| | | Reporting criterion |
|---|
| 05000289/LER-1997-001, Forwards Corrected Copy of LER 97-001-00 Re Condition Found During Review of GL 96-06 | Forwards Corrected Copy of LER 97-001-00 Re Condition Found During Review of GL 96-06 | |
| 05000289/LER-1997-001-02, :on 970117,potential Overpressurization of Piping Between Closed Reactor Building Containment Isolation Valves Occurred Due to Inadequate Design Code Guidance. Results of Review Will Be Documented.Pages 2 & 3 Corrected |
- on 970117,potential Overpressurization of Piping Between Closed Reactor Building Containment Isolation Valves Occurred Due to Inadequate Design Code Guidance. Results of Review Will Be Documented.Pages 2 & 3 Corrected
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-001-01, :on 970117,potential Overpressurization of Piping Between Closed Reactor Building Isolation Valves Occurred Due to Inadequate Design Code Guidance.Results of This Review Will Be Documented |
- on 970117,potential Overpressurization of Piping Between Closed Reactor Building Isolation Valves Occurred Due to Inadequate Design Code Guidance.Results of This Review Will Be Documented
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-002, :on 970129,potential Inability of Startup Feedwater Block Valves to Fully Close Following Main Steam Line Break Occurred Due to MOV Program Weakness.Increased Torque Switch Settings on Valve Operators |
- on 970129,potential Inability of Startup Feedwater Block Valves to Fully Close Following Main Steam Line Break Occurred Due to MOV Program Weakness.Increased Torque Switch Settings on Valve Operators
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-003-01, Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures | Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures | 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |
| 05000289/LER-1997-004, :on 970228,declared Auxiliary & Fuel Handling Bldg Ventilation Sys Inoperable.Cause Related to Wording in TS Bases & Fsar.All Sys Maint,Testing & Design Mods Performed |
- on 970228,declared Auxiliary & Fuel Handling Bldg Ventilation Sys Inoperable.Cause Related to Wording in TS Bases & Fsar.All Sys Maint,Testing & Design Mods Performed
| 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-005-01, :on 970410,declared motor-operated Reactor Bldg Purge Valves Inoperable Due to Inadequate Closing Torque. Caused by Deficient Design Analysis.Will Perform Evaluation of Valve Specific Seating Torque Test Data |
- on 970410,declared motor-operated Reactor Bldg Purge Valves Inoperable Due to Inadequate Closing Torque. Caused by Deficient Design Analysis.Will Perform Evaluation of Valve Specific Seating Torque Test Data
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-005, Has Been Cancelled | Has Been Cancelled | |
| 05000289/LER-1997-006-01, :on 970424,reactor Bldg Fan Motors Unqualified Cable Termination Occurred Due to Incorrect Engineering Guidance.Caused by Personnel Error.Qualifiable Repair of AH-E-1A Fan Motor Termination Was Installed on 970323 |
- on 970424,reactor Bldg Fan Motors Unqualified Cable Termination Occurred Due to Incorrect Engineering Guidance.Caused by Personnel Error.Qualifiable Repair of AH-E-1A Fan Motor Termination Was Installed on 970323
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-006, Forwards LER 97-006-00,resulting from Violation of TS 3.3 & Declaring Reactor Bldg fans,AH-E-1B & C,Inoperable on 970424 | Forwards LER 97-006-00,resulting from Violation of TS 3.3 & Declaring Reactor Bldg fans,AH-E-1B & C,Inoperable on 970424 | |
| 05000289/LER-1997-006-02, Re Unqualified Cable Terminations.Ler 97-006-00 Retracted | Re Unqualified Cable Terminations.Ler 97-006-00 Retracted | |
| 05000289/LER-1997-007, :on 970621,generator Output Breaker Failed Resulting in Loss of Offsite Power & Rt.Caused by Failure of Generator Breaker GB-102.Both Failed Breakers Were Replaced |
- on 970621,generator Output Breaker Failed Resulting in Loss of Offsite Power & Rt.Caused by Failure of Generator Breaker GB-102.Both Failed Breakers Were Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-008, :on 970621,power to Control Rod Drive Mechanisms Was Lost & Reactor Tripped.Caused by Long Trip Insertion Times at Tmi.Rods Were Trip Tested Per Surveillance Procedure 1303.11.1 |
- on 970621,power to Control Rod Drive Mechanisms Was Lost & Reactor Tripped.Caused by Long Trip Insertion Times at Tmi.Rods Were Trip Tested Per Surveillance Procedure 1303.11.1
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-009-01, :on 970725,engineering Analysis of Loss of a Train DC Power W/Loss of Offsite Power & LOCA Was Determined.Caused by Plant Designers Error.Trained Operators on Methodology to Regain Control of Es Equipment |
- on 970725,engineering Analysis of Loss of a Train DC Power W/Loss of Offsite Power & LOCA Was Determined.Caused by Plant Designers Error.Trained Operators on Methodology to Regain Control of Es Equipment
| 10 CFR 50.73(a)(2) 10 CFR 50.73(b)(2)(ii) |
| 05000289/LER-1997-009, Forwards LER 97-009-00,re Condition Which Was Evaluated & Determined to Be Reportable on 970725.Condition Was Identified as Result of Review of Crystal River 3 LER for Applicability at TMI-1 | Forwards LER 97-009-00,re Condition Which Was Evaluated & Determined to Be Reportable on 970725.Condition Was Identified as Result of Review of Crystal River 3 LER for Applicability at TMI-1 | |
| 05000289/LER-1997-010, Forwards LER 97-010-00,concerning Inoperable PORV Resulting from Violation of TS 4.2.2,in that,post-maintenance Test Was Not Performed on PORV Following Replacement During 11R Refueling | Forwards LER 97-010-00,concerning Inoperable PORV Resulting from Violation of TS 4.2.2,in that,post-maintenance Test Was Not Performed on PORV Following Replacement During 11R Refueling | |
| 05000289/LER-1997-010-01, :on 971012,PORV Inoperability Was Determined. Caused by mis-wiring & Failure to Perform post-maintenance Test Following Replacement During 11R Refueling Outage.Porv Replaced During 12R Refueling Outage Was Wired Correctly |
- on 971012,PORV Inoperability Was Determined. Caused by mis-wiring & Failure to Perform post-maintenance Test Following Replacement During 11R Refueling Outage.Porv Replaced During 12R Refueling Outage Was Wired Correctly
| 10 CFR 50.73(a)(2)(i) |