October 25, 2019
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000395/2019012
Dear Mr. Stoddard:
On October 3, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station and discussed the results of this inspection with Mr. George Lippard III and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket No. 05000395 License No. NPF-12
Enclosure:
Inspection Report 05000395/2019012 w/Attachment: Supplemental Information
Inspection Report
Docket Number:
05000395
License Number:
Report Number:
Enterprise Identifier: I-2019-012-0013
Licensee:
Dominion Energy
Facility:
Virgil C. Summer Nuclear Station
Location:
Jenkinsville, SC
Inspection Dates:
September 16, 2019 to October 03, 2019
Inspectors:
P. Braaten, Reactor Inspector
E. Coffman, Senior Reactor Inspector (Lead Inspector)
J. Dymek, Reactor Inspector
M. Singletary, Reactor Inspector
Approved By:
Scott M. Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Virgil C. Summer Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status NOV 05000395/2017002-01 Closure of Previous NRC-identified SL-IV Cited Violation 71111.05XT Closed NOV 05000395/2016007-01 Closure of Previous NRC-identified SL-IV Cited Violation 71111.05XT Closed
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a)
The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:
- (1) Fire Zone CB06 - Control Building Relay Room (CB 436 ft)
Analyzed Circuits:
- Pressurizer Backup Heaters
- (2) Fire Zone AB01.04, Auxiliary Building General Area (AB 388 ft)
Analyzed Circuits:
- Alternate Seal Injection (ASI) Pump XPP0230 Local Disconnect Switch
- ASI Diesel Generator XEG0101 Local Disconnect Switch
'A' Component Cooling Water Booster Pump
- LCV-115C-CS and LCV-115E-CS, Volume Control Tank Level Control Valves to Charging Pump Suction
- (3) Fire Zone IB20, Intermediate Building 1DA 7.2kV Switchgear Room (IB 463 ft)
Analyzed Circuits:
- 1DA 7.2kV Switchgear
- Letdown Line Isolation Valves LCV-459-CS and LCV-460-CS
- XPP0043A, 'A' Charging/Safety Injection Pump
- 1DA2 480V Switchgear Bus, Unit 5C
- XVG-8000A-RC, Pressurizer Power Operated Relief Valve Inlet Isolation Valve
- (4) Fire Zone DG01.02, A Emergency Diesel Generator Room (DG 436 ft and 463 ft)
B.5.b Inspection Activities (IP Section 02.03) (1 Sample)
The inspectors evaluated the following B.5.b Mitigating Strategies:
- (1) Refueling Water Storage Tank (RWST) make-up using fire service water
INSPECTION RESULTS
Observation: Closure of Two Previous NRC Identified SL-IV Cited Violations 71111.05XT The inspectors reviewed the licensees response to NOVs05000395/2016007-01 and 05000395/2017002-01 and determined that the reasons, corrective actions taken and plans to address recurrence, and the date when full compliance was achieved for these violations is adequately addressed and captured on the docket.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On October 3, 2019, the inspectors presented the triennial fire protection inspection results to Mr. George Lippard III and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.05XT Calculations
43035-CALC-08
Rev. 3A
DC00070-008
BDBMG CST and RWST Flow Rate Calculations
Rev. 1A
DC00340-001
Fire PRA Final Report
Rev. 1A
DC00340-001
2
Fire PRA Fire Risk Quantization Report, Task 5.14
Rev. 0
DC00340-003
V.C. Summer NFPA 805 FRE Report
Rev. 3A
DC00340-007
Fire Human Reliability Analysis
Rev. 1A
DC0780D-001
NFPA Code of Record-Fire Detection
Rev. 2A
TR-08620-312
Nuclear Safety Capability Assessment Fire Shutdown
Analysis
Rev. 2
TR07800-007
Fire PRA Fire Ignition Frequency Analysis (Task 5.6)
Rev. 3
TR07800-008
Non-Power Operational Modes Transition Review
Rev. 1
TR07800-009
NFPA 805 and Fire PRA Circuit Analysis, Task 4.4
Rev. 1
TR07800-033
Fire Safety Analysis Report
Rev. 0A
TR08620-015
Nuclear Safety Equipment Report
Rev. 1
TR08620-034
Fire Response Abnormal Operating Procedures Technical
Basis Document
Rev. 1
TR08620-036
NFPA 805 Recovery Actions, Feasibility/Reliability Study
Rev. 1
TR08620-036
NFPA 805 Recovery Actions, Feasibility/Reliability Study
Rev. 2
Corrective Action
Documents
CR-16-05919
Corrective actions were not taken to resolve NRC-identified
severity level IV non-cited violation,05000395/2016001-01,
which resulted in a cited violation
11/23/2016
CR-16-06023
Receipt of NRC Problem and Identification Report
11/30/2016
CR-17-00537
Licensing Basis documentation associated with NFPA 805
2/01/2017
CR-17-04331
Receipt of Inspection Report 05000395/2017002 and NOV
08/09/2017
CR-17-04335
Corrective action(s) to restore compliance for the Oil
Collection Devices for Reactor Coolant Pump Motors
08/09/2017
CR-19-00607
Cable that supplies power to MVB03116C-SW has
KaoWool wrapped around its metal conduit for Fire
Protection.
2/15/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CR-19-02334
Use of data from an unapproved Flowserve Report in the
station's Fire PRA
06/27/2019
Corrective Action
Documents
Resulting from
Inspection
CR-19-03076
Discrepancies in the FP1AB-388 and FP1AB-388A fire pre-
plans
08/29/2019
CR-19-03342
Discrepancies in the FP1IB-412 fire pre-plan
09/19/2019
CR-19-03463
Total count for medium voltage HEAFs was incorrect for
Fire Area IB-20
09/30/2019
CR-19-03465
Total count for medium voltage HEAFs was incorrect for
Fire Area IB-20
09/30/2019
CR-19-03491
Fire hydrant FHHH #21 missing label
10/01/2019
Drawings
Low Pressure CO2 Fire Extinguishing System Schematic
Arrangement, Sheet 1
Rev. 4
Low Pressure CO2 Fire Extinguishing System Schematic
Arrangement, Sheet 3
Rev. 6
Diesel Generator Building/Diesel Fire Pump Room, Sheet
Rev. 14
B-023-311
Penetration Seal Typical Design, Wall and Floor Detail,
Sheet 1
Rev. 0
B-208-021-
CS0083A
Letdown Orifice Isolation XVT 8149A
Rev. 9
B-208-021-
CS0083B
Letdown Isolation Orifice Isolation XVT-8149A
Rev. 7
B-208-021-
CS0083C
Letdown Isolation Orifice Isolation XVT-8149A
Rev. 11
B-208-032-
EF0037B
EF Isolation From Turbine Driven PP to Steam Gen "A" IFV-
3536
Rev. 12
B-208-067-
MS0046
Main Steam to EFW Pump Turbine
Rev. 11
B-208-082-
RC0050
Pressure Power Relief Valve PCV 444B
Rev. 16
B-208-201-
SW0001
Electrical Elementary Diagram Service Water Pump A
Rev. 8
D-912-157
Building Service System Flow Diagram Intermediate
Rev. 12
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
E-201-240
Electrical, Fire, Pressure and Radiation Barrier Details-Wall
and Floor Openings, Sheet 5
Rev. 7
E-206-005
Simplified Plant Electrical Distribution
Rev. 32
E-214-073
Arrangement of Cable Trays Auxiliary Building North Above
385-0 and 397-0
Rev. 5
E-221-650
Conduit Layout Fire Protection Auxiliary Building above El.
388' & 397'
Rev. 3
E-302-671
Chemical and Volume Control
Rev. 12
E-302-672
Chemical and Volume Control
Rev. 14
E-302-673
Chemical and Volume Control
Rev. 21
E-302-674
Chemical and Volume Control
Rev. 14
E-302-675
Chemical and Volume Control
Rev. 37
E-922-612
Building Service HVAC Control Complex Floor Elevation
436-0
Rev. 24
Engineering
Changes
ECR 50909
RCP Oil Lift Pump Enclosure
01/4/2018
Engineering
Evaluations
14-03
PRA Evaluation of Fire Procedure Time Estimates
Rev. 2
TR0780E-001
Safe Shutdown Separation Fire Protection Engineering
Equivalency Evaluations
Rev. 0A
TR0780E-005
Fire Protection Engineering Equivalency Evaluations
Rev. 0B
TR0780E-006
Fire Protection Equivalency Evaluation, Attachment FEAT-
Rev. 0H
Fire Plans
FP1AB-388
Auxiliary Building El. 388
Rev. 1
FP1AB-388A
Auxiliary Building El. 400
Rev. 1
FP1CB-436
Control Building El. 436
Rev. 1
FP1DG-436
Diesel Generator Building El. 436
Rev. 1
FP1DG-463
Diesel Generator Building El. 463
Rev. 1
FP1IB-412
Intermediate Building El. 412'
Rev. 2
FP1IB-463
Intermediate Building El. 463
Rev. 2
FP1IDX-001
Fire Preplan Index
Rev. 3
FP1LGD-001
Fire Preplan Legend
Rev. 1
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Diesel Fire Pump Fuel Oil Storage Tank Sample Analysis
08/20/2019
Air Balance Inc. Submittal Data, U.L. Classified Fire
Seal/Fire Door Model 319W
10/28/1977
Air Balance Inc. Submittal Data, U.L. Classified Fire
Seal/Fire Door Model 119L
10/09/1978
Air Balance Fire/Seal Schedule
09/19/1978
S&R Products Electro-Thermal Link
10/25/1978
Relay Room CO2 Heat Collector, Cardox Corporation
Detect-A-Fire 140F, Stock No.150112
01/19/1978
Simplex Incipient Detection Equipment
Rev. 0
DBD-FP
NFPA 805 Fire Protection
Rev. 2
EE-02
Cable and Conduit Routing
Rev. 1H
EE-09
NFPA 805 Circuit Selection, Circuit Analysis, and Circuit
Routing
Rev. 0B
RC-18-0091
License Amendment Request - LAR-16-01490 NFPA 805
Program Revisions
08/28/2018
RC-18-0091
License Amendment Request to Revise NFPA 805 Program 08/29/2018
RCA 17-00537
Regulatory/Current License Basis Noncompliance
05/02/2019
VCS-TQP-0606
Fire Protection Training
Rev. 0C
Model for Failure of RCP Seals Given Loss of Seal Cooling
01/2004
A
Model for Failure of RCP Seals Given Loss of Seal Cooling
03/2007
Procedures
Appendix A
Operational Impacts of Loss of Electrical Buses Due to Fire
Rev. 1
Appendix B
Post Fire Transition to Cold Shutdown - Other Potentially
Affected Components
Rev. 0
Appendix C
Local Operator Actions
Rev. 1
Fire Response Initial Actions
Rev. 3
Control Room Evacuation Due to Fire
Rev. 2
Control Building Fire Zone Response Actions
Rev. 4
Intermediate Building Fire Zone Response Actions
Rev. 1
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Auxiliary Building and Fuel Handling Building Fire Zone
Response Actions
Rev. 1
Diesel Generator Fire Zone Response Actions
Rev. 0
BDMG-2.0
Beyond Design Basis Mitigating Guideline
Rev. 2
EC-03
Processing Engineering Change Packages
Rev. 6I
Program / Issue Screening
Rev. 3F
NFPA 805 - Fire Protection Monitoring Program
Rev. 0
Program Administration
Rev. 6E
Fire Prevention
Rev. 5A
Fire Suppression
Rev. 5
FSP-2.0
Flex Support Procedure - Alternate EFW Suction Source
Rev. 1
ICP-230.006
Incipient Detection Functional Check
Rev. 1
ICP-500.030
Incipient Detection Maintenance Procedure
Rev. 1A
OAP-100.6
Control Room Conduct and Control of Shift Activities
Rev. 4N
Rev. 10B
Station Housekeeping Program
Rev. 17E
Fire Protection Surveillances and Compensatory Measures
Rev. 4A
STP-128.012
NFPA 805 Required Fire Hydrant Inspection
Rev. 8
STP-128.021
Fire Service Water Flow Test
Rev. 11B
STP-128.024
CO2 System Functional Refuel Test
Rev. 10
STP-606.002
Fire Pump Diesel Engine Fuel Oil Storage Tank Oil Analysis Rev. 9D
STP-728.402
Fire Yard Hydrant Annual Inspection and Hydrostatic
Testing
Rev. 6
TR07870-019
Penetration Seal Design Guide
Rev. 0
VCS-ERP-0050
ERU Equipment Inventory
Rev. 4
VCS-ERP-0130
BDB Emergency Equipment Management
Rev. 0A
Self-Assessment
CR-19-00506
71111.05XT Triennial Fire Protection Self Assessment
04/12/2019
QA-AUD-2017-03 Fire Protection Audit Notification
01/31/2017
QA-AUD-201804
Fire Protection Annual
03/26/2018
QA-AUD-201903
Fire Protection Bi/Triennial
03/27/2019
Work Orders
1610548
CO2 System Functional Test
01/19/2017
1610897
Fire Hose Hydro Test
06/26/2017
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1615983
DG Building Pre-Action Sprinkler Operability Test
07/25/2017
1615983
Diesel Generator Pre-action Sprinkler System OPS Testing
07/25/2017
1706346
ESF SWGR RM. 1DA Air Handling Unit XFD-0178
Inspection
01/02/2018
1714790
CO2 Valve Line-up Verification
01/31/2018
1800412
CO2 System Functional Test
05/24/2018
1801620
Intermediate Building El. 436-0 Simplex 4100 UT1B2
05/29/2018
1801620
Smoke Detector Functional Test
05/09/2019
1801625
Smoke Detection Functional Test
05/29/2018
1801625
Intermediate Building El. 436-0 Simplex 4100 UT1B2
05/29/2018
1801690
Fire Hose Visual Inspection
04/23/2018
1802465
Incipient Detection Surveillance
01/02/2019
1810811
CO2 Valve Line-up Verification
08/02/2018
1811319-001
DG Building Preaction Sprinkler Operability Test
01/15/2019
1812537-001
Control Room Evacuation Panel Emergency Tool Locker
Inventory List
06/29/2019
1816495
Relay Room Cooling, XFD-0016 Inspection
01/30/2019
1817412-001
IB Preaction Sprinkler System Operability Testing
2/14/2019
1904113-001
Smoke Detector Functional Test Zone N Control Building
448'
04/03/2019
1904467-001
Smoke Detector Functional Test Zone XX Control Building
448'
04/10/2019