05000289/LER-1980-004, Forwards LER 80-004/01T-0

From kanterella
(Redirected from ML19305C062)
Jump to navigation Jump to search
Forwards LER 80-004/01T-0
ML19305C062
Person / Time
Site: Crane 
Issue date: 03/20/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19305C063 List:
References
TLL-120, NUDOCS 8003250538
Download: ML19305C062 (1)


LER-1980-004, Forwards LER 80-004/01T-0
Event date:
Report date:
2891980004R00 - NRC Website

text

--

g Metropolitan Edison Company F

h

.g -Q g,7 x,.y

Q' f (

Post Office Box 480 J

y awn w, -nm.m..

Middletown Pennsylvania 17057 717 9444041 wnter's Direct 0.a4 Nurneer March 20, 1980 TLL 120 Office of Inspection and Enforcement Attn:

B. H. Crier, Director Region I U. S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, Pa.

19406

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 LER 80-004/0lT-0 Attached please find Licensee Event Report (LER) 80-004/01T concerning the potential for exceeding code allowable stress in Decay Heat Removal System piping associated witn valves DH-V1 and DH-V2.

This event was initially reported to you for the DH-V2 piping via telecon on March 6, 1980 and in a telegram dated March 7, 1980.

In a subsequent phone call to D. R. Havercamp on March 11, 1980, we informed him that the event was also reportable for DH-V1.

We told him that we would not issue an additional telegram for DH-V1 and would expand the 14 day report to include the piping for both valves. He agreed with this approach.

This event is considered reportable under the requirements of Technical Specification 6.9.2.A(9).

Sincerely,

/s/ J.

C.

Herbein

'J. C. Herbein Vice President Nuclear Operations JCH:CFM: hah Attachments cc:

J. T. Collins Y%\\

P.'etreocuan Ed.sen Cemcary s a vemcer of me Gereral Puc9c u*t:es Sys'e"-

=

11.G.fUi 2 W.t' 5 36