05000289/LER-1995-001, Forwards LER 95-001 Re Rc Leak Caused by Failure of Parker Hannifin Instrument Tube Compression Fitting That Was Found Inadequately Tightened
| ML20082E248 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/06/1995 |
| From: | Broughton T GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20082E253 | List:
|
| References | |
| C311-95-2165, NUDOCS 9504110159 | |
| Download: ML20082E248 (1) | |
| Event date: | |
|---|---|
| Report date: | |
| 2892095001R00 - NRC Website | |
text
y .
k .. ,
4 GPU Nuclear Corporation
- Nuclear m:ntr'"
Middletown, Pennsylvania 17057-0480 (717)944-7621 ,
Writer's Direct Dial Number: '
(717) 948-8005 .
April 6 1995 i C311-9fi-2165 ;
I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Dear Sir:
Subject:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 LER 95-001-00 1
The purpose of this letter is to transmit Licensee Event Report (LER) No.
95-001-00 regarding a reactor coolant leak caused by the failure of a Parker Hannifin instrument tube compression fitting that was found to have been inadequately tightened when the instrument was installed as part of a modification between 1984 and 1985. The leak was isolated and the plant continued to operate at full power throughout the event. The abstract provides a brief description of the event.
The event did not adversely affect the health and safety of the public.
Sincerely, MM T. G. Broughton b i Vice President and Director, TMI WGH Attachments cc: Administrator, Region I THI Senior Resident Inspector TMI Senior NRC Project Manager T T O O /f n 159 950406