05000298/LER-1980-004-03, /03L-0:on 800115,during Normal Operation, Discovered That RHR Valve M018 Was Inoperable.Caused by Failure of GE Relay Coil,Blowing Valve Control Circuit Fuse. Relay Coil Was Replaced & Correct Operation Verified

From kanterella
(Redirected from ML19294B477)
Jump to navigation Jump to search
/03L-0:on 800115,during Normal Operation, Discovered That RHR Valve M018 Was Inoperable.Caused by Failure of GE Relay Coil,Blowing Valve Control Circuit Fuse. Relay Coil Was Replaced & Correct Operation Verified
ML19294B477
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/08/1980
From: Bednar L
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19294B476 List:
References
LER-80-004-03L, LER-80-4-3L, NUDOCS 8002280479
Download: ML19294B477 (1)


LER-1980-004, /03L-0:on 800115,during Normal Operation, Discovered That RHR Valve M018 Was Inoperable.Caused by Failure of GE Relay Coil,Blowing Valve Control Circuit Fuse. Relay Coil Was Replaced & Correct Operation Verified
Event date:
Report date:
2981980004R03 - NRC Website

text

NRC FORM 366 U. S. NUCLE AR REGUL AToRY CoMMISStoN s7 77)

LICENSEE EVENT REPORT ccNT90tstoC< l l

l l ]O (PLEASE PAINT oR TYPE ALL REcutREo lNFoRMATioN) o11 l Ni El Cl Pl PJ 11 @

d 3-O I 01 0 01 -l 0l ri dgl 4 l ll 1 il1l@l octwEe mE a

s oca,a Nae 2s o

ocEN a n,e ao u au covT 2 10 I 8 19 10 @

M l L!@ 01 Sl0! 01 01 21 91 8@l0Il1115lelOl@l0

)

4 W

c1 got w E ! N;,,vg g r.e M

o s v ENT DATE

'4 3

HEPORT DATE n0 event oesCRiprico Ano Pnos AeLE C;*.SECLENCE: h

, !; lDuring normal operation an operator noticed that the ;;reen indicating light fo r

,RHR valve M018 was not lit.

The control power for the valve was lost and made the,

valve inoperable (Tech. Spec. Section 3.7.D.2).

The valve was on the closed posi- )

.4 oI>i leion as required for power opera:icn.

The normal RHR suction valves were open.

l a in Ithus, the RHR system would have been available if needed.

This event had no adversq oI'lleffect uoan public health and safety.

l L:1: J i I

7 8 3 SYSTEM CAvst C AL,E COUP wALVE CCCE

.CDE W8C CE CCVPCNENT CODE SUSCCDE SudCODE I c l Fl@ LIJG Lil@ l Rl El Ll Al Yl M@ l Al@ W @

o 9

s J

16 it 12 i;

u 19

.o 3E:AEN T' AL Qu

/4 M NLC REFORT REVISION gq 99 E% ENT YE AN HEPORT No CDE TYPE N o.

@. _glg I 81 01

- l I 01 01 al I/l lo13I I t. I l-l loi 2I 22 23 24 46 27 23
9 Ju JI 31 ACTION suTUAE EF8ECT SHurOOWN A TT ACHME N T NPRO 4 PAIVE CCVP COYPCNENT TAKEN ACTION oN PLANT YETHOD HOURS "

SLBViTTED FoAubOS SL PP LI E R MANUFACTURER LA_J@,4ZI@

Lz_J@

Lz_J@

1010101 01 W@

l@

Nl@

lGIOl8l0l@

33 33 J6 3 '.

40 43 42 43 44 47 CAUSE oESCRIPTION AND CORRECTIVE ACTIONS h The coil of a General Electric Model CR120 relay (#16A-K31) failed and blew the valg i

o ii)ij lve control circuit fuse. The relay coil was replaced with an identical spare and coy-Irect operation of the relay was verified. This was the first failure of this type o!p-l served at CNS. During subsequent discussions with the vendor, it was determined that i

i Ithe coil failure was of a random nature and was not indicative of a generic problem) i A

f '

80 F AOLity ME THOD OF STATUS mPOWER OTHER STATUS DISCOV E H Y O'SCOVERY DESCRIPTION FFl W@ l 01918l@l NA l

lAl@l Operator Observation l

A21,virY C$ TENT 8

AMOUNT oF ACTIVITY @

afteAsED OF aELE ASE LOCATION OF RELs ASE I zl @ LZj@l NA I

NA I

i c

4,

iO t1 44 45 80 PERSONNEL F nPOSLRES

, net E R TYPE C E SC PIP TION IiI7i 10 01 Ol@l zl@l N

l H

9 ii 12 11 80 PE RSONNE L 'NJU A6 ES Nuv9E n DE SCRIPTION l0101Ol@l NA I

4 ii i2 80 1 UM d)F - H4 [14V AGE TO F AClli f Y I'

  • P E L E SCittP Tt CN l'E } (_lj@l NA I

4

.o 30 N

3'*

.g".~.P, y 300223o q ;9 NHC llSI. i JN t Y

,,,,,,,,,,,g M

J lt' 6d 69 80 5 Ladislav F. Bednar 402-825-3811 o

NAVE OF PREPARER PHON E :