October 25, 2019

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000395/2019012

Dear Mr. Stoddard:

On October 3, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station and discussed the results of this inspection with Mr. George Lippard III and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket No. 05000395 License No. NPF-12

Enclosure:

Inspection Report 05000395/2019012 w/Attachment: Supplemental Information

Inspection Report

Docket Number:

05000395

License Number:

NPF-12

Report Number:

05000395/2019012

Enterprise Identifier: I-2019-012-0013

Licensee:

Dominion Energy

Facility:

Virgil C. Summer Nuclear Station

Location:

Jenkinsville, SC

Inspection Dates:

September 16, 2019 to October 03, 2019

Inspectors:

P. Braaten, Reactor Inspector

E. Coffman, Senior Reactor Inspector (Lead Inspector)

J. Dymek, Reactor Inspector

M. Singletary, Reactor Inspector

Approved By:

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Virgil C. Summer Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status NOV 05000395/2017002-01 Closure of Previous NRC-identified SL-IV Cited Violation 71111.05XT Closed NOV 05000395/2016007-01 Closure of Previous NRC-identified SL-IV Cited Violation 71111.05XT Closed

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a)

The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

(1) Fire Zone CB06 - Control Building Relay Room (CB 436 ft)

Analyzed Circuits:

  • Pressurizer Backup Heaters
(2) Fire Zone AB01.04, Auxiliary Building General Area (AB 388 ft)

Analyzed Circuits:

  • Alternate Seal Injection (ASI) Pump XPP0230 Local Disconnect Switch
  • ASI Diesel Generator XEG0101 Local Disconnect Switch

'A' Component Cooling Water Booster Pump

  • LCV-115C-CS and LCV-115E-CS, Volume Control Tank Level Control Valves to Charging Pump Suction
(3) Fire Zone IB20, Intermediate Building 1DA 7.2kV Switchgear Room (IB 463 ft)

Analyzed Circuits:

  • 1DA 7.2kV Switchgear
  • Letdown Line Isolation Valves LCV-459-CS and LCV-460-CS
  • XPP0043A, 'A' Charging/Safety Injection Pump
  • 1DA2 480V Switchgear Bus, Unit 5C
  • XVG-8000A-RC, Pressurizer Power Operated Relief Valve Inlet Isolation Valve
(4) Fire Zone DG01.02, A Emergency Diesel Generator Room (DG 436 ft and 463 ft)

B.5.b Inspection Activities (IP Section 02.03) (1 Sample)

The inspectors evaluated the following B.5.b Mitigating Strategies:

(1) Refueling Water Storage Tank (RWST) make-up using fire service water

INSPECTION RESULTS

Observation: Closure of Two Previous NRC Identified SL-IV Cited Violations 71111.05XT The inspectors reviewed the licensees response to NOVs05000395/2016007-01 and 05000395/2017002-01 and determined that the reasons, corrective actions taken and plans to address recurrence, and the date when full compliance was achieved for these violations is adequately addressed and captured on the docket.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 3, 2019, the inspectors presented the triennial fire protection inspection results to Mr. George Lippard III and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05XT Calculations

43035-CALC-08

VC Summer NFPA 805 FRE Report

Rev. 3A

DC00070-008

BDBMG CST and RWST Flow Rate Calculations

Rev. 1A

DC00340-001

Fire PRA Final Report

Rev. 1A

DC00340-001

2

Fire PRA Fire Risk Quantization Report, Task 5.14

Rev. 0

DC00340-003

V.C. Summer NFPA 805 FRE Report

Rev. 3A

DC00340-007

Fire Human Reliability Analysis

Rev. 1A

DC0780D-001

NFPA Code of Record-Fire Detection

Rev. 2A

TR-08620-312

Nuclear Safety Capability Assessment Fire Shutdown

Analysis

Rev. 2

TR07800-007

Fire PRA Fire Ignition Frequency Analysis (Task 5.6)

Rev. 3

TR07800-008

Non-Power Operational Modes Transition Review

Rev. 1

TR07800-009

NFPA 805 and Fire PRA Circuit Analysis, Task 4.4

Rev. 1

TR07800-033

Fire Safety Analysis Report

Rev. 0A

TR08620-015

Nuclear Safety Equipment Report

Rev. 1

TR08620-034

Fire Response Abnormal Operating Procedures Technical

Basis Document

Rev. 1

TR08620-036

NFPA 805 Recovery Actions, Feasibility/Reliability Study

Rev. 1

TR08620-036

NFPA 805 Recovery Actions, Feasibility/Reliability Study

Rev. 2

Corrective Action

Documents

CR-16-05919

Corrective actions were not taken to resolve NRC-identified

severity level IV non-cited violation,05000395/2016001-01,

which resulted in a cited violation

11/23/2016

CR-16-06023

Receipt of NRC Problem and Identification Report

05000395/2016007

11/30/2016

CR-17-00537

Licensing Basis documentation associated with NFPA 805

2/01/2017

CR-17-04331

Receipt of Inspection Report 05000395/2017002 and NOV

08/09/2017

CR-17-04335

Corrective action(s) to restore compliance for the Oil

Collection Devices for Reactor Coolant Pump Motors

08/09/2017

CR-19-00607

Cable that supplies power to MVB03116C-SW has

KaoWool wrapped around its metal conduit for Fire

Protection.

2/15/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-19-02334

Use of data from an unapproved Flowserve Report in the

station's Fire PRA

06/27/2019

Corrective Action

Documents

Resulting from

Inspection

CR-19-03076

Discrepancies in the FP1AB-388 and FP1AB-388A fire pre-

plans

08/29/2019

CR-19-03342

Discrepancies in the FP1IB-412 fire pre-plan

09/19/2019

CR-19-03463

Total count for medium voltage HEAFs was incorrect for

Fire Area IB-20

09/30/2019

CR-19-03465

Total count for medium voltage HEAFs was incorrect for

Fire Area IB-20

09/30/2019

CR-19-03491

Fire hydrant FHHH #21 missing label

10/01/2019

Drawings

1MS-55-040

Low Pressure CO2 Fire Extinguishing System Schematic

Arrangement, Sheet 1

Rev. 4

1MS-55-040

Low Pressure CO2 Fire Extinguishing System Schematic

Arrangement, Sheet 3

Rev. 6

1MS-55-085

Diesel Generator Building/Diesel Fire Pump Room, Sheet

Rev. 14

B-023-311

Penetration Seal Typical Design, Wall and Floor Detail,

Sheet 1

Rev. 0

B-208-021-

CS0083A

Letdown Orifice Isolation XVT 8149A

Rev. 9

B-208-021-

CS0083B

Letdown Isolation Orifice Isolation XVT-8149A

Rev. 7

B-208-021-

CS0083C

Letdown Isolation Orifice Isolation XVT-8149A

Rev. 11

B-208-032-

EF0037B

EF Isolation From Turbine Driven PP to Steam Gen "A" IFV-

3536

Rev. 12

B-208-067-

MS0046

Main Steam to EFW Pump Turbine

Rev. 11

B-208-082-

RC0050

Pressure Power Relief Valve PCV 444B

Rev. 16

B-208-201-

SW0001

Electrical Elementary Diagram Service Water Pump A

Rev. 8

D-912-157

Building Service System Flow Diagram Intermediate

Rev. 12

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Building ESF SWGR

E-201-240

Electrical, Fire, Pressure and Radiation Barrier Details-Wall

and Floor Openings, Sheet 5

Rev. 7

E-206-005

Simplified Plant Electrical Distribution

Rev. 32

E-214-073

Arrangement of Cable Trays Auxiliary Building North Above

385-0 and 397-0

Rev. 5

E-221-650

Conduit Layout Fire Protection Auxiliary Building above El.

388' & 397'

Rev. 3

E-302-671

Chemical and Volume Control

Rev. 12

E-302-672

Chemical and Volume Control

Rev. 14

E-302-673

Chemical and Volume Control

Rev. 21

E-302-674

Chemical and Volume Control

Rev. 14

E-302-675

Chemical and Volume Control

Rev. 37

E-922-612

Building Service HVAC Control Complex Floor Elevation

436-0

Rev. 24

Engineering

Changes

ECR 50909

RCP Oil Lift Pump Enclosure

01/4/2018

Engineering

Evaluations

14-03

PRA Evaluation of Fire Procedure Time Estimates

Rev. 2

TR0780E-001

Safe Shutdown Separation Fire Protection Engineering

Equivalency Evaluations

Rev. 0A

TR0780E-005

Fire Protection Engineering Equivalency Evaluations

Rev. 0B

TR0780E-006

Fire Protection Equivalency Evaluation, Attachment FEAT-

Rev. 0H

Fire Plans

FP1AB-388

Auxiliary Building El. 388

Rev. 1

FP1AB-388A

Auxiliary Building El. 400

Rev. 1

FP1CB-436

Control Building El. 436

Rev. 1

FP1DG-436

Diesel Generator Building El. 436

Rev. 1

FP1DG-463

Diesel Generator Building El. 463

Rev. 1

FP1IB-412

Intermediate Building El. 412'

Rev. 2

FP1IB-463

Intermediate Building El. 463

Rev. 2

FP1IDX-001

Fire Preplan Index

Rev. 3

FP1LGD-001

Fire Preplan Legend

Rev. 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

Diesel Fire Pump Fuel Oil Storage Tank Sample Analysis

08/20/2019

1MS-54-418

Air Balance Inc. Submittal Data, U.L. Classified Fire

Seal/Fire Door Model 319W

10/28/1977

1MS-54-420

Air Balance Inc. Submittal Data, U.L. Classified Fire

Seal/Fire Door Model 119L

10/09/1978

1MS-54-425

Air Balance Fire/Seal Schedule

09/19/1978

1MS-54-429

S&R Products Electro-Thermal Link

10/25/1978

1MS-55-042

Relay Room CO2 Heat Collector, Cardox Corporation

Detect-A-Fire 140F, Stock No.150112

01/19/1978

1MS-94B-1717

Simplex Incipient Detection Equipment

Rev. 0

DBD-FP

NFPA 805 Fire Protection

Rev. 2

EE-02

Cable and Conduit Routing

Rev. 1H

EE-09

NFPA 805 Circuit Selection, Circuit Analysis, and Circuit

Routing

Rev. 0B

RC-18-0091

License Amendment Request - LAR-16-01490 NFPA 805

Program Revisions

08/28/2018

RC-18-0091

License Amendment Request to Revise NFPA 805 Program 08/29/2018

RCA 17-00537

Regulatory/Current License Basis Noncompliance

05/02/2019

VCS-TQP-0606

Fire Protection Training

Rev. 0C

WCAP-16175-P

Model for Failure of RCP Seals Given Loss of Seal Cooling

in CE NSSS Plants

01/2004

WCAP-16175-P-

A

Model for Failure of RCP Seals Given Loss of Seal Cooling

in CE NSSS Plants

03/2007

Procedures

AOP-900,

Appendix A

Operational Impacts of Loss of Electrical Buses Due to Fire

Rev. 1

AOP-900,

Appendix B

Post Fire Transition to Cold Shutdown - Other Potentially

Affected Components

Rev. 0

AOP-900,

Appendix C

Local Operator Actions

Rev. 1

AOP-900.01

Fire Response Initial Actions

Rev. 3

AOP-900.02

Control Room Evacuation Due to Fire

Rev. 2

AOP-900.04

Control Building Fire Zone Response Actions

Rev. 4

AOP-900.05

Intermediate Building Fire Zone Response Actions

Rev. 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AOP-900.06

Auxiliary Building and Fuel Handling Building Fire Zone

Response Actions

Rev. 1

AOP-900.10

Diesel Generator Fire Zone Response Actions

Rev. 0

BDMG-2.0

Beyond Design Basis Mitigating Guideline

Rev. 2

EC-03

Processing Engineering Change Packages

Rev. 6I

ES-0427

Program / Issue Screening

Rev. 3F

ES-0911

NFPA 805 - Fire Protection Monitoring Program

Rev. 0

FPP-020

Program Administration

Rev. 6E

FPP-022

Fire Prevention

Rev. 5A

FPP-024

Fire Suppression

Rev. 5

FSP-2.0

Flex Support Procedure - Alternate EFW Suction Source

Rev. 1

ICP-230.006

Incipient Detection Functional Check

Rev. 1

ICP-500.030

Incipient Detection Maintenance Procedure

Rev. 1A

OAP-100.6

Control Room Conduct and Control of Shift Activities

Rev. 4N

SAP-0131

Fire Protection Program

Rev. 10B

SAP-0142

Station Housekeeping Program

Rev. 17E

SAP-131A

Fire Protection Surveillances and Compensatory Measures

Rev. 4A

STP-128.012

NFPA 805 Required Fire Hydrant Inspection

Rev. 8

STP-128.021

Fire Service Water Flow Test

Rev. 11B

STP-128.024

CO2 System Functional Refuel Test

Rev. 10

STP-606.002

Fire Pump Diesel Engine Fuel Oil Storage Tank Oil Analysis Rev. 9D

STP-728.402

Fire Yard Hydrant Annual Inspection and Hydrostatic

Testing

Rev. 6

TR07870-019

Penetration Seal Design Guide

Rev. 0

VCS-ERP-0050

ERU Equipment Inventory

Rev. 4

VCS-ERP-0130

BDB Emergency Equipment Management

Rev. 0A

Self-Assessment

CR-19-00506

71111.05XT Triennial Fire Protection Self Assessment

04/12/2019

QA-AUD-2017-03 Fire Protection Audit Notification

01/31/2017

QA-AUD-201804

Fire Protection Annual

03/26/2018

QA-AUD-201903

Fire Protection Bi/Triennial

03/27/2019

Work Orders

1610548

CO2 System Functional Test

01/19/2017

1610897

Fire Hose Hydro Test

06/26/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1615983

DG Building Pre-Action Sprinkler Operability Test

07/25/2017

1615983

Diesel Generator Pre-action Sprinkler System OPS Testing

07/25/2017

1706346

ESF SWGR RM. 1DA Air Handling Unit XFD-0178

Inspection

01/02/2018

1714790

CO2 Valve Line-up Verification

01/31/2018

1800412

CO2 System Functional Test

05/24/2018

1801620

Intermediate Building El. 436-0 Simplex 4100 UT1B2

05/29/2018

1801620

Smoke Detector Functional Test

05/09/2019

1801625

Smoke Detection Functional Test

05/29/2018

1801625

Intermediate Building El. 436-0 Simplex 4100 UT1B2

05/29/2018

1801690

Fire Hose Visual Inspection

04/23/2018

1802465

Incipient Detection Surveillance

01/02/2019

1810811

CO2 Valve Line-up Verification

08/02/2018

1811319-001

DG Building Preaction Sprinkler Operability Test

01/15/2019

1812537-001

Control Room Evacuation Panel Emergency Tool Locker

Inventory List

06/29/2019

1816495

Relay Room Cooling, XFD-0016 Inspection

01/30/2019

1817412-001

IB Preaction Sprinkler System Operability Testing

2/14/2019

1904113-001

Smoke Detector Functional Test Zone N Control Building

448'

04/03/2019

1904467-001

Smoke Detector Functional Test Zone XX Control Building

448'

04/10/2019