NPL-97-0565, LER 97-S02-00:on 970815,perimeter Zones,Doors & Cameras Were Lost.Caused by Inadequate Compensatory Measures Taken for Failed Multiplexer.Repaired Mux for e-field Zone 815 September 1997LER 97-S02-00:on 970815,perimeter Zones,Doors & Cameras Were Lost.Caused by Inadequate Compensatory Measures Taken for Failed Multiplexer.Repaired Mux for e-field Zone 8
NPL-97-0061, LER 97-S01-00:on 970204,compensatory Measures for Microwave Zones Had Not Been Implemented.Caused by Mgt Oversight of CAS & SAS Activities Was Inadequated.Addl Mgt Oversight of CAS & SAS Operations Has Been Implemented4 March 1997LER 97-S01-00:on 970204,compensatory Measures for Microwave Zones Had Not Been Implemented.Caused by Mgt Oversight of CAS & SAS Activities Was Inadequated.Addl Mgt Oversight of CAS & SAS Operations Has Been ImplementedHigh winds
05000266/LER-1993-00725 August 1993LER 93-007-00:on 930726,EDG Inadvertently Started and Station Battery Tripped Off Due to Undervoltage Signal. Caused by Blown Fuse as Result of Human Error During Calibr of 1A-06 Voltmeter.Fuse replaced.W/930825 Ltr
05000266/LER-1993-001, Revised LER 93-001-00:on 930107,all 4,160 Volt Degraded Grid Voltage Protection Channels Declared Inoperable Due to Discovery That Settings for Relays on Subj Channels Being Too Low.Plant Mods Will Be Made16 February 1993Revised LER 93-001-00:on 930107,all 4,160 Volt Degraded Grid Voltage Protection Channels Declared Inoperable Due to Discovery That Settings for Relays on Subj Channels Being Too Low.Plant Mods Will Be Made
05000266/LER-1992-004, Corrected LER 92-004-00:on 920515,determined That One Svc Water Pump & One Containment Ventilation Fan Sequenced Onto EDG More Times than Listed in Fsar,Section 8.2.3.Caused by Time Delay Relay Out of Tolerence.Evaluation Under9 July 1992Corrected LER 92-004-00:on 920515,determined That One Svc Water Pump & One Containment Ventilation Fan Sequenced Onto EDG More Times than Listed in Fsar,Section 8.2.3.Caused by Time Delay Relay Out of Tolerence.Evaluation Underway
ML20077R51814 August 1991LER 91-S01-00:on 910715,informed of Inadequate Preemployment Screening Process.Caused by Contractor Failure to Inform Util Employees Had Been Denied Access at Facility.Release & Authorization Form Revised
05000266/LER-1990-00618 July 1990LER 90-006-00:on 900619,nuclear Instrumentation Turbine Runback Occurred.Caused by Spurious Signal Believed to Have Been Negative Spike.Voltage Spike Considered Spurious. W/900718 Ltr
05000266/LER-1985-002, Forwards LER 85-002-01 Re Details of Fuel Damage Found on Fuel Assembly H14,which Spent Last Cycle in Core Position D12.Rept Suppls Original Rept19 May 1986Forwards LER 85-002-01 Re Details of Fuel Damage Found on Fuel Assembly H14,which Spent Last Cycle in Core Position D12.Rept Suppls Original ReptFuel cladding
ML20203L02825 April 1986Informs of Planned Site Visit to Obtain Info Supporting Implementation of Emergency Response Data Sys,Including Availability of PWR or BWR Parameters in Digital Form & Characterization of Available Data Feed PointsBackfit
05000266/LER-1982-009, Telecopy Message of LER 82-009/01T-0:on 821030,tubes in Steam Generators a & B Found W/More than 40% Degradation.On 821025,insp Revealed 5 Wet or Dripping Explosive Plugs.No Cause Stated.Tubes Plugged1 November 1982Telecopy Message of LER 82-009/01T-0:on 821030,tubes in Steam Generators a & B Found W/More than 40% Degradation.On 821025,insp Revealed 5 Wet or Dripping Explosive Plugs.No Cause Stated.Tubes Plugged
05000301/LER-1982-005, Updated LER 82-005/01T-1:on 820727,discovered 2 of 3 Level Instruments on C Boric Acid Storage Tank Powered from Common Source.Cause Not Determined Due to Poor Early Maint of Documents.Wiring Corrected28 September 1982Updated LER 82-005/01T-1:on 820727,discovered 2 of 3 Level Instruments on C Boric Acid Storage Tank Powered from Common Source.Cause Not Determined Due to Poor Early Maint of Documents.Wiring CorrectedBoric Acid
ML20147C27811 December 1978/03L on 781121:failure to Submit RO 50-366/78-55 W/In 30 Days.Caused by Deviation Rept 2-78-79 Not Received by Responsible Dept Head Nor Superintendent of Plant Engr Svcs.Personnel Were Reminded of Procedures
ML20062E65817 November 1978/01T-0 on 781106:turbine Runback Resulted from Safeguards Bus Tie Breaker Trip.Westinghouse Model CV-7 Undervoltage Relay on Tie Breaker Tripped Causing Breaker to Open.No Line Voltage Surges Detected
ML20064E86223 October 1978/01T-0 on 781009:snubber on Pressurizer Relief Line Was Found Inoperable.Grinnel Model HS-17,21/2 Inch X 5 Inch Bore & Stroke Snubber Failed for Undetermined Cause. Snubber Replaced & Surveillance Prog Expanded
ML20062D45313 October 1978/03L-0 on 780913:on 2 occasions,2 of 3 Charging Pumps Were isolated.2 3/4 Crosby Relief Valves Leaked Through Causing Temporary Loss of Charging Flow.Charging Pump Relief Valve Replaced & a Pump Returned to Svc
ML20062D46712 October 1978/01T-0 on 780928:reactor Coolant Sys Pressure Began Dropping at 25 Psi Per Minute;Pressurizer Spray Value 431B Found Partially Open Despite Shut Signal Due to 0 Set Point Drift Caused by Heat Degradation in Transducer
ML20062D32029 September 1978/1T-0 on 780928:reactor Coolant Sys Pressure; Dropped.Rate in Decrease Reached 25 Psig Per Minute. Pressure Decrease Caused by Failed elec-to-air Signal Converter