Tech Spec Change Request 25 Re Tech Spec 3.7 & 4.7,revising Basis for Secondary Water Chemistry Spec
ML19319D078
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/17/1978
From:
FLORIDA POWER CORP.
To:
Shared Package
ML19319D073 List:
References
TAC-08889, TAC-8889, NUDOCS 8003050865
Download: ML19319D078 (5)


Text

-

M _

V .

Technical Specification Change Recuest No. 25 (Appendix A)

Replace page 3/4 7-11, 7-12, B3/4 7-3 with the attached revised pages 3/4 7-11, 7-12, B 3/4 7-3.

Proposed Change Revise the Basis for the Secondary Water Chemistry Specification per the attached, revised pages.

Reason for Change A test program was conducted at Crystal River Unit 3 during approximately the first 6 months followirg initial criticality. This program was an extension of the preoperational program and it encompassed the program presently described in the Basis for the Secondary Water Chemistry Specification.

Toward the end of the test period, it was becoming apparent to the industry that steam turbine disc cracking as well as steam generator tube failures were a result of unknown mechanisms between the discs / tubes and the secondary water.

In order to correlate secondary water chemistry to these failures, the Electric Power Research Institute (EPRI) is backing Nuclear Water & Waste Technology (NWT) in a study of the secondary cycle chemistry of pressurized water reactors having once-through steam generators (Study No. PR-704-1).

A description of this study as well as a milestone chart is attached. The benefits of this program will be:

1) Operational comparison of four Babcock & Wilcox reactors, having important design and control differences in their secondary cycles.
2) Independent review of CR-3 sampling and analytical capabilities.
3) Correlation of operational chemistry control data to condenser leakage, polisher performance, chemical treatment dosage, and steam generator / turbine corrosion / deposition rates.
4) Availability of operational experience to interested electric utilities and EPRI via quarterly recorts.

Considering the history of steam generator tube failures, recent turbine disc cracking and the probability of improving present control strategies, it is proposed that this study replace the study in the Tech Specs as the l basis for the Secondary Water Chemistry Specification. I As can be seen on the milestone chart, the program is scheduled to run till the end of 1979, at which time, the results will be submitted to the Comission. In the meantime, Secondary Water Chemistry will be maintained within B&W specified limits (See Attached table).  ;

Safety Analysis Justifying Procosed Change l None of the requirements applicable to the Safety Analysis are diminished by the proposed changes and no unreviewed safety question is involved.

R 0 0 3 0 5f9 N I

. . ~

While the original test program identified chemical constituents and concentration phenomena at various points in the secondary cycle, the lack of correlation to actual plant operations was detrimental in attempting to specifylimits on parameters and frequencies for monitoring.

The continuation of.the use of vendor specified limits on parameters and

-frequencies of monitoring is sufficient to ensure the integrity of the 4 secondary system until the proposed study is completed and the result can be instituted.

9 4

J ,

] -

n . TABLE 3.7-2 -

3' Yi . .

j!" . SECONDARY-WATER CHEMISTRY LIMITS- ,

2 9.

~ Water Sample-

! s Loca tion Parameters

  • C 5

w-

.W 1

}-

xu.

N e

4 1

I~

  • Sample. locations, parameters and . limits to be established based upon test program described in b'ases.

i ,

1 e

. _ . ~ ,

. , .- .. -. . - . . . . . - . .~ . ..

w-- TABLE 4.7-3

.5'

$ SEC0llDARY' WATER CilEMISTRY SURVEILLANCE REQUIREMENTS

.:o -

q Water sample

.g Location Parameters

  • E

'G~ . .

m / 1 4

1 M

n

? .

.M J

4 4

  • Sample locations, parameters and frequencies to be established based upon test pro 9 ram described in bases.

1

--_-- __ _ .____ ______ _ __ _ _ __ _ _ _ . . ._ 3 g ,, _ ~ ~ ^ ;* -

ti , AP

, PLANTSYSTEMS BASES positive reactivity effects of the Reactor Coolant System cooldown associated with the blowdown, and 2) limit the pressure rise within containment in the event the steam line rupture occurs within contain-ment. The OPERABILITY of the main steam isolation valves within the closure times of the surveillance requirements are consistent with the assumptions used in the safety analyses.

3/4.7.1.6 SECONDARY WATER CHEMISTRY A test program will be conducted during 1978 and 1979 to establish the appropriate limits on the secondary water chemistry parameters and to determine the appropriate frequencies for monitoring these parameters.

The results of this test program will be submitted to the Comission for review. The Commission will then issue a revision to this specification specifying the limits on the parameters and the frequencies for monitoring these parameters.

The test program will include an analysis of normal plant chemistry in-cluding background chemistry, present chemistry follow, and corrosion product hardness follow. Inleakage chemistry will be looked at by chloride follow, sodium follow, sulfate silica follow, modeling, resin throw, and turbine sampling. The chloride follow 'or example will consist of four intensive two-week studies and two extended four month.

studies. The intensive studies will sample the secondary water, low and high pressure steam, moisture separator drains, and demineralizer inlets and outlets. The extended studies will compare three groups of samplings for six weeks each. The sampling groups are: (1) secordary water, low and high pressure steam, and moisture separator drains; (2) secondary water, demineralizer inlets and outlets and low pressure steam; and (3) low pressure steam, low pressure turbine drains A and B, and condensate.

3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION The limitation on steam generator pressure and temperature ensures that the pressure induced stresses in the steam generators do not exceed the maximum allowable fracture toughness stress limits. The limitations of 110'F and 237 psig are based on a steam generator RT NDT f 40*F and are sufficient to prevent brittle fracture.

3/4.7.3 CLOSED CYCLE COOLING WATER SYSTEMS The OPERABILITY of the closed cycle cooling water system ensures that sufficient cooling capacity is available for continued operation of safety related equipment during normal and accident conditions. The redundant cooling capacity of this system, assuming a single failure, is consistent with the assumptions used in the safety analyses.

CRYSTAL RIVER - Unit # 3 B 3/4 7-3