05000301/LER-1980-005, Forwards LER 80-005/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 80-005/03L-0
ML19320A967
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/27/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19320A968 List:
References
FOIA-81-159 NUDOCS 8007080381
Download: ML19320A967 (1)


LER-1980-005, Forwards LER 80-005/03L-0
Event date:
Report date:
3011980005R00 - NRC Website

text

MdJ 4

~

Wisconsin Electnc mea cwmr 231 W. MICHIGAN, P.O. BOX 2046 MILWAUKEE, WI 53201 June 27, 1980 Mr. J.

G. Keppler, Regional Director Office of Inspection and Enforcement, Region III U.

S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET NO. 50-301 POINT BEACH NUCLEAR PLANT UNIT 2 LICENSEE EVENT REPORT NO. 80-005/03L-0 Enclosed is Licensee Event Report No. 80-005/03L-0 with an attachment which provides a description of an event reportable in accordance with Technical Specification 15.6.9.2.B.3,

" Observed inadequacies in the implementation of administrative or procedural controls which threaten to cause reduction of degree of redundancy provided in reactor protection systems or engineerca safety feature systems."

This event was originally reported in accordance with Technical Specification 15.6.9.2.A.6 and immediate notification per the " red phone" was made.

After completing a thorough investi-gation of the event and its impact, it has been determined that the event did not require either a 24-hour written notification or " red phone" notification.

Very truly yours, C. W.

Fay, Director Nuclear Power Department l

Enclosure Copy to NRC Resident Inspector -

Point Beach Nuclear Plant h

8007080 N/