05000266/LER-1980-007-01, /01T-0:on 800611,blue Instrument Bus 1Y02 Was de-energized,resulting in de-energization of 3 Containment Pressure Channels.Caused by Personnel Error.Power Restored & Instrumentation Returned to Normal

From kanterella
(Redirected from ML19318C388)
Jump to navigation Jump to search
/01T-0:on 800611,blue Instrument Bus 1Y02 Was de-energized,resulting in de-energization of 3 Containment Pressure Channels.Caused by Personnel Error.Power Restored & Instrumentation Returned to Normal
ML19318C388
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/25/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19318C377 List:
References
LER-80-007-01T, LER-80-7-1T, NUDOCS 8007010420
Download: ML19318C388 (2)


LER-1980-007, /01T-0:on 800611,blue Instrument Bus 1Y02 Was de-energized,resulting in de-energization of 3 Containment Pressure Channels.Caused by Personnel Error.Power Restored & Instrumentation Returned to Normal
Event date:
Report date:
2661980007R01 - NRC Website

text

g 17 77)

LICENSEE EVENT REPORT y

CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

M lW!.TlPlBlHl 1 l@l 0 l0 l-l 0 l0 l0 l010 l -1010 l@l4 l1 l1 l1 Il l@l I

l@

i 8 9 LICENSEE CODE 14 16 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T 1011l 3$"ce' l L l@l 0 l 5101010121616 @l 0161111 l 810 l@l 0 l 6 l 2 l 5 l 8 l 0l@

8-60 61 DOCK ET NUMBER 68 69 EVENT DATE 74 7S REPORT DATE 80 EVENT DESC91pTION AND PROBABLE CONSEQUENCES h t o 121 l During aormal operation, at 1141 hours0.0132 days <br />0.317 hours <br />0.00189 weeks <br />4.341505e-4 months <br /> on 06-11-80, the blue instru-I

  1. 0l3l l ment bus (lYO2) was deenergized because of personnel error.

Loss of l

1OI*II power to this bus resulted in deenergization of two of the Unit 1 con-l lOlsii tainment pressure channels (P947 and P948) and one of the Unit 2 con-l l0lsiI tainment pressure channels' (P949).

This reduced the minimum degree of l Io1itI redundancy than that required by Technical Specifications for contain-l [Ola!I ment spray and is reportable IAW Technical Specification 13.6.9.2.A.2.

l 7

8 9 80 DE CODE SUSC E COMPONENT CODE SU8 COO'E SU E

10191 l ElB l@ W@ l Cl@ l Zl ZlZ lZ lZ lZ l@ lZ l@ @ @

7 8

9 10 11 12 13 18 19 20 SEOL%NTIAL OCCURRENCE REPOAT REVISION LE A 'RO EVENT YE AR R EPC9 T NO.

CODE TYPE NO.

O57yug 18 l 0 l l-l l0l0l7l [f_]

l0l1l lT l l-l y

at

_ 21 22 2J 24 26 27 28 29 Jo 31 32 TAKEN A TION ON PLANT VET HOURS 22 SB i FOR 8.

SUPPLIER MANUFACTURER l H lgWg Wg l36Cl@ l 0 l0 l0 l l gg l N lg gg l WlI l 2 l 0 lg 33 J4 JS 3/

40 48 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i j o l l An electrician deenergizing the wrong power st oply for maintenance I

lililIcaused the event.

Power was restored to the bus within about one l

,,,,il minute and all instrumentation switched back to its normal supply bus l

g l within five minutes for both units.

1 i 4 l

l 7

8 9 80 STA S

% POWER OTHER STATUS Di RY DISCOVERY DESCRIPTION u,j s_] LE_J@ l o I 810 l@l N/A l

l A l@l Operator observation l

l ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE

@ [Z_,j@l N/A l

l N/A l

1 6 PERSONNEL EXPOS ES NUM8ER TYPE

DESCRIPTION

ITTTl l 010 l O l@lZ l@l N/A l

i

' PERSONNEt iNau'R'iES NUMBER OESCRIPTIOd l 010 l 0 l@l N/A l

i R 7

8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY TYPE

DESCRIPTION

LZJ@lN/A I

' 9 7

8 9 to 80 N/A l

lllllllllllllj 13,J.OJ LN]E @lDE CRIPTION ISSU

}

7 8 9 10 68 69 80 3 C. W.

Fay 414/277-2811 2

8 0 0 7 0 10"$"'"*"'"

e.

ATTACHMENT TO LICENSEE EVENT REPORT 80-007/0lT-0 Wisconsin ElecP.ric Power Company Point Beach Nuclear Plant Unit 1 Docket No. 50-266 During normal operation, at 1141 hours0.0132 days <br />0.317 hours <br />0.00189 weeks <br />4.341505e-4 months <br /> on 06-11-80, the blue instrument bus (lYO2) was deenergized because of personnel error.

The loss of power to this bus resulted in the deener-gization of two of the Unit 1 containment pressure channels (P947 and P948) and one of the Unit 2 containment pressure channels (P949).

Containment pressure which controls the auto-matic containment spray function is a safeguards function which does not fail in the trip position on a loss of power.

This reduced the minimum degree of redundancy to less than that required by Technical Specifications for containment spray and is reportable in accordance with Technical Specification 15.6.9.2.A.2.

~

An electrician deenergizing the wrong pcwer supply for maintenance caused the event.

Power was restored to the bus l

within about one minute and all instrumentation switched back to its normal supply bus within five minutes for both units.

As a result of this momentary power loss to the blue bus, compounded by steam generator feed regulator valve problems, Unit 1 tripped because of feed flow / steam flow mismatch and steam generator low level.

All systems functioned normally after the trip and the unit was placed back on line approxi-mately two hours later at 1352 hours0.0156 days <br />0.376 hours <br />0.00224 weeks <br />5.14436e-4 months <br />.

This event has been dis:ussed with plant group heads, operating, and maintenance personnel to emphasize the importance of-properly identifying equipment prior to removing from service.

Additional administrative controls are being discussed to prevent recurrence of this type of event.