MONTHYEARML23234A1232024-03-28028 March 2024 US600 DC and SDA 50.46 Exemption - Letter ML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 2024-03-28
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-0119-64132 January 11, 2019 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Supplemental Response to NRC Request for Additional Information No. 457 (eRAI No. 9501) on the NuScale Design Certification Application
REFERENCES:
- 1. U.S. Nuclear Regulatory Commission, "Request for Additional Information No. 457 (eRAI No. 9501)," dated May 02, 2018
- 2. NuScale Power, LLC Response to NRC "Request for Additional Information No. 457 (eRAI No.9501)," dated June 12, 2018 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) supplemental response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's supplemental response to the following RAI Question from NRC eRAI No. 9501:
15-12 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Paul Infanger at 541-452-7351 or at pinfanger@nuscalepower.com.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8H12 Samuel Lee, NRC, OWFN-8H12 Rani Franovich, NRC, OWFN-8H12 : NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9501 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
RAIO-0119-64132 :
NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9501 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9501 Date of RAI Issue: 05/02/2018 NRC Question No.: 15-12 10 CFR 52.47(a)(11) requires an applicant for design certification to provide proposed technical specifications prepared in accordance with the requirements of 10 CFR 50.36. 10 CFR 50.36(c)
(2)(ii)(B) requires that a technical specification limiting condition for operation (LCO) be established for a "process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier." The initial condition ranges assumed in the evaluation of design basis events is provided in Table 15.0-6 of the Final Safety Analysis Report (FSAR). This table includes the range of reactor coolant system (RCS) average temperatures and pressures assumed to bound the RCS average temperature and pressure ranges during planned normal operation, including startup. These are listed in Table 15.0-6 as the Tavg and pressurizer pressure parameter ranges, which form the analytical bounds for planned power operation.
NuScale generic technical specifications (GTS) do not include an LCO for the Tavg parameter directly. However, the staff noted that LCO 3.4.1 includes a LCO for RCS pressure, flow, and cold leg temperature (Tcold), with TS bases that state, "The limits placed on RCS pressure and temperature ensure that the minimum critical heat flux ratio (MCHFR) will be met for each of the transients analyzed." In their response to RAI 8772, Question 4.03-1, NuScale clarified that the RCS cold temperature is based on preserving thermal margin to critical heat flux.
The staff interprets FSAR Table 15.0-6 as providing the analysis initial condition ranges that are used in the Chapter 15 transient and accident analysis (LOCA and non-LOCA), to determine the appropriate acceptance criteria are met. Further, the NuScale Containment Response Analysis Methodology Technical Report, TR-0516-49084, incorporated by reference into the FSAR, provides the methodology for selection of the initial conditions of the analyses, but not in all cases the numerical values, such as Tavg.
NuScale Nonproprietary
- 1. The staff is seeking clarification of whether NuScale intends that LCO 3.4.1 protects the initial average RCS temperature and pressure ranges assumed in Table 15.0-6 for all of the design basis events listed above (LOCA and non-LOCA), as well as the initial conditions for the peak containment pressure analysis. If LCO 3.4.1 is only intended to ensure CHFR is met for "each of the transients analyzed," please specify the TS LCO that is intended to ensure CHFR is met for the LOCA analysis and peak containment pressure is met for FSAR Section 6.2.1 analyses. If LCO 3.4.1 is intended for the LOCA and peak containment pressure analyses, please update the Technical Specification Bases for LCO 3.4.1, and also include the methodology for the containment pressure analyses in Technical Specification Section 5.6.3.
- 2. In addition, the staff is seeking clarification regarding FSAR Figure 4.4-9," Analytical Operating Limits". FSAR Section 4.4.3.2, "Operating Restrictions", states that, "Figure 4.4-9 provides the operating map indicating the permissible operating range that is constrained by each of the following considerations." The staff interprets Figure 4.4-9 as defining the transient operating space (i.e., upset conditions a reactor enters during an AOO) as determined by the trip setpoints and not the initial permissible operating range for planned normal operation, which would be governed by Technical Specification LCOs. The staff is requesting that NuScale provide additional information regarding Figure 4.4-9 and revise the FSAR, if necessary, to clarify its intent.
NuScale Response:
This supplemental response is made to address comments received during the public meeting held on December 12, 2018 with the NRC staff.
FSAR Tier 2, Section 4.4.3.2 and Figure 4.4-9 have been modified to better reflect the operating and analytical design restrictions. Additionally, the Applicable Safety Analyses section of the bases of technical specification LCO 3.4.1 have been modified to better reflect the safety analyses related to the limits in this LCO.
Impact on DCA:
The FSAR and Technical Specifications have been been revised as described in the response above and as shown in the markup provided in this response.
NuScale Nonproprietary
NuScale Final Safety Analysis Report Thermal and Hydraulic Design The following flow paths allow flow to bypass the core and reduce flow through the fuel assemblies:
- reflector block cooling channels
- fuel assembly guide tubes and instrument tubes Best-estimate flow, maximum flow, and minimum flow are calculated for the applicable design considerations. These calculations account for the uncertainties in the component flow resistances and the thermal head.
4.4.3.1.1.1 Reflector Cooling Channel Bypass The reflector blocks surrounding the core have several cooling channels that allow flow to pass through the reflector blocks. A conservative value for the reflector cooling channel bypass fraction for steady-state and transients is provided in Reference 4.4-3.
4.4.3.1.1.2 Guide Tube and Instrument Tube Bypass The maximum amount of bypass flow for the guide tubes and instrument tubes for the fuel assemblies is provided in Reference 4.4-3.
The total bypass flow used in the subchannel analysis is 8.5 percent. Below 20 percent power, the bypass flow is 9 percent.
RAI 15-12 4.4.3.2 Analytical Design Operating Restrictions RAI 15-12S1, RAI 16-44S1 Figure 4.4-9 provides the operating map indicating the permissible operating range that is constrained by each of the following considerations:Figure 4.4-9 provides the operating map showing analytical and normal operating conditions. The green dotted line with Tcold, Tavg, and Thot identified represent nominal full power operating conditions. Tavg remains fixed above 15 percent rated thermal power (RTP); Tcold and Thot vary along the green dotted line as power is increased or decreased. The solid blue and black dotted lines illustrate the normal Tavg and RCS pressure operating ranges, excluding the Tavg during startup with the reactor at less than 15 percent RTP.
RAI 15-12S1, RAI 16-44S1 The analytical limits on the operating range that are illustrated as the outer box (red on three sides, blue at minimum critical temperature) constrained by the following considerations:
RAI 15-12S1, RAI 16-44S1
- Right-hand limit: core power and inlet temperature for given pressures that result in MCHFR at the CHF analysis limitUpper RCS pressure bound: analytical limit protects against exceeding RPV pressure limits for reactivity and heatup events Tier 2 4.4-13 Draft Revision 3
NuScale Final Safety Analysis Report Thermal and Hydraulic Design
- Upperbound: analytical limit protects against exceeding RPV pressure limits for reactivity and heatup eventsLower RCS pressure bound: analytical limit ensures riser subcooling is maintained.
RAI 15-12S1, RAI 16-44S1
- Left-hand boundary: analytical limit on minimum temperature for criticalityLeft-hand temperature boundary: analytical limit on minimum temperature for criticality
- Right-hand average temperature limit: analytical riser temperature limit protects against exceeding MCHFR limits for reactivity and heatup events.
RAI 15-12S1, RAI 16-44S1 The low-RCS pressure analytical limit ensures riser subcooling is maintained. If hot leg temperature is below 600 degrees F, the low pressure analytical limit is constant at 1600 psia. If hot leg temperature is above 600 degrees F, then the low pressure analytical limit increases as:If hot leg temperature is below 600 degrees F, the low pressure analytical limit is constant at 1600 psia. If hot leg temperature is above 600 degrees F, then the low pressure analytical limit increases to 1720 psia. The saturation curve and a parallel, 5 degrees F margin are illustrated on the right side of the figure showing the margin to saturation in the riser based on the analytical limits shown.
P limit = ( T hot - 600 ) 12 + 1600 Eq. 4.4-2 RAI 15-12S1, RAI 16-44S1 where, T = temperature in degrees F, and P = pressure in psia.
4.4.3.3 Thermal Margin Limit Map A series of CHF calculations are performed for a range of power levels between hot zero power (HZP) and HFP to establish trends and operating conditions of the limiting MCHFR, and to determine the limiting axial flux shapes for subchannel calculations.
The limiting axial flux shape is determined based on a nuclear analysis (Section 4.3) of all of the possible axial flux shapes that could occur during the equilibrium cycle from operation within the operating limits. The operating limits in this context are the axial offset window, the power dependent insertion limits, and the cycle burnup. The analysis of axial flux shapes is described in Section 4.3. From these axial shapes, limiting top-peaked, middle-peaked, and bottom-peaked shapes are identified at 5 percent, 25 percent, 50 percent, 75 percent, and 102 percent. At each power level, a subchannel analysis is performed using VIPRE-01 to determine the MCHFR for a top-peaked, a middle-peaked, and a bottom-peaked shape. Figure 4.4-10 shows the MCHFR versus power from this analysis. The MCHFR calculations are performed including the deterministically combined uncertainties discussed in Section 4.4.2.9 and summarized in Table 4.4-4. The results of this analysis identify a unique limiting shape for each Tier 2 4.4-14 Draft Revision 3
Tier 2 NuScale Final Safety Analysis Report RAI 15-12, RAI 15-12S1, RAI 16-44S1 Figure 4.4-9: Analytical Design Operating Limits 2100 High Temperature Analytical Limit (610°F)
High Pressure Analytical Limit (2000 psia) 2000 High TAvg Initiatl Condition (555F)
High Pressure Operating Limit (1920 psia)
Pressurizer Pressure (psia)
Low Normal TAvg (535F)
Minimum Critical Temperature (420°F) 1900 Normal Operating Pressure (1850 psia)
TCold TAvg THot 4.4-48 1800 Low Normal Pressure (1780 psia)
Low Pressure Analytical Limit (1720 psia) 1700 1600 Low Low Pressure Analytical Limit (1600 psia)
Subcooled Margin 5°F Thermal and Hydraulic Design Saturation Curve 1500 400 450 500 550 600 650 Reactor Coolant System Temperature (°F)
Draft Revision 3
RCS Pressure, Temperature, and Flow Resistance CHF Limits B 3.4.1 BASES APPLICABLE SAFETY ANALYSES (continued)
The NSP2 and NSP4 correlation limits are used for comparison to conditions representative of normal operation, operational transients, anticipated operational occurrences, and accidents other than events that are initiated by rapid reductions in primary system inventory. The Hench-Levy correlation is used to evaluate events for which analyses postulate a rapid reduction in primary system inventory. An assumption for the analysis of these events is that the core power distribution is within the limits of LCO 3.1.6, Regulating Group Insertion Limits; LCO 3.2.1, "Enthalpy Rise Hot Channel Factor (FH)," and LCO 3.2.2, AXIAL OFFSET (AO).
The flow resistance in the RCS directly affects the reactor coolant natural circulation flow rate established by THERMAL POWER, RCS pressure, and RCS temperature. The safety analyses assume flow rates that are based on a conservative value of flow resistance through the RCS.
Therefore the resistance must be verified to ensure that the assumptions in the safety analyses remain valid.
The pressurizer pressure operating limit and the RCS averagecold temperature limit specified in the COLR, as shown on the Analytical Design Operating LimitsThermal Margins Limit Map, correspond to operatinganalytical limits, with an allowance for steady state fluctuations and measurement errors. These are the analytical initial conditions assumed in transient and LOCA analyses.
The RCS CHF parameters satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii).
LCO This LCO specifies limits on the monitored process variables, pressurizer pressure and RCS cold temperature to ensure the core operates within the limits assumed in the safety analyses. It also specifies the limit on RCS flow resistance to ensure that the RCS flow is consistent with the flow assumed in the safety analyses. These variables are contained in the COLR to provide operating and analysis flexibility from cycle to cycle.
Operating within these limits will result in meeting CHFR criterion in the event of a CHF-limited transient.
NuScale B 3.4.1-2 Draft Revision 3.0