Forwards LER 80-004/03L-0
Date released: 11/04/2019 Download: ML19294B476


LER 80-004/03L-0:on 800115,during Normal Operation, Discovered That RHR Valve M018 Was Inoperable.Caused by Failure of GE Relay Coil,Blowing Valve Control Circuit Fuse. Relay Coil Was Replaced & Correct Operation Verified