BSEP 16-0069, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures

From kanterella
(Redirected from BSEP 16-0069)
Jump to navigation Jump to search
Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures
ML18250A023
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/11/2016
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18250A015 List:
References
BSEP 16-0069
Download: ML18250A023 (44)


Text

Revision: 25 UPDATED FSAR Chapter: 9 AUXILIARY SYSTEMS CHAPTER 9 FIGURES Page: 1 of 2 LIST OF FIGURES FIGURE NUMBER TITLE FIGURE 9-1 NEW FUEL STORAGE VAULT FIGURE 9-2 OUTLINE NEW FUEL STORAGE RACK FIGURE 9-3 DELETED IN REVISION 21 FIGURE 9-4 FUEL POOL MODULE ARRANGEMENTS FIGURE 9-5 FUEL PREPARATION MACHINE FIGURE 9-6 CHANNEL GAUGING FIXTURE FIGURE 9-7 OUTLINE CONTROL ROD (ORIGINAL EQUIPMENT DESIGN)

FIGURE 9-8 SPENT FUEL POOL GRID STRUCTURE FIGURE 9-9 6 X 6 BWR FUEL RACK FIGURE 9-10 PWR FUEL RACK FIGURE 9-11 FUEL RACK LATCH ASSEMBLIES FIGURE 9-12 SCHEMATIC OF TYPICAL HDFSS MODULE FIGURE 9-13 HDFSS MODULE SUPPORT SYSTEM FIGURE 9-14 HDFSS MODULE SUPPORT SYSTEM DETAIL FIGURE 9-15 BRUNSWICK FUEL POOL EVALUATION CASE 1 - BATCH OFFLOAD STARTING AT 190 HOURS FIGURE 9-16 BRUNSWICK FUEL POOL EVALUATION CASE 2 - FULL CORE OFFLOAD STARTING AT 24 HOURS FIGURE 9-17 BRUNSWICK FUEL POOL EVALUATION CASE 1 - BATCH OFFLOAD STARTING AT 190 HOURS FIGURE 9-18 BRUNSWICK FUEL POOL EVALUATION CASE 2 - FULL CORE OFFLOAD STARTING AT 24 HOURS FIGURE 9-19 BRUNSWICK FUEL POOL EVALUATION CASE 1 - BATCH OFFLOAD STARTING AT 190 HOURS FIGURE 9-20 DELETED IN REVISION 18A FIGURE 9-21 DELETED IN REVISION 21 FIGURE 9-22 DELETED IN REVISION 21 FIGURE 9-23 REDUNDANT FEATURES OF REACTOR BUILDING CRANE FIGURE 9-24 REDUNDANT HOOK AND LOAD BLOCK FIGURE 9-25 UPKICK LUG FIGURE 9-26 TYPICAL 35 DAY OUTAGE W INDOW SCHEDULE FIGURE 9-27 DELETED IN REVISION 21 FIGURE 9-28 DELETED IN REVISION 21 FIGURE 9-29 DELETED IN REVISION 21 FIGURE 9-30 SERVICE W ATER PUMP DIMENSIONS FIGURE 9-31 DELETED IN REVISION 21 FIGURE 9-32 DELETED IN REVISION 21 FIGURE 9-33 DELETED IN REVISION 21 FIGURE 9-34 DELETED IN REVISION 21 FIGURE 9-35 DELETED IN REVISION 21 FIGURE 9-36 DELETED IN REVISION 21 FIGURE 9-37 DELETED IN REVISION 21

Revision: 25 UPDATED FSAR Chapter: 9 AUXILIARY SYSTEMS CHAPTER 9 FIGURES Page: 2 of 2 LIST OF FIGURES FIGURE NUMBER TITLE FIGURE 9-38 DELETED IN REVISION 21 FIGURE 9-39 DELETED IN REVISION 21 FIGURE 9-40 DELETED IN REVISION 21 FIGURE 9-41 DELETED IN REVISION 21 FIGURE 9-42 DELETED IN REVISION 21 FIGURE 9-43 DELETED IN REVISION 21 FIGURE 9-44 DELETED IN REVISION 21 FIGURE 9-45 BLOCK FLOW DIAGRAM - DRAINAGE SYSTEM FIGURE 9-46 DELETED IN REVISION 21 FIGURE 9-47 STANDBY LIQUID CONTROL CORE P LINE FIGURE 9-48 SATURATION TEMPERATURE OF SODIUM PENTABORATE SOLUTION FIGURE 9-49 SODIUM PENTABORATE SOLUTION VOLUME CONCENTRATION REQUIREMENTS FIGURE 9-50 BORON REQUIREMENTS OF THE STANDBY LIQUID CONTROL SYSTEM FIGURE 9-51 DELETED IN REVISION 21 FIGURE 9-52 DELETED IN REVISION 21 FIGURE 9-53 DELETED IN REVISION 21 FIGURE 9-54 DELETED IN REVISION 21 FIGURE 9-55 DELETED IN REVISION 21 FIGURE 9-56 PREVENTION FIRE IGNITION FIGURE 9-57 MANAGE FIRE IMPACT FIGURE 9-58 LIMIT EXPOSURE TO FIRE FIGURE 9-59 DELETED IN REVISION 23 FIGURE 9-60 SYSTEM ACTIVATION LOGIC E FIGURE 9-61 SYSTEM ACTIVATION LOGIC F FIGURE 9-62 SYSTEM ACTIVATION LOGIC H FIGURE 9-63 SYSTEM ACTIVATION LOGIC I FIGURE 9-64 SYSTEM ACTIVATION LOGIC J FIGURE 9-65 SYSTEM ACTIVATION LOGIC K FIGURE 9-66 SYSTEM ACTIVATION LOGIC Q FIGURE 9-67 FIRE BRIGADE ORGANIZATION FIGURE 9-68 DELETED IN REVISION 21 FIGURE 9-69 DELETED IN REVISION 21 FIGURE 9-70 DELETED IN REVISION 21 FIGURE 9-71 DELETED IN REVISION 21 FIGURE 9-72 DELETED IN REVISION 21 FIGURE 9-73 DELETED IN REVISION 21 FIGURE 9-74 DELETED IN REVISION 21 FIGURE 9-75 DELETED IN REVISION 21 FIGURE 9-76 SINGLE LINE KEY AC LIGHTING DISTRIBUTION FIGURE 9-77 DELETED IN REVISION 21 FIGURE 9-78 DC SINGLE LINE EMERGENCY LIGHTING DISTRIBUTION

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-1 CHAPTER 9 FIGURES Page: 1 of 1 NEW FUEL STORAGE VAULT

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-2 CHAPTER 9 FIGURES Page: 1 of 1 Outline New Fuel Storage Rack

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-4 CHAPTER 9 FIGURES Page: 1 of 1 FUEL POOL MODULE ARRANGEMENTS

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-5 CHAPTER 9 FIGURES Page: 1 of 1 FUEL PREPARATION MACHINE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-6 CHAPTER 9 FIGURES Page: 1 of 1 CHANNEL GAUGING FIXTURE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-7 CHAPTER 9 FIGURES Page: 1 of 1 OUTLINE - CONTROL ROD (ORIGINAL EQUIPMENT DESIGN)

Revision: 24 UPDATED FSAR Figure: 9-8 AUXILIARY SYSTEMS CHAPTER 9 FIGURES Page: 1 of 1 SPENT FUEL POOL GRID STRUCTURE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-9 CHAPTER 9 FIGURES Page: 1 of 1 6 X 6 BWR RACK

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-10 CHAPTER 9 FIGURES Page: 1 of 1 PWR RACK

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-11 CHAPTER 9 FIGURES Page: 1 of 1 FUEL RACK LATCH ASSEMBLIES

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-12 CHAPTER 9 FIGURES Page: 1 of 1 SCHEMATIC OF TYPICAL HDFSS MODULE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-13 CHAPTER 9 FIGURES Page: 1 of 1 HDFSS MODULE SUPPORT SYSTEM

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-14 CHAPTER 9 FIGURES Page: 1 of 1 HDFSS MODULE SUPPORT SYSTEM DETAIL

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-15 CHAPTER 9 FIGURES Page: 1 of 1 Brunswick Fuel Pool Evaluation Case 1 -Batch Offload Starting at 190 hours0.0022 days <br />0.0528 hours <br />3.141534e-4 weeks <br />7.2295e-5 months <br />.

15 14 Heat Load, M Btu/hr 13 Previous Cycles 12 Current Cycle 11 10 Total 9

8 7

6 5

4 3

2 1

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Time, days after shutdown

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-16 CHAPTER 9 FIGURES Page: 1 of 1 Brunswick Fuel Pool Evaluation Case 2 -Full Core Offload Starting at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

40 Heat Load, M Btu/hr 35 30 25 20 Previous Cycles 15 Current Cycle 10 Total 5

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Time, days after shutdown

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-17 CHAPTER 9 FIGURES Page: 1 of 1 Brunswick Fuel Pool Evaluation Case 1 -Batch Offload Starting at 190 hours0.0022 days <br />0.0528 hours <br />3.141534e-4 weeks <br />7.2295e-5 months <br />.

160 Temperature, Deg F 150 140 130 No Accident 120 110 100 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Time, days after shutdown

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-18 CHAPTER 9 FIGURES Page: 1 of 1 Brunswick Fuel Pool Evaluation Case 2 -Full Core Offload Starting at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

150 145 Temperature, Deg F 140 135 130 125 120 No Accident 115 110 105 100 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Time, days after shutdown

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-19 CHAPTER 9 FIGURES Page: 1 of 1 Brunswick Fuel Pool Evaluation Case 1 -Batch Offload Starting at 190 hours0.0022 days <br />0.0528 hours <br />3.141534e-4 weeks <br />7.2295e-5 months <br />.

220 210 Temperature, Deg F 200 190 180 Start of Accident at 278 Hours 170 160 150 140 Loss of 1 FPCC Train 130 Total Loss of FPCC Sys 120 110 100 175 200 225 250 275 300 325 350 375 Time, hours after shutdown

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-23 CHAPTER 9 FIGURES Page: 1 of 1 REDUNDANT FEATURES OF REACTOR BUILDING CRANE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-24 CHAPTER 9 FIGURES Page: 1 of 1 REDUNDANT HOOK AND LOAD BLOCK

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-25 CHAPTER 9 FIGURES Page: 1 of 1 UPKICK LUG

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-26 CHAPTER 9 FIGURES Page: 1 of 2 TYPICAL 35 DAY OUTAGE WINDOW SCHEDULE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-26 CHAPTER 9 FIGURES Page: 2 of 2 TYPICAL 35 DAY OUTAGE WINDOW SCHEDULE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-30 CHAPTER 9 FIGURES Page: 1 of 1 SERVICE WATER PUMP DIMENSIONS

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-45 CHAPTER 9 FIGURES Page: 1 of 1 BLOCK FLOW DIAGRAM - DRAINAGE SYSTEM TO WASTE LABORATORY WASTES NEUTRALIZER SERVICE BUILDING TANK WAREHOUSE OIL FLOOR DRAINS AND SHOPS DETERGENT WASTE REUSE OILY WASTE DRAIN COLLECTOR IN SYSTEM PLANT SYSTEM SYSTEM CONTAMINATED SALT WATER OIL DRAINS RELEASE WASTE FLOOR NEUTRALIZER DRAIN SYSTEM SYSTEM SYSTEM RADWASTE BUILDING TURBINE BUILDING OILY DRAINAGE FROM SUMPS IN AND NEAR TURBINE BUILDING FUEL OIL STORAGE AREA MAKE-UP DRAINAGE WATER TREATMENT TURBINE-RADIOLOGICALLY GENERATOR CONTAMINATED LUBE OIL SUMP FUEL OIL NORMALIZING UNLOADING AREA TANK DRAINAGE DIESEL GENERATOR BUILDING TRANSFORMER PITS AUXILIARY BOILER HOUSE COOLING TOWER STORM SEWER SYSTEM BLOWDOWN EXTRACTION WELL RAINFALL RUNOFF SYSTEM PUMP FROM NPDES ORIGINAL BASIN YARD AND ROOF DRAIN DISCHARGE No. STABILIZATION OIL INTAKE 005 POND NPDES CANAL DISCHARGE SLUDGE No. 006 NPDES NPDES DISCHARGE NPDES DISCHARGE No. 012 DISCHARGE No. 001 NEW No. 004 DISCHARGE CONDENSER INTAKE STABILIZATION CANAL UNITS 1 AND 2 CANAL NPDES POND DISCHARGE SANITARY No. 002 TREATMENT

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-47 CHAPTER 9 FIGURES Page: 1 of 1 STANDBY LIQUID CONTROL CORE P LINE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-48 CHAPTER 9 FIGURES Page: 1 of 1 SODIUM PENTABORATE SOLUTION 100 90 80 Temperature (°F) 70 60 50 40 30 8 9 10 11 12 13 14 15 16 17 18 19 20 Concentration (% by weight)

Saturation Saturation plus 5°F

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-49 CHAPTER 9 FIGURES Page: 1 of 1 SODIUM PENTABORATE SOLUTION VOLUME CONCENTRATION REQUIREMENTS 11 SLC Solution Concentration (% by weight) 10 9

8 2000 2500 3000 3500 Net Tank Volume (gallons)

Allowable operating range Low Level Alarm High Level Alarm

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-50 CHAPTER 9 FIGURES Page: 1 of 1 BORON REQUIREMENTS OF A TYPICAL STANDBY LIQUID CONTROL SYSTEM

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-56 CHAPTER 9 FIGURES Page: 1 of 1 PREVENTION FIRE IGNITION

Revision: 24 UPDATED FSAR Figure: 9-57 AUXILIARY SYSTEMS CHAPTER 9 FIGURES Page: 1 of 1 MANAGE FIRE IMPACT

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-58 CHAPTER 9 FIGURES Page: 1 of 1 LIMIT EXPOSURE TO FIRE

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-60 CHAPTER 9 FIGURES Page: 1 of 1 SYSTEM ACTIVATION LOGIC E

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-61 CHAPTER 9 FIGURES Page: 1 of 1 SYSTEM ACTIVATION LOGIC F

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-62 CHAPTER 9 FIGURES Page: 1 of 1 SYSTEM ACTIVATION LOGIC H

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-63 CHAPTER 9 FIGURES Page: 1 of 1 SYSTEM ACTIVATION LOGIC I

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-64 CHAPTER 9 FIGURES Page: 1 of 1 SYSTEM ACTIVATION LOGIC J

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-65 CHAPTER 9 FIGURES Page: 1 of 1 System Activation Logic K

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-66 CHAPTER 9 FIGURES Page: 1 of 1 SYSTEM ACTIVATION LOGIC Q

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-67 CHAPTER 9 FIGURES Page: 1 of 1 FIRE BRIGADE ORGANIZATION

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-76 CHAPTER 9 FIGURES Page: 1 of 1 SINGLE LINE KEY AC LIGHTING DISTRIBUTION

UPDATED FSAR Revision: 24 AUXILIARY SYSTEMS Figure: 9-78 CHAPTER 9 FIGURES Page: 1 of 1 DC SINGLE LINE EMERGENCY LIGHTING DISTRIBUTION