MONTHYEARML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066G2882020-02-28028 February 2020 LLC Submittal of Presentation Materials Titled ACRS Full Committee Presentation: NuScale - Steam Generator Design (Closed Session), PM-0220-69053, Revision 0 2023-06-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-0219-64562 February 14, 2019 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Supplemental Response to NRC Request for Additional Information No. 408 (eRAI No. 9325) on the NuScale Design Certification Application
REFERENCES:
- 1. U.S. Nuclear Regulatory Commission, "Request for Additional Information No. 408 (eRAI No. 9325)," dated April 05, 2018
- 2. NuScale Power, LLC Response to NRC "Request for Additional Information No. 408 (eRAI No.9325)," dated June 04, 2018 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) supplemental response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's supplemental response to the following RAI Question from NRC eRAI No. 9325:
15.00.02-1 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Paul Infanger at 541-452-7351 or at pinfanger@nuscalepower.com.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8H12 Samuel Lee, NRC, OWFN-8H12 Rani Franovich, NRC, OWFN-8H12 : NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9325 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
RAIO-0219-64562 :
NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9325 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9325 Date of RAI Issue: 04/05/2018 NRC Question No.: 15.00.02-1 Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Section 47 (a)(2) states, A description and analysis of the structures, systems, and components (SSCs) of the facility, with emphasis upon performance requirements, the bases, with technical justification therefor, upon which these requirements have been established, and the evaluations required to show that safety functions will be accomplished. Likewise, 10 CFR Part 50, Appendix K, II.4 - Required Documentation, requires that, To the extent practicable, predictions of the evaluation model, or portions thereof, shall be compared with applicable experimental information. Additionally, GDC-10 Reactor design states the reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
As stated in RG 1.203, an evaluation model (EM) is the calculational framework for evaluating the behavior of the reactor system during a postulated transient or design-basis accident. As such, the EM may include one or more computer programs, special models, and all other information needed to apply the calculational framework to a specific event, as illustrated by the following examples:
- 1. Procedures for treating the input and output information (particularly the code input arising from the plant geometry and the assumed plant state at transient initiation).
- 2. Specification of those portions of the analysis not included in the computer programs for which alternative approaches are used.
- 3. All other information needed to specify the calculational procedure.
NuScale Nonproprietary
The entirety of an EM ultimately determines whether the results are in compliance with applicable regulations. Therefore, the development, assessment, and review processes must consider the entire EM.
NRELAP5 code and input models used are key components of FSAR 15.0.2 "Review of Transient and Accident Analyses" results. The staff noted that NRELAP5 models that support the Chapter 15 accident analysis (including NRELAP5 analyses for FSAR Chapters 15.1.1 through 15.6.6) are built from a base model, EC-A010-1782 "NuScale NRELAP5 Module Basemodel," rev. 0, that did not address a large number of small changes in NuScale Power Module (NPM) geometry as contained in EC-A010-1507, rev 3 Transient Model Input Parameters. It apears that the base model, EC-A010-1782, was built from EC-A010-1507, rev 0. NRC staff understands that the NuScale engineering change notice (ECNs) are designed to account for each NRELAP5 model document modification needed as changes or errors are identified that affect that documents inputs or results, however, it appears to NRC staff that many document changes are without ECNs. NRC staff is trying to understand (1) how the applicant plans to reconcile the changes made in the NPM design to the NRELAP5 analyses for FSAR Chapters 15.1.1 through 15.6.6 and (2) how NRC staff can determine that the analysis model results remain valid such that margins are understood and protected.
Please provide a description of all NRELAP5 analyses that support FSAR Chapters 6 and 15 and confirm that the geometry inputs used and results obtained include adequate margin per applicable requirements of GDC-10 and 10 CFR 52.47. Additionally, please provide a list of changes in NPM geometry, or other design changes, since EC-A010-1507, rev. 0 (which is bases of EC-A010-1782) to current Rev. 3 (including any later updates) so staff can better understand the design changes made.
NuScale Response:
The NRC and NuScale held a clarification call on January 23, 2019, to discuss the NRC concerns related to the subject request for additional information (RAI). In that call the NRC requested that the response be focused on the reanalysis of Chapter 15 events using NRELAP5, version 1.4. Specifically the NRC needs to understand which analyses (including RAIs) have been performed using NRELAP5, version 1.4 and the most current basemodel.
NuScale Nonproprietary
=
Background===
The analyses that support both Chapters 6 and 15 of the NuScale Final Safety Analysis Report (FSAR) use NRELAP5 models that are all derived from a common basemodel which is periodically updated to capture any important design changes that could be relevant to system transient simulations. The basemodel is documented in NuScale Calculation EC-A010-1782, Reactor Module NRELAP5 Model. Currently this document is at Revision 2, dated January 22, 2019.
EC-A010-1507, Transient Model Input Parameters, is at Revision 3 and is considered the geometry calculation for the NRELAP5 basemodel. All changes in EC-A010-1507, Revision 3 are incorporated into EC-A010-1782, Revision 2. This includes the geometry changes identified in the history of the NRELAP5 basemodel discussion provided below. A brief history of the NuScale NRELAP5 Basemodel is provided below to enhance understanding of the changes to the NRELAP5 basemodel.
History of NRELAP5 Basemodel
- EC-A010-1782, Reactor Module NRELAP5 Model, Revision 0, was released in December 2015 based on the geometry established in EC-A010-1507, Revision 0 and the nodalization and modeling options that had been confirmed by various preliminary analyses. The basemodel used NRELAP5, version 1.0.
- ECN-A010-5147, NRELAP5 Basemodel Error Corrections, was released in February 2017 and incorporated fixes to several input and typographical errors associated with three different condition reports. This Engineering Change Notice (ECN) was primarily conforming in nature since all important errors were previously corrected in implementing analysis.
- The EC-A010-1782, Revision 1 model was released in August 2017 and included an update to the latest design inputs as defined in the geometry calculation (EC-A010-1507, Revision 3), hydraulic losses (from NuScale Calculation EC-A030-2359, RCS Flow Form Loss Calculation, Revision 4), and NPM operating and boundary conditions (from NuScale Report ER-0000-2486, Safety Analysis Limits Report, Revision 4) were also included. Internal reactor coolant system (RCS) components were added as passive heat structures to the model for completeness. As applicable, error corrections from ECN-A010-5147 were also incorporated. The basemodel used NRELAP5, version 1.3.
- ECN-A010-6177, Corrections to NRELAP5 Base Model, was released in March 2018 to address an updated pitch to the diameter ratio calculation method for the steam NuScale Nonproprietary
generator (SG) and to address a minor error related to the distribution of SG flow losses in the RCS loop.
- The EC-A010-1782, Revision 2 model was released in January 2019 and incorporated engineering changes related to the Module Protection System design changes defined in ER-0000-2486, Revision 7 and minor changes to RCS losses described in EC-A030-2359, Revision 5. ECN-A010-6177 was also incorporated along with fixes for other minor modeling errors. This revision incorporated use of NRELAP5, version 1.4 into the basemodel.
For context, ECNs are engineering change notices which provide markups to a base document between full revisions. ECNs get approved for use by the organization owning the document.
When a base document is moved to a new revision, the outstanding ECNs (markups) are incorporated into the next revision.
While the NRELAP5 basemodel is kept up to date as described above, it should be noted that each particular analysis methodology requires specific modeling changes, depending on the analysis requirements. As an example, the Containment Vessel (CNV) peak pressure analysis requires the use of conservative geometric volume inputs which requires all the RCS and CNV volumes to be biased conservatively. Another example is the Loss-of-Coolant Accident (LOCA) specific Critical Heat Flux (CHF) flag that requires a minor modification of the hot assembly heat structure flag for the purposes of performing the LOCA calculations. These various method specific model changes in addition to relevant design change incorporation or basemodel error corrections are made as necessary within each analysis such that keeping the basemodel document current was not required through the development of the analyses supporting the original Design Certification Application (DCA) submittal and supporting Topical and Technical Reports.
Current Status of DCA Analyses The following table provides the current status of DCA analyses, including which version of NRELAP5 was used, the basemodel version used and a description of the update of the analysis.
NuScale Nonproprietary
FSAR NRELAP5 EC-0000-1782 Comments Section Version Revision 15.0 1.4 1 The Return to Power analysis and associated FSAR results were updated as part of the response to RAI 9487, Question 15-5.
15.1 1.3 0 Updates to the increase in heat removal events is in progress. Due to relatively large core thermal margins demonstrated in the original FSAR analyses, these updates have been given low priority as none of the model or code changes are expected to impact the limiting transient responses.
15.2 1.3 0 Updates to the heatup events are in progress, including the completion of analyses supporting FSAR sections 15.2.1-4. However, the updated results have not yet been incorporated into NuScales DCA. Peak RCS pressure results are very similar to the original FSAR analyses and peak secondary pressure results are still showing large margins to acceptance criteria.
15.3 N/A N/A There are no NRELAP5 calculations supporting this section.
15.4 1.3 0 Complete updates to the reactivity events are currently in progress. NRELAP5 code version and modeling changes are not expected to influence these calculations as the limiting Minimum Critical Heat Flux Ratio (MCHFR) event progressions are slow power ascensions to the high RCS temperature and core power trip points. These analytical limits have not changed.
15.5 1.3 0 By design the NuScale Power Module (NPM) has no significant make-up system, making this a very slow and mild transient. Therefore, the update to increase in reactor coolant inventory section has been given a low priority but will be completed as part of the overall NuScale Nonproprietary
FSAR NRELAP5 EC-0000-1782 Comments Section Version Revision FSAR update.
15.6.2 1.3 0 The slow decrease in RCS inventory events are 15.6.3 primarily evaluated to demonstrate radiological 15.6.4 release limits are met. The original FSAR analyses demonstrated significant margin to acceptance criteria, because liquid inventory protection is prioritized in the NPM design due to its importance in Emergency Core Cooling System (ECCS) functionality. None of the inventory retention actuations or analytical limits have been changed.
Therefore, the results of these calculations are not expected to change.
15.6.5 1.3 0 The LOCA FSAR calculation has been completed and can be made available for audit. However, the results have not yet been incorporated into the DCA.
15.6.1 & 1.4 1 The FSAR description of the Inadvertent Opening of 15.6.6 an RPV [Reactor Pressure Vessel] Valve (IORV) transient was updated as part of the response to RAI 9373, Question 15.06.06-2.
6.2 1.4 1 The FSAR description of the limiting CNV pressure and temperature transients was updated as part of the response to RAI 9482, Question 06.02.01.01.A-19.
TR- 1.4 1 Methodology supporting calculations have been 0516- updated in the LOCA licensing topical report (LTR) to 49422 address minor modeling changes to the limiting RCS pressure and temperature initial conditions as described in the response to RAI 9085, Question 15.06.05-12.
NuScale Nonproprietary
FSAR NRELAP5 EC-0000-1782 Comments Section Version Revision TR- 1.1-3 0 The purpose of the demonstration calculations 0516- provided in section 8 of the Non-Loss-of-Coolant 49416 Accident Analysis Methodology LTR is to demonstrate the sufficiency of the spectrum of sensitivities prescribed in section 7.2 of the LTR. The code or model changes in NRELAP5 version 1.4 are not sufficiently significant to change this purpose.
Therefore, these calculation results are not expected to be modified or updated.
TR- 1.4 1 The CNV Technical Report calculation results have 0516- been updated in response to RAI 9482, Question 49084 06.02.01.01.A-18.
TR- 1.4 1 The Long Term Cooling Technical Report was 0916- updated in response to RAI 9516, Question 15-26.
51299 Summary and Conclusions EC-A010-1782, Reactor Module NRELAP5 Model, Revision 2, dated January 22, 2019, has incorporated all geometry changes made and utilizes NRELAP5, version 1.4 and is consistent with EC-A010-1507, Transient Model Input Parameters, Revision 3. Revision 1 of EC-A010-1782 also incorporated the geometry changes from EC-A010-1507 and therefore is a sufficiently current starting point for ECCS related calculations where DHRS actuation is typically not credited.
NRELAP5 source code changes from version 1.3 to version 1.4 result in very minor differences in calculation results. The basemodel changes due to the various minor NPM design changes have also, generally, had small impact on calculated margins. The more significant changes are due to modeling corrections (e.g. LOCA level calculation change and IORV modeling option error correction) and from on-going modifications to the final analysis methodologies or applied conservatisms due to RAI responses (e.g. CNV maximum noncondensable gas concentration or long term cooling boundary condition changes). These more significant changes have already been incorporated and submitted to the NRC as part of various RAI responses. The remaining analyses are not expected to significantly change as described in Table 1. NuScale will continue NuScale Nonproprietary
update the outstanding DCA analyses which will be available for audit on or before July 31, 2019 and will be provided to the NRC as part of the FSAR, Revision 3 submittal (estimated to occur in the 3rd quarter of 2019).
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary