/L MG/L 07-Os-93 12.5 4.0 07-20-93 5.0 0.0 08-02-93 3.4 2.5 08-22-93 22.0 0.0 09-06-93 1.6 0.6 09-24-93 8.0 0.0 Month of Juiv No. of Samples: 2 2 Average Value: 8.8 2.0 Max Value: 12.5 4.0 Min. Value: 5.0 0.0 Limits Exceeded: 0 0 Konth of Aucust 2 No. of Samples: 2 Average Value: 13.7 1.3 Max, Value: 22.0 2.5 Min. Value 3.4 0.0 Limits Exceeded: 0 0 Month of September No. of Samples: 2 2 Average Value: 4.8 0.3 Max. Value: 8.0 0.6 Min. Value: 1.6 0.0 Limits Exceeded: 0 0 Page 1 of 15

1

' QUARTERLY OPERATIONAL MONITORING _ REPORT l Georgia-Power Company' From: 07-01 . Plant E.I. Hatch To:- 09-30-93.

P.O.. Box 4545 Atlanta, Georgia 30302 Permit. Number: GA0004120 Discharge Location: 01H - Low Volume Waste (Pressure Filters Backwash)

Type of Sample: Grab Grab

. Frequency of Analysis: 1/ Quarter 1/ Quarter.

PCS Code: (530) (556)

Parameter: -Suspended Solids mg/l (TSS) Oil & Grease.mg/l (O&G)

_ Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 TSS O&G Date: liga MG/L 08-19-93 (A) <1 <5 08-17-93 (B) <1 <5 08-17-93 (C) <1 <5 08-17-93 (D) <1 <5 3

Month of July:

No. of Samples: 0 0 Average Value: ---

Max. Value: ---

Min. Value: ---

Limits Exceeded: --- ---

Month of Auciust:

No. of Samples: 4 2 Average Value: <1 <5 Max. Value: <1 < 5.

Min. Value <1 <5-Limits Exceeded: 0 0 Month of Sootember:

No. of Samples: 0 0 Average Value: ---

-Max. Value: ---

Min. Value: ---

Limits Exceeded: --- ---

4 Page 2 of 15 4

  1. - . . , , ;. .~

., . , , . . , . . . . , ....m. , . _ . f . ., _ .

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 To: 09-30-93 Plant E.I. Hatch P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Dischargo Location: 01A - Unit one Cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mltpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/l) (min)(mg/1) (mg/1) (mg/1) 0.2 0.5 120 N/A 1.0 0.2 Limits:

PCS Code: 50064 50064 81400 50060 1092 1034 DatM --

07-02-93 0 0 0 0 --

07-06-93 0 0 0 0 .04 0.0 07-14-93 0 0 0 0 --

07-21-93 0 0 0 0 --

07-28-93 0 0 0 0 -- --

08-04-93 0 0 0 0 --

08-11-93 0 0 0 0 -- --

08-18-93 0 0 0 0 --

08-25-93 0 0 0 0 --

09-01-93 0 0 0 0 --

09-08-93 0 0 0 0 --

09-15-93 0 0 0 0 --

09-22-93 0 0 0 0 --

09-29-93 0 0 0 0 --

Mpnth of July:

5 5 5 5 1 1 No. of Samples:

Avg. Value: 0 0 0 0 .04 0.0 Max. Value: 0 0 0 0 .04 0.0 Min. Value: 0 0 0 0 .04 0.0 0 0 0 0 0 Limits Exceeded: 0 Month of Aucust:

No. of Samples: 4 4 4 4 0 0 Avg. Value: 0 0 0 0 ---

Max. Value: 0 0 0 0 ---

Min. Value: 0 0 0 0 ---

Limits Exceeded: 0 0 0 0 ---

Month of September:

No. of Samples: 5 5 5 5 0 0 Avg. Value: 0 0 0 0 ---

Max. Value: 0 0 0 0 ---

Min. Value: 0 0 0 0 ---

Limits Exceeded: O O O O ---

Page 3 of 15

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 Plant E.I. Hatch To: 09-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02A - Unit Two Cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mitpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min)(ag/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 pptet 07-02-93 0 0 0 0 ---

0 0 0 0 0.4 .02 0.7-06-93 ---

07-14-93 0 0 0 0 ---

07-21-93 0 0 0 0 --- ---

07-28-93 0 0 0 0 ---

08-04-93 0 0 0 0 --- ---

08-11-93 0 0 0 0 ---

08-18-93 0 0 0 0 --- ---

08-75-93 0 0 0 0 --- ---

09-01-93 0 0 0 0 -- --

09-08-93 0 0 0 0 --

09-15-93 0 0 0 0 -- --

09-22-93 0 0 0 0 --

09-29-93 0 0 0 0 --

Month of Julv:

No. of Samples: 5 5 5 5 1 1 Avg. Value: 0 0 0 0 0.4 .02 Max. Value: 0 0 0 0 0.4 .02 Min. Value: 0 0 0 0 0.4 .02 Limits Exceeded: 0 0 0 0 0 0 Month of August:

No. of Samples: 4 4 4 4 0 0 Avg. Value: 0 0 0 0 ---

Max. Value: 0 0 0 0 ---

Min. Value: 0 0 0 0 ---

Limits Exceeded: 0 0 0 0 ---

Month of September:

No. of Samples: 5 5 5 5 0 0 Avg. Value: 0 0 0 0 ---

Max. Value: 0 0 0 0 ---

Min. Value: 0 0 0 0 ---

Limits Exceeded: 0 0 0 0 ---

1 l

l Page 4 of 15 1

1 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 Plant E.I. Match To: 09-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01B - Unit One Cooling Water overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mitp1 M1tpl Mitpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min)(mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 E.?LtII.

Cooling water did not overflow during this reporting period.

Mpnth of July:

No. of Samples:

Avg. Value:

Max. Value:

Min. Value:

, Limits Exceeded: (

Month of Aucust:

No. of Samples:

Avg. Value:

Max. Value:

Min. Value:

Limits Exceeded:

Mpnth of Sectember:

No. of Samples:

Avg. Value:

Max. Value:

Min. Value:

Limits Exceeded:

Page 5 of 15

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 To: 09-30-93 Plant E.I. Hatch P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01I - Unit One Cooling Tower Basin Drains Location: Blowdown Blowdown Blowdown Toder Basin Tower Basin Type: Mltpl Mltpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Dptet Basins were not drained during this reporting period.

Month of Julv:

No. of Samples:

Avg. Value:

Max. Value:

Min. Value:

Limits Exceeded:

Month of Auaust:

No. of Samples:

Avg. Value:

Max. Value:

Min. Value:

Limits Exceeded:

Month of September:

No. of Samples:

Avg. Value:

Max. Value-Min. Value:

Limits Exceeded:

l 1

Page 6 of 15

___ __ _- _ ______- _ - __- - __ - __ _ _ __ O

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 Plant E.I. Match To: 09-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01J - Unit One Cooling Tower Basin Overflows to Storm Drains .

Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mltpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

Basins did not overflow during this reporting period.

Month of July:

No. of Samples:

Avg. Value:

Max. Value:

  • Min. Value:

Limits Exceeded:

Month of Auaust:

No. of samples:

Avg. Value:

Max. Value:

Min. Value:

Limits Exceeded:

Month of Sentember:

No. of Samples:

Avg. Value:

Max, Value:

Min. Value:

Limits Exceeded:

Page 7 of 15

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 Plant E.I. Hatch To: 09-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02B - Unit Two Cooling Water Overflow To Storm Drains Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mltpl Mltp1 Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS tode: 50064 50064 81400 50060 1092 1034 Date:

07-01-93 - - - -

0.39 0.0 08-26-93 - - - -

0.50 0.0 Mpnth of Julv:

No. of Samples: 0 0 0 0 1 1 Avg. Value: --- --- --- ---

0.39 0.0 Max. Value: --- --- --- ---

0.39 0.0 Min. Value: --- --- --- --- 0.39 0.0 Limits Exceeded:--- --- --- ---

0 0 Month of August:

No. of Samples: 0 0 0 0 1 1 Avg. Value: --- --- -'- ---

0.50 0.0 Max. Value: --- --- --- ---

0.50 0.0 Min. Value: --- --- --- --- 0.50 0.0 Limits Exceeded:--- --- --- ---

0 0 Month qf Sentember:

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- ---

Max. Value: --- --- ---

Min. Value: --- ---

Limits Exceeded:--- ---

Discharges occurred during periods of no chlorination.

Page 8 of 15

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 To: 09-30-93 Plant E.I. Match -

P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02C - Unit Two Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltp1 Mitpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1) 0.2 0.5 120 N/A 1.0 0. 2 -

Limits:

PCS Code: 50064 50064 81400 50060 1092 1034 Dn%cF 07-21-93 -- -- -- -- 0.27 0.0 Month of Julv:

0 0 0 1 1 No. of Samples: 0 Avg. Value: --- --- --- --- 0.27 0.0 Max. Value: --- --- --- --- 0.27 0.0

--- --- 0.27 0.0 Min. Value: --- ---

--- --- 0 0 Limits Exceeded:--- ---

Month of August:

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- ---

Max. Value: --- --- ---

Min. Value: --- ---

Limits Exceeded:--- --- ---

Month of September:

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- ---

Max. Value: --- ---

Min. Value: --- ---

Limits Exceeded:--- ---

Discharge occurred during period of no chlorination.

l Page 9 of 15 i

l 1

l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 Plant E.I. Hatch To: 09-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01E - Lov Volume Waste (Liquid Radwaste System Unit One)

Type of sample: Grab Frequency of Analysis: 2/ Month PCS Code: (530) (556)

Parameter: TSS O&G Nitrite (Chill Water) Releases mg/l ag/l to discharge point OSN 01 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

  1. (ppm) (gallons) (gpm) (ppb)

Date:

07-06-93 8 2.4 --

07-19-93 .2 0.5 --

08-02-93 2 2.9 --

08-16-93 28 2.5 --

09-06-93 11 0.3 --

09-20-93 7 1.3 Month of July:

No. of Samples 2 2 0 0 0 0 Average Value: 4.1 1.5 Max. Value 8.0 2.4 ---

Min. Value 0.2 0.5 ---

Limits Exceeded: 0 0 --- --- --- ---

Epnth of Auaust:

No. of Samples 2 2 0 0 0 0 Average Value: 15 2.7 ---

Max. Value 28 2.9 ---

Min. Value 2 2.5 Limits Exceeded: ---

0 0 ---

Month of September:

No. of Samples 2 2 0 0 0 0 Average Value: 9 0.8 Max. Value 11 1.3 ---

Min. Value 7 0.3 Limits Exceeded: 0 0 ---

Page 10 of 15 j

Fro 3: 07-01-93 G0orgin Powar Company To: 09-30-93 Plcnt E.I. Hatch P.O.-Box 4545 Permit Number: GA0004120 I

Atlanta, Georgia 30302 Discharge Location: 02E - Low Volume Waste (Liquid Radwaste System Unit Two)

I Type of Sample: Grab Frequency of Analysis: 2/ Month PCS Code: (530) (556)

Parameter: TSS O&G Nitrite (Chill Water) Releases ag/l mg/l to discharge point OSN 02 Avg. 15 Initial -Amount Dilution Final Limits: Avg. 30 Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb)

Date:

07-05-93 1.2 2.4 --

07-20-93 1 0.5 --

08-02-93 1 0.0 --

08-16-93 0.8 0.0 --

09-06-93 4.2 0.0 --

09-20-93 0.5 1.0 Month of Julv: 0 0 2 2 0 0 No. of Samples --- --- --- ---

Average Value: 1.1 2.3 ---

Max. Value 1.2 4.0 ---

Min. Value 1.0 0.5 ---

Limits Exceeded: 0 0 ---

Month of Aunust: 0 0 0 0 No. of Samples 2 2 ---

Average Value: 0.9 1.3 ---

Max. Value 1.0 2.5 ---

Min. Value 0.8 0.0 ---

Limits Exceeded: 0 0 ---

Month of September: O O No. of Samples 2 2 0 .

O Average Value: 1 0.5 ---

Max. Value 1.6 1.0 ---

Min. Value 0.5 0.0 ---

Limits Exceeded: 0 0 ---

Page 11 of 15

.. . . . . . , - . ~. . .. .- . . ., . . . . -

1 1

_ QUARTERLY OPERATIONAL MONITORING REPORT

- Georgia Power Company- From: 07-01-93 To : ' 09-30-93 Plant 1E.I. Hatch

< P.O. Box 4545 .

-Atlanta, Georgia' 30302 Permit' Number:- GA0004120 Sewage Treatment. Plant sludge Disposal (1bs/ day / month) is-July August September Date 1bs Date Ibs Date Ibs No sludge removed No sludge removed 09/21 _288 during'the' month during the month 09/22 216 of July of-August E

'A

.This sludge was removed for disposal as dry active vaste.

1 Page 12 of 15 l

2

-- - - - - - - - - - _ - _ _ _ _ _ _ _ _ _ .m_ _ _-- . .Es. , e- - . ,y .y e_, . 3 4 ,-. --

QUARTERLY OPERATIONAL MONITORING REPORT i

Georgia Power Company From: 07-01-93 Plant E.I. Hatch To: 09-30-93 .

)

P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01 - Combined Plant Waste Streams Unit One-  ;

l Frequency of Analysis: 1/ Week Type of Samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Degree F N/A N/A Min. 6.0 Max. 9.0 PCS Code: (11) (50060) (50064) (400)

DJlLt&1.

07-05-93 91 <.1 <.1 7.5 07-li-93 89 <.1 <.1 8.2 07-19-93 89 <.1 <.1 8.4 07-26-93 89 <.1 <.1 8.3 08-02-93 89 <.1 <.1 6.7 08-09-93 89 <.1 <.1 7.4 08-16-93 87 <.1 <.1 7.G 08-23-93 95 <.1 <.1 7.6 08-30-93 89 <.1 <.1 8.2 09-06-93 89 <.1 <.1 7.2 09-13-93 69 - <.1 <.1 8.4 09-20-93 85 <.1 <.1 8.2 09-27-93 89 <.1 <.1 8.4 Month of Julv:

No. of Samples 4 4 4 4 Average Value: 90 <.1 <.1 8.2 Max. Value 91 <.1 <.1 8.4 Min. Value 89 <.1 <.1 7.5 Limits Exceeded: 0 0 0 0 Month of Aucust:

No. of Samples 5 5 5 5 Average Value: 90 <.1 <.1 7.5 Max. Value 95 <.1 <.1 8.2 Min. Value 87 <.1 <.1 6.7 Limits Exceeded: 0 0 0 0 Month of September:

No. of Samples 4 4 4 4 Average Value: 83 <.1 <.1 8.1 Max. Value 89 <.1 <.1 8.4 Min. Value 69 <.1 <.1 7.2 Limits Exceeded: 0 0 0 0 Page 13 of 15

J *1

-I QUARTERLY OPERATIONAL MONITORING' REPORT ,

- Georgia Power Company- - From: 07-01-93 )

.To: 09-30-93  :

)

- Plant E.I. Hatch P ; O '. Box 4545-Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02 ~ - Combined Plant Waste Streams Unit Two Frequency of Analysis: 1/ Week .

Grab.

Type of; Samples: In Situ Grab Grab Parameter: Temperature T.R.C. F.A.C. .pH Limits: Degree F N/A. N/A= Min. 6.0 Max. 9.0 Code: (11) (50060) (50064) (400)-

Date; a

07-05-93 93 <.1 <.1 7.7 07-12-93 87 <.1 <.1 7.9 07-19-93 87 <.1 <.1 8.3 07-26-93 91 <.1 <.1 '8.2-08-03-93 87 <.1 <.1 8.3 08-10-93 84 <.1 <.1 8.4 08-17-93 87 <.1 <.1 7.5 08-24-93 93 <.1 <.1 8.3 08-31-93 89 <.1 <.1 7.7 06-93 87 <.1 <.1' 7.7 82 <.1 <.1 uB . 3 09-13-93 09-20-93 89 <.1 <.1 8.3 09-27-93 86 <.1 < .1 - 8.5 Month of Julv:

No. of Samples 4 4 4 4-Average Value: 90 <.1 <.i 8.0 Max. Value 93 <.1 <.1 8 .'3 Min. Value 87 <.1 <.1 7.7 Limits Exceeded: 0 0 0 0 ,

' Mpnth of Auaust:

No. of Samples 5 5 5 5 Average Value: 88 <.1 <.1- 8.0 Max. Value 93 <.1 <.1 8.4 Min. Value 84 <.1 <.1 7.5 0 0 0

' Limits Exceeded: 0

. Month of September:

4- 4 4, No. of Samples .4 Average Value: 86 , <.1 <.1 -8.2 Max. Value 89 ' <.1 <.1 8.5 Min. Value 82 <.1 <.1 7.7 Limits Exceeded: 0 0 .0 0 Page 14 of.15

-t-- ,t w se ., 'wy- 4 .- fu

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-93 Plant E.I. Hatch To: 09-30-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 I certify under the penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the pers6n or persons who manage the system, or those persons directly gesponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations.

(' '~) ' (s

./ 44,'0 0 h/VM b1 H. L. Sumner, Jr.

General Manager Nuclear Plant l

J l

Page 15 of 15 l l

l l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545 .

Atlanta, Georgia 30302' Permit Number: GA0004120 Discharge Location: O1G - Low Volume Waste (Neutralization Tank)

Type of Sample: Grab- Grab Frequency of Analysis: 2/ Month 2/ Month PCS Code: (530) (556)

Parameter: Suspended Solids mg/l (TSS) Oil & Grease mg/l ~ (O&G)

Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 TSS O&G Datet liG/_h MG/L 10-05-93 8.s 1.0 10-19-93 33.5 3.3 11-0.1-93 0.6 0.4 11-2. 93 8.8 1.8 12-06-93 1.5 0.0 12-20-93 6.0 2.9 Month of October No. of Samples: 2 2 Average Value: 20.9 2.2 Max. Value: 33.5 3.3 Min. Value: 8.3 1.0 Limits Exceeded: 0 0 Month of November No; of Samples: 2 2 Average Value: 4.7 1.1 Max, Value: 8.8 1.8 Min, Value 0.6 0.4 Limits Exceeded: 0. O Month of December No. of Samples: 2 2 Average.Value: 3.8 1.5 Max. Value: 6.0 2.9 Min. Value: 1.5 0.0 Limits' Exceeded: 0 0 Page 1 of 15

. ~ . .~ _ . . . . ._ _ _

QUARTERLY OPERATIONAL ~ MONITORING REPORT

' Georgia Power Company From: 10-01-93 Plant E . I -. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, _ Georgia 30302 Permit Number: GA0004120 Discharge Location: 01H - Low Volume Waste (Pressure Filters' Backwash)

Type of Sample: Grab Grab Frequency of Analysis: 1/ Quarter 1/ Quarter PCS Code: (530) (556)

Parameter: Suspended Solids mg/l (TSS) Oil & Grease mg/l (O&G)

. Limits: Avg. 30 -Avg. 15 Max. 100 Max. 20 TSS O&G Date: MG/L MG/L 11~-08-93 (A) <1 <5 11-08-93 (B) 2 <5 11-08-93 (C) <1 <5 11-08-93 (D) <1 <5 Month of October:

No. of Samples: 0 0 Average Value: --- ---

Max. Value: --- ---

Min, Value: --- ---

Limits Exceeded: --- ---

Month of Novemb;_r_;;.

r No. of Samples: 4 4 Average Value- <1 <5 Max. Value: 2 <5 Min. Value <1 <5 Limits Exceeded: 0 0 Month of December:

No. of Samples:

0 0 Average Value: --- ---

Max Value: --- ---

Min. Value: --- ---

Limits Exceeded: ---

Page 2 of 15 w si --r. __-- - av--- ,

r-l QUARTERLY: OPERATIONAL MONITORING REPORT-

. Georgia Power Company From.: 10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120

' Discharge Location: 01A - Unit One cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tow'er Basin Tower Basin fType: .Mltpl Mltpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1. 0' O.2 PCS Cpde: 50064 50064 01400 50060 -1092 1034

~'

Date:

10-04-93 -- -- -- --

0.3 0.0 10-07-93 0 0 0 0 -- --

10-14-93 0 0 0 0 -- --

.10-20-93 0 0 0 0 -- --

i 0 10-28-93 0 0 0 -- --

11-03-93 0 0 0 0 --

31-10-93 0 0 0 0 -- --

11-17-93 0 0 0 0 -- --

11-24-93 0 0 0 0 -- --

12-01-93 0 0 0 0 -- --

12-08-93 0 0 0 0 -- --

12-15-93 0 0 0 0 --

12-22-93 0 0 0 0 -- --

12-29-93 0 0 0 0 --

Month of October:

No. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 0.3 0.0 Max. Value: 0 0 0 0 0.3 0.0 Min. Value: 0 0 0 0 0.3 0.0 '

Limits Exceeded: 0 0 0 0 0 0 Month of November:

No. of Samples: 4 4 4 4 0 0 Avg Value: 0 0 0 0 --- ---

Max. Value: 0 0 0 0 ---

Min. Value: 0 0 0 0 --

-Limits Exceeded: 0 0 0 0 ---

Month of December:

No. of Samples: 5 5 5 5 0 0 Avg. Value: .0 0 CF 0 ----

Max. Value: 0 0 0 0 ---

Min. Value: 0 0 0 0 ---

Limits Exceeded: 0 0 0 0 ---

'Page 3 of 15 i

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia- 30302 Permit Number: GA0004120 Discharge Location: 02A - Unit Two Cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tower Basin- Tower Basin Type: Mltp1 Mitpl Mltp1 Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max, max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code:

~

50064 50064 81400 50060 '

1092 1034 Date:

10-04-93 -- -- -- --

.05 0. 0.

.10-07-93 0 0 0 0 --- ---

10-14-93 0 0 0 0 --- ---

10-20-93 0 0 0 0 --- ---

10-28-93 0 0 0 0 --- ---

11-03-93 0 0 0 0 --- ---

11-10-93 0 0 0 0 --- ---

11-17-93 0 0 0 0 --- ---

11-24-93 0 0 0 0 --- ---

12-01-93 0 0 0 0 -- --

12-08-93 0 0 0 0 -- --

12-15-93 0 0 0 0 -- --

12-22-93 0 0 0 0 -- --

12-29-93 0 0 0 0 -- --

Month of October:

No. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 .05 0.0 Max. Value: 0 0 0 0 .05 0.0 Min. Value: 0 0 0 0 .05 0.0 Limits Exceeded: 0 0 0 0 0 0 Month of November:

No. of Samples: 4 4 4 4 0 0 Avg._Value: 0 0 0 0 --- ---

Max. Value: O O O O --- ---

Min. Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 0 0 --- ---

Month of December:

No. of Samples: 5 5 5 5 0 0 Avg. Value: 0 0 0 0 --- ---

. Max. Value: 0 0 0 0 --- ---

Min. Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 0 0 --- ---

Page 4 of 15

QUAR,TERLY OPERATIONAL MONITORING REPORT h Georgia Power Company From: 10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01B - Unit One Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mltpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max.' Total Time TRC Zine Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 ,

pate:~

10-13-93 -- -- -- --

.20 0.0 overflow did not occur during period of chlorination.

Month of October: 3 No. of Samples: 0 0 0 0 1 1 i Avg. Value: -- -- -- -- .20 0.0 Max. Value: -- -- -- -- .20 0.0 Min. Value: -- -- -- -- .20 0. 0.

Limits Exceeded:-- -- -- --

0 0 Month of November:

No. of Samples: 0 0 0 0 0- 0 Avg. Value: -- -- -- --

Max. Value: -- -- --

Min. Value: -- -- -- --

Limits Exceeded:-- -- -- --

Month of December:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- --

Max. Value: -- --

Min. Value: -- -- --

Limits Exceeded:-- -- -- --

i 1

i i

1 l

l Page 5 of 15

QUARTERLY. OPERATIONAL MONITORING REPORT Georgia-Power Company From: 10-01-93 Plant E.I. Hatch To: 12-31 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: O1I - Unit One Cooling Tower Basin Drains

, Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mitpl Mltpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date?

1 Basins were not drained during this reporting period.

Month of October:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Min. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

i Month of November:

1 No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Min. Value: -- -- -- -- -- --

i Limits Exceeded:-- -- -- -- -- --

Month of December:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- -- ,

Max, Value: -- -- -- -- -- --

l Min. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- - --

I a

l l

Page 6 of 15 1 i

1 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power' Company From: 10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545

- Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01J - Unit One Cooling Tower Basin Overflows to Storm Drains '

Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mitp1 M1tpl Mitpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC .Zine Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg /1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 '0.2 PCS Cbde: 50064 50064 81400 50060 1092 1034 Date:

10-13-93 -- -- -- --

.15 0.0 i

Chlorination did not occur during period of overflow.

Month of October:

No. of Samples: 0 0 0 0 1 -1 Avg. Value: -- -- -- --

.15 0.0 Max..Value: -- -- -- --

.15 0.0 Min'. Value: -- -- -- --

.15 0.0' l

Limits Exceeded: -- -- -- -- -0 0 Month of November:

No. of Samples: 0 0 0 0 0 0

, Avg. Value: -- -- -- -- - - -

Max. Value: -- -- -- -- --

Min. Value: -- -- -- -- --

Limits Exceeded: -- -- -- -- --

Month of' December:

No.'of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- --

-Max. Value: -- -- -- --

- Min. Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- --

l l Page 7 of-15

.e,-- t %w --,,e -+-w , v..--r . . .

. - - - > -s m e - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

-QUARTERLY OPERATIONAL MONITORING REPORT l Georgia. Power Company From: 10-01-93

Plant.E.I. Hatch To: :12-31-93 i

'P,0. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 i

Discharge Location: 02B - Unit Two Cooling Water Overflow To Storm l Drains Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mltpl Mltp1 Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zine Chromium rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Cbde: 50064 50064 81400 50060 1092 1034' Date:

10-14-93 - - - -

0.07 0.0 Month of October:

No. of Samples: 0 0 0 0 1 1 Avg. Value: --- --- --- ---

0.07 0.0 Max. Value: --- --- --- ---

0.07 0.0 Min.. Value: --- --- --- ---

0.07 0.0 Limits Exceeded:--- --- --- --- 0 0 Mgnth of November No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- -- --

Max. Value: --- --- --- --- -- --

Min. Value: --- --- --- --- -- --

Limits Exceeded:--- --- --- --- -- --

Month of December:

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- ---

Max, Value: --- --- --- --- --- ---

Min. Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

i-Discharge occurred during periods of no chlorination.

I b

l l

l' i~

Page 8 of 15 i

fi _ _ . . _ . ._ - . _ , _ , _ _ _ _

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From:. 10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Locatic.?n : 02C - Unit Two Cooling Water overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin

. Type: Mltpl Mltpl Mitpl Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zine Chromium rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:"

14-93 -- -- -- --

0.05 .01 Month of 1ctober:

No. of Samples: 0 0 0 0 1 1 Avg. Value: --- --- --- ---

0.05 .01 Max. Value: --- --- --- ---

0.05 .01 Min Value: --- --- --- ---

0.05 .01 Limits Fxceeded:--- --- --- --- 0 0 Month of November:

No. of Samples: 0 0

  • 0 0 -0 0 Avg. Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- ---

Min. Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- ---- --- ---

Month of December:

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- ---

Min. Value: --- --- --- --- --- ---

i Limits Exceeded:--- --- --- --- --- ---

Discharge occurred during period of no chlorination, i

s I

Page 9 of 15

-1

E ~l QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 10-01-93

= Plant E.I. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01E - Low Volume Waste (Liquid Radwaste System Unit One)

Type of Sample: Grab Frequency of Analyrls: 2/ Month PCS Code: (53C) (556)

Parameter: TSS O&G Nitrite (Chill Water) Releases.

mg/l mg/l to discharge-point OSN 01 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate ' Conc.

(ppm) (gallons) (gpm) (ppb)

Date:

10-04 12 1.9 - -- -- --

10-09-93 -- --

80 6140 17000 31 10-10-93 -- --

80 6890 17500 32 10-12-93 -- --

80 6640 16000 33 10-12-93 -- --

80 6890 14000 38 10-13-93 -- --

80 6540 23000 25 l

10-19-93 5 3.8 -- -- -- -- '

11-01-93 3 1.5 -- -- -- --

11-15-93 6 0.9 -- -- -- --

12-07-93 1 3.8 -- -- -- --

12-26-93 19 1.6 -- -- -- --

)

Mpnth of October:

-No. of Samples 2 2 5 5 5 5 Average Value: 8.5 2.9 80 6620 17500 32 j Max, Value 12 3.8 80 6890 23000 38 '

Min. Value 5 1.9 80 6140 14000 25 l Limits Exceeded: 0 0 0 0 0 0 l Month of November- .

No. of Samples 2 2 0 0 0 0  !

Average Valuct 5 1.2 --- --- --- ---

Max. Value 6 1.5 --- --- --- ---

I j

~

Min. Value 3 0.9 --- --- --- ---

' Limits Exceeded: 0 0 --- --- --- ---

Month of December:

'No. of Samples 2 2 0 0 0 0

, Average Value: 10 2.7 --- --- --- ---

Max. Value 19 3.8 --- --- --- ---

Min. Value 1 1.6 --- --- --- ---

Limits Exceeded: 0 0 --- --- --- ---

1 1

I i

l I

Page 10 of 15 I I

1 I

.m.

. ~ m. , # , - - - -

QUARTERLY OPERATIONAL MONITORING REPORT-f Georgia Power Company From: 10-01-93 Plant E,I. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120

. Discharge Location: 02E - Low Volume Waste (Liquid Radwaste System Unit Two)

-Type of Sample: Grab Frequency of Analysis: 2/ Month PCS Code: (530) (556)

Parameter: TSS O&G Nitrite (Chill Water) Releases mg/l . mg/l to discharge point OSN 02 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb)

Date.:

10-04-93 0.3 0.5 -- -- -- --

10-18-93 0.7 1.0 -- -- -- --

11-01-93 1 1.0 -- -- -- --

11-15-93 1.3 2.0 -- -- -- --

12-06-93 0. 8 0.8 -- -- -- --

12-20-93 4.5 1.6 -- -- -- --

Month of October:

No. of Samples 2 2 0 0 0 0 Average Value: 0.5 0.8 --- --- --- ---

0.7 1.0 --- '

Max. Value --- --- ---

Min. Value 0.3 0.5 --- --- --- ---

Limits Exceeded: 0 0 --- --- --- - - -

Month of November:

No. of-Samples 2 2 0 0 0 0 Average Value: 1.2 1.5 --- --- --- ---

Max. Value 1.3 2.0 --- --- ---

Min. Value 1.0 1.0 --- --- --- ---

j Limits Exceeded: 0 0 --- --- ---

Mont h of DecemlLqr_:,.

No. of Samples 2 2 0 0 0 0 Average Value: 2.7 1.2 --- --- ---

Max. Value 4.5 1.6 --- - - - ---

Min-.Value 0.8 0.8 --- --- --- ---

Limits Exceeded: 0 0 --- --- --- ---  :

I l

l 1

l 1

l Page 11 of 15 1

1

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: '10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545' Atlanta, Georgia 30302 Permit Number: GA0004120 Sewage Treatment Plant Sludge Disposal (lbs/ day / month)

October November December Date' lbs Date 1bs Date lbs No sludge removed No sludge. removed 12/20 2893 during the month during the month 12/21 6300 of October of November 12/22 2893 12/23 11576 12/27 7235 12/29 13161 12/30 2481 Total '48921 l ,

i l i

l This sludge was removed for disposal as dry active waste.

I i

1 1

i Page 12'of 15-j

. , _ . _. .,, - - . , . ~ . _ . .

.- - . - _ - - _ . - _ _ , _ _ - _ _ . - ~ _ _ _ . , _ _ _ . . _ _ _ . , -._ -. _ _ ., ,

QUARTERLY OPERATIONAL MONITORING REPORT.

~

. Georgia Power Company From: 10-01-93 Plant E.I. Hatch Tot 12-31-93

.i P.O. Box 4545 2

Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 01 - Combined Plant Waste Streams Unit One Frequency of Analysis: 1/ Week Type of Samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Degree F N/A N/A Min. 6.0 Max. 9.0 PCS Code: (11) (50060) (50064) (400)

Date:

10-04-93 82 <.1 <.1 8.3-10-11093 80 <.1 <.1 8.3

.10-18-93 80 <.1 c.1 8.3 10-25-93 66 <.1 <.1 7.9

. 11-01-93 68 <.1 <.1 8.2 11-08-93 71 <.1 <.1 7.1 11-15-93 69 <.1 <.1 7.4 11-22-93 73 <.1 <.1 8.1 11-29-93 69 <.1 <.1 8.2 12-06-93  ?$ <.1 <.1 8.0 i 12-13-93 66 <.1 <.1 7.9 12-20-93 66 c.1 c.1 7.7 7.8 12-27-93 53 <.1 <.1 Month of October:

No. of Samples 4 4 4 4

) Average Value: 77 <.1 <.1 8.2 Max. Value 82 <.1 c.1 8.3 Min. Value 66 <.1 <.1 7.9 Limits Exceeded: 0 0 0 0 Month of November:

i No. of Samples 5 5 5 5 Average Value: 70 <.1 <.1 7.8

Max. Value 73 <.1 <1 8.2

. Min. Value 68 <1 <.1 7.1 Limits Exceeded: 0 0 0 0 Month of-December:

No. of Samples 4 4 4 .4 Average Valuei 65 c.1 <.1 7.8 Max. Value- 75 <.1 <.1 8.0

! Min. Value 53 <.1, <.1 7.8 Limits Exceeded: 0 0 0' O l

t Page 13 of 15 ,

4 ..

. , . ~ , - . -. ... -, ,. . . - , .- - . . - .

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 10-01-93 Plant E,I. - Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120 Discharge Location: 02 - Combined Plant Waste Streams Unit'Two Frequency of Analysis: 1/ Week Type of Samples: In Situ Grab Grab Grab-Parameter: Temperature T.R.C. F.A.C. pH i Limits: Degree F N/A N/A Min. 6.0 Max. 9.0 Code: (11) (50060) (50064) (400)

Date:,

10-04-93 80 <.1 <.1 8.2 10-11-93 82 c.1 <.1 7.7 10-18-93 82 <.1 <.1 7.8 10-29-93 72 c.1 <.1 8.4 11-01-93 69 <.1 <.1 8.4 11-08-93 55 <.1 <.1 7.2 11-15-93 69 c.1 <.1 7.6 11-22-93 71 c.1 <.1 8.2 11-29-93 60 <.1 <.1 8.1

,12-06-93 69- c.1 <.1 7.7 12-13-93 66 <.1 c.1 8.0 12-20-93 68 <.1 <.1 8.0 12-27-93 66 <.1 <.1 7.9 4

Mqnth of October:

No. of Samples 4 4 4 .4 Average Value; 79 <.1 <.1 8.0 Max, Value 82 <.1 <.1 8.4 Min. Value 72 <.1 <.1 7.7 Limits Exceeded: 0 0 0 0 Month of' November:

. No. of Samples 5 5 5 5 Average Value: -

65 <.1 <1 7. 9 '

Max. Value 71 <.1 <.1 8.4

mit E ceeded
b b b Month of December:

No. of Samples 4 4 4 4 Average Value: 67 c.1 <.1 7.9 Max.'Value 69 <.1 <.1 8.0 Min. Value . 66 <.1 <.1 7.7 Limits Exceeded: 0 0 0 0 1

Page 14 of 15

- , en, ,,.-we e,-,-r , - - - - . . - - - - - - - . - - - - -- a,.,

l QUARTERLY OPERATIONAL MONITORING REPORT Georgia. Power Company From: 10-01-93 Plant E.I. Hatch To: 12-31-93 P.O. Box 4545 Atlanta, Georgia 30302 Permit Number: GA0004120

. 1 I

I certify under the penalty of law that this document and all '

I attachments were' prepared under my direction or supervision in accordance l l

i with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.- Based on my inquiry of the- l i

person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am' aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations. ,

f

-6'M L .['79v/dV H. L. Sumner, Jr.

General Manager Nuclear Plant 3

Page 15 of 15 l

4

,,w-, . , .- , , . , , - ., .-m., +, .s--, ,

r -1 ATTACliMENT 3 EDWIN 1. IIATCII NUCLEAR PLANT - UNITS 1 AND 2 1993 FLOW MONITORING AND CIIARACTERIZATION STUDY j

IIL-4537 ENV-94-067 Edeln L llatch Nuclear Plants - Units 1 and 2 NRC DocLets SS 321,50.%6 Operating IJcenses DPR-57, NPF-5 Annual Envin>nmental Surveillance Report j l

l I

3$5de rN AYe e AUama, Georg63 30208

' Telephone 404 526 f,526 Mawg Access Fest o't.ce Oca 4545 A::ama Georgia 30302 L Georgia Power

5. D. Holdee the 50at'trn e ect? c 5is'ea Manager ,

Ucens.ng ano comonance January 6, 1994 NPDES PERMIT REOUIREMENTS Flow Monitoring and Characterization Studies Annual Priority Pollutant Certification Mr. Lawrence W. Hedges Georgia Environmental Protection Division Industrial Wastewater Program 205 Butler Street, S.E., Suite 1070 Atlanta, GA 30334

Dear Mr. Hedges:

As required by the following NPDES Permits, attached are the Flow Monitoring and Characterization Studies for the referenced plants:

Plant Arkwright NPDES Permit No. GA0026069 Plant Bowen NPDES Permit No. GA0001449 Plant Branch NPDES Permit No. GA0026051 Plant Hammond NPDES Permit No. GA0001457 Plant Hatch NPDES Permit No. GA0004120 Plant McDonough/Atkinson NPDES Permit No. GA0001431 Plant Mitchell NPDES Permit No. GA0001465 Plant Scherer NPDES Permit No. GA0035564 Plant Vogtle NPDES Permit No. GA0026786 Plant Wansley NPDES Permit No. GA0026778 Plant Yates NPDES Permit No. GA0001473 In accordance with the provisions of the following NPDES pcrmits, Georgia Power Company certifies that no priority pollutants, other than chromium or zinc, are present in detectable amounts in the cooling water discharges of the referenced plants. This certification is based on the manufacturer's certification for their products and applies to pollutants present as a result of their presence in water treatment chemicals added by Georgia Power Company and not their presence in raw water supplies.

Plant Bowen NPDES Permit No. GA0001449 Plant Hatch NPDES Permit No.sGA0004120 Plant Scherer NPDESPermitSofyDA0035564 Plant Vogtle NPDES Permit Nye GA0026786 Plant Wansley NPDES Permit NbJ CA0026778 Plant Yates NPDES Permit No. GA0001473

Georgia Power d If you have questions or require additional information, please contact floward Shelnutt at 526-7058.

Sincerely,

./

S. D. Ilolder hls INIh

Page 1 or 9 GEORGIA POWER COMPANY PLANT E.I..HAIGH i

NPDES FLOW CHARACTERIZATION STUDY 'I 1993 INTRODUCTION ,

This flow study was performed in accordance with Par,t III, Section B.9, of the Georgia Power Company, E.I. Hatch Nuclear Generating Facility, National Pollutant Discharge Elimination System, (HPDES), Permit No. GA 0004120; issued by the State of Georgia, Department of natural Resources, Environmental Protection Division, on December 1, 1992.

BACKGROUND This study was conducted on the NPDES permitted waste streams using data collected during the time period of July 6 to July 19, 1993. A description of the waste streams are as follows:

1. NON-CONTACT COOLING This system consisted of discharges from the Plant Auxiliary Heat Exchangers and the Diesel Generator Cooling.

The Plant Auxiliary cooling Systems consisted of heat exchangers located in the control, radwaste, reactor, turbine and waste gas buildings. This system was supplied by the plant service water system and discharges into the circulating water system (cooling towers) to provide make-up water. Flow rates were calculated using pump name plate data.

The diesel generator cooling water system was supplied by the plant ~

service water system and discharges to the discharge structurc mixing chamber via the radwaste discharge line. This system was used for cooling the emergency diesel generators. The' diesel generators for Unit One, (lA and 1C), normally had a continuous flow of cooling water regardless of their operational status. Unit One's diesel generator-(IB) and Unit Two's diesel generators, (2A and 2C), were supplied with cooling water only during system operation; which consisted of testing and emergencies. Flow rates and measurements were calculated using pump name plate data.

2. LOW VOLUME WASTE (NEUTRALIZATION TANK) O1G This waste stream consisted of domineralizer regeneration waste composed of sulfuric acid, sodium ' hydroxide and rinse water. All regenerative waste was collected in a sump'and recirculated into a 38,000 gallon aboveground tank until the pH was between 6 and 9. The neutralization tank was. discharged via gravity into the Unit one mixing chamber. The maximum flow rate achievable was calculated using-the volume of the tank and the radius of the discharge pipe. The daily average flow rate was calculated by dividing the total volume discharged by the total minutes in the test period. The flow rate measurements of this system were based on its calculated maximum flow rates and discharge duration.

i

Page 2 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH

. NPDES FLOW CHARACTERIZATION STUDY 1993

3. LOW VOLUME WASTE (PRESSURE FILTER BACKWASH) OlH This vaste stream consisted of backwash water originating from four pressure sand filters that preceded the domineralizer unit. The backwash waste gravity drained into the neutralization tank discharge line. The maximum flow rate ' achievable was based on thebackwash pump name plate data. The daily average flow rate was calculated by using backwash flow rate data and operating times during the test period. The flow rate measurements of this system were based on flow indicators for each pressure filter.
4. COOLING TOWER BLOWDOWN (UNIT ONE) OlA This waste stream consisted of discharges from the Unit One

' closed-loop circulating water system. Make-up water for this system was derived from non-contact auxiliary plant cooling water. The discharge originated at the circulating water pumps discharge and was routed to the Unit One mixing chamber. The maximum flow rate achievable was based on the total pumping capacity of the plant service water system. The daily average flow rate was calculated using the difference between the Unit One mixing chamber flow rates and the other Unit One waste streams. The flow rate measurements of this system were based on mathematical computations relating this waste stream to all the others that were applicable.

5. COOLING TOWER BLOWDOWN (UNIT TWO) 02A This waste stream consisted of discharges from the Unit Two closed-loop circulating water system. Make-up water for this system was derived from the non-centact auxiliary plant cooling water. The discharge originated at the circulating water pumps discharge and was routed to the Unit Two mixing chamber. The maximum flow rate  !

achievable was based on the total pumping capacity of the plant service water system. The daily average flow rate was calculated using the difference between the Unit Two mixing chamber flow rates I and the other Unit Two waste streams. The flow rate measurements of this system were based on mathematical computations relating this waste stream to all the others that were applicable, i

6. COOLING WATER OVERFLOW (UNIT ONE) 01B This waste stream consisted of discharges from the closed-loop circulating water system. Make-up water for the system originated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit One cooling tower flume and was routed to the Unit one mixing chamber. The maximum flow rate achievable was based on the total pumping capacity of the plant service water system. The daily average flow rate was calculated by dividing the total gallons discharged by the total minutes in the tent period. The flow rate measurements of this stream were based on the best conservative estimate at the time of subsequent l discharge.

NOTE: This vaste stream was permitted for use in lieu of outfall 1 number OlA.

l

. . . - = - . - ~ .

POge 3 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993

7. COOLING WATER OVERFLOW TO STORM DRAINS (UNIT ONE) 01J This waste stream. consisted of discharges from the closed-loop circulating water system. Make-up water for the system originated from the non-contact auxiliary plant ' cooling water system. The discharge originated at the Unit One cooling tower basins and was routed to storm drains, then to the river. The maximum flow rate achievable was based on the total pumping capacity of the plantservice water system. The daily average flow rate was calculated by dividing the total gallons discharged by the total minutes in the test period. The flow rate measurements of this stream were based on the best conservative estimate at the time of subsequent discharge.

NOTE: This waste stream was permitted for use in lieu of outfall number 01A.

8. COOLING TOWER BASIN DRAINS (UNIT ONE) 01I This waste stream consisted of discharges from the closed-loop circulating water system. Make-up water for the system originated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit One cooling tower basins and was routed to storm drains, then to the river. The maximum flow rate achievabic was bared on the total pumping capacity of the plant service water system. The daily average flow rate was calculated by dividing the total gallons discharged by the total minutes in the test period. The flow rate measurements of this stream were based on the best conservative estimate at the time of subsequent discharge.

NOTE: This waste stream was permitted for use in lieu of outfall number 01A.

9. COOLING WATER OVERFLOW TO STORM DRAINS (UNIT TWO) 02B
This waste stream consisted of discharges from the closed-loop circulating water system. Make-up water for the system originated from the non-contact auxiliary plant cooling water system. .The discharge originated at the Unit Two cooling tower basins and was routed to storm drains, then to the river. The maximum flow rate achievable was based on the total pumping capacity of the plant service water system. The daily average flow rate was calculated by dividing the total gallons discharged by the total minutes in the test period. The flow rate measurements of this stream were based the best conservative estimate at the time of subsequent on discharge.

NOTE: This waste stream was permitted for use in lieu of outfall

, number 02A.

I

Page 4 of 9 GEORGI A POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993

10. COOLING WATER OVERFLOW (UNIT TWO) 02C This waste stream. consisted of discharges from the closed-loop circulating water system Make-up water for the system originated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit Two cooling tower flume and was routed to the Unit Two mixing chamber. The maximum flow rate achievable was based on the total pumping capacity of the plant service water system. The daily average flow rate was calculated by dividing the total . gallons discharged by the total minutes in the test period. The flow rate measurements of this stream were based on the best conservative estimate at the time of subsequent discharge.

4 NOTE: This waste stream was permitted for use in lieu of outfall-number 02A.

11. LOW VOLUME WASTE (LIQUID RADWASTE SYSTEM, UNIT ONE) 01E This waste stream consisted of waste water generated primarily in the reactor and turbine buildings. Examples of the waste water sourens were floor drains, laundry drains, laboratory drains, seal cooling waters and bearing cooling waters. The collective waste was filtered and domineralized then discharged to the Unit One mixing chamber or reused in-plant depending on the chemical and radiological quality. the maximum flow rate achievable was derived from the pump name plate data. The average daily flow was calculated by dividing the total volume discharged by the total minutes in the test period. The flow rate measurements of this stream were based on integrator readings and discharge duration.
12. LOW VOLUME WASTE (LIQUID RADWASTE SYSTEM, UNIT TWO) 02E This waste stream consisted of waste water generated primarily in the reactor and turbine buildings. Examples of the waste water sources were floor drains, laboratory drains, seal cooling waters and bearing cooling waters. The collective waste was filtered and demineralized, then discharged to the Unit Two mixing chamber or reused in-plant depending on the chemical and radiological quality.  ;

The maximum flow rate achievable was derived from the pump name -i plate data. The average daily flow was calculated by dividing the '

total volume discharged by the total minutes in the test period, j The flow rate measurements of this stream were based on integrator l readings and discharge duration. l 1

13. COMBINED WASTE STREAMS (UNIT ONE) 01 l This waste stream consisted of the total volume of all liquid waste being discharged from Unit One. The maximum flow rate was achieved i using the total surface water pumping capacity on plant site. -The j daily average discharge was calculated from the Unit One daily discharge flow rates during the test period. The flow rate measurements were based on readings obtained from flow rate strip charts.

l l

Page 5 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993

14. COMBINED WASTE STREAMS (UNIT TWO) 02 This waste stream consisted of the total volume of all liquid waste being discharged from Unit Two. The maximum flow rate was achieved using the total surface water pumping capacity on plant site. The daily average discharge was calculated from the Unit Two daily discharge flow rates during the test period. The flow rate measurements were. based on readings obtained from flow rate strip charts.
15. INTAKE SCREEN BACKWASH 03 This waste stream consisted of river water being used continuously to backwash the plant's traveling water intake screen. The river 4 water used to backwash the intake screen was gravity fed back to the river. The intake screens are backwashed approximately once per shift ( dependent on DP ). This flow rate'was estimated using pump plate data.
16. INTAKE STRAINER BACKWASH 03A This waste stream consisted of river water being used periodically to backwash the plant's intake pump's strainers. The river water used to backwash the intake strainers was fed back to the river via the stillwell associated with the intake. The intake strainers are backwashed approximately once per shift ( dependent on DP ). This flow rate was estimated using pump plate data.

17, 2P65 CHILLER WATER BLOWDOWN 04 This vaste stream consisted of discharges from the Unit Two Reactor Building and the Radwaste Building closed-loop circulating water systems. Make-up water for this system originated from the plant sanitary water system. The maximum flow rate achievable was calculated using the pump name plate data. The daily average flow rate was calculated by dividing the total gallons of water discharged by the total minutes in the test period. The flow rate measurements were based on engineering data reviews.

18. SEWAGE TREATMENT EFFLUENT 01F This vaste stream consisted of the plant domestic sewage waste that was created by two aeration package treatment plants. Discharge from this facility was routed to the Unit one mixing chamber. The maximum flow rate achievable was calculated using the designed capacity of the aeration plants. The daily average flow rate was calculated by dividing the total gallons of water discharged by the total minutes in the test period. The flow rate measurements were based on readings obtained from a flow rate strip chart.

1 l

_ _ ~ . _ ___ _ __ _ __ _ .__ _ .._. _

,m Page 6 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH

~

NPDES FLOW CHARACTERIZATION STUDY 1993 TABLE OUTFALL NUMBER AND NAME . MAXIMUM (comi_ DAILY / AVG (comi Non-Contact Cooling Water 3,500 1,403 (a)

(Diesel Generator Cooling)

Non-Contact Cooling Water 68,000 45,000 (1)

(Plant Auxiliary Systems) 01G Low Volume. Waste 650 10 (b)-

(Neutralization Tank) 01H Eow Volume Waste 1,050 2 (c)

(Pressure Filter Backwash) 01A Cooling Tower Blowdown 34,000 (f) 1,229 (Unit One) 02A Cooling Tower Blowdown 34,000 (f) 912 (Unit Two) 01B Cooling Water Overflow 34,000 (f) 0 (Unit One) 01J Cooling Water Overflow 34,000 (f) O to Storm Drains (Unit One)

O1I Cooling Tower Basin 34,000 (f) 0 Drains (Unit One) 02B Cooling Tower Overflow 34,000 (f) O to Storm Drains (Unit Two) 02C Cooling Water Overflow 34,000 (f) 0 (Unit.Two) 01E Low Volume Waste, Liquid 100 10 (d)

Radwaste (Unit One) 02E Low Volume Waste, Liquid 100- 9 (e)'

Radwaste (Unit Two) 01 Combined Plant Waste 50,000 18,643 Streams (Unit One) 02 Combined Plant Waste 50,000 12,786-Steams (Unit Two) 4 4

Page 7 of 9.

GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993 TAEE MAXIMUM (comi DAILY /Ayg OUTFALL NUMBER AND NAME .

.(.9El01 500 412 (g) 03 Intake Screen Backwash 500 412 (g) 03A Intake' Strainer Backwash 04 2P65 Chiller Water Blowdown 500 5 (h) 01F Sewage Treatment Plant 50 17 x -. . _. __ _

Page 8'of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993 FOOTNOTES i '(a) The daily average flow rate for cooling water for the diesel generators 1,400 gpm. However, during the flow study test period, the diesels operated only 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, (b) During the sample period, 216,000 gallons were discharged in 6 batches.

1 (c) Actual backwash time during the two week period was 40 minutes at a rate of 710 gpm and 40 minutes at a rate.of 250 gpm.

.(d) turing the sample period, 231,462 gallons of waste water were discharged from the Unit One mixing chamber in 31 batcaes.

(c) During the sample period, 236,762 gallons of waste water were discharged from the Unit Two mixing chamber in 26 batches.

(f) This figure reflects the total' surface water withdrawal capabilities 9

at the plant consisting of service water capacity of 68,000 gpm and residual heat removal (RHR) piping capacity of 16,000 gpm. RHR is used primarily during' plant shutdown.

(g) Under normal operating

  • conditions, the Intake Screen Backwash and Intake Strainer Backwash discharges at a daily average rate of 412 gpm.

(h) Under normal. operating conditions, the 2P65 Chiller Water Blowdown discharges at a daily average rate of 5 gpm.

(1) Under normal operating conditions, the Unit One Plant Auxiliary System uses approximately 22,000 gpm and under normal operating conditions, the Unit Two plant Auxiliary System uses approximately 21,250 gpm.

4 4

b j Page 9 of.9 9XO.lG_JA POWER COMPANY PLANT E.I. HAT.Cli NPDES FLOW CllARACTERIZATION STUDY

' 1993

' WATER TREATMENT CllEMICAL INVENTORY This is a list of the chemicals used at Plant Edwin I. Hatch for the purpose of water treatment:

1. AC 3323 ( scale & corrosion inhibitor )
2. Borax ,
3. Boric Acid
4. Orthophosphate ( Ancool 3213, ALS-34s-220 )

l

5. Calgon 11-64 0
6. Calgon 11-300
7. Sanuril 115 (Calcium liypochlorite)
8. Sodium Hydroxide
9. Sodium liypochlorite ( MLP30 GAL )

' 10 . Sodium Nitrite ( Ancool 3733,3735,3730 )

11. Sodium Pentaborate
12. Sulfuric Acid (_SA230 GAL )

1 d

n d

E T f 1" n-- --m3 . , , , _