05/16/1978 Letter Licensee Event Report
ML18219B530
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/16/1978
From: Shaller D
American Electrtic Power System, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: James Keppler
NRC/IE, NRC/RGN-III
References
LER 1978-025-03L
Download: ML18219B530 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-316 REC: KEPPLER J G ORG: SHALLER D V DOCDATE: 05/16/78 NRC IN 5 MI PWR DATE RCVD: 05/22/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 1 FORWARDING LICENSEE EVENT REPT (RO 50-316/78-025) ON 04/15/78 CONCERNING SURVEILLANCE TESTING OF THE CD EMERGENCY DIESEL GENERATOR AS REQUIRED BY TECH SPEC 4. 8. i. 1. 2. WAS NOT PERFORMED DUE TO OPERATOR THOUGHT THE TEST SCHEDULE WAS IN ERROR.

PLANT NAME: COOK UNIT 2 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NOTES:

1. SEND 3 COPIES OF ALL MATERIAL TO ISE INCIDENT REPORTS (DISTRIBUTION CODE A002)

FOR ACTION: ~RCI lIEF RNI etmN/4 ENCL INTERNAL: NRC PDR4+W/ENCL MIPC++W/3 ENCL

'PPOL I TO++M/ENCL HOUSTON~4W/ENCL NOVAK/CHECK++W/ENCL EEB++W/fNCL KNIGHT<<W/ENCL BUTLER+4W/ENCL HANAUER++W/ENCL TEDESCO++W/ENCL E I SENHUT+4 W/ENCL BAER~~W/ENCL SHAO++W/ENCL VOLLMER/BUNCH++W/ENCL KREGER/J. COLLINS+~W/ENCL ROSA+4W/ENCL K SEYFRIT/IE+4t W/ENCL EXTERNAL: LPDR S ST. JOSEPHr MI+4'W/ENCL TI C++W/ENCL NSI C++W/ENCL ACRS CAT B4+W/16 ENCL COPIES NOT SUB~IITTED PER REGULATORY GUIDE 10.1 DISTRIBUTION: LTR 45 ENCL 45 CONTROL NBR: 781440044 SIZE: 1P+ iP

<4 44 +4 44 4 4 +++4 +4 +4 +444 44F444444 4F4F4F44. THE END

+t gp 4+4 44 %4%44 %4%%4 4+%444444<+4'++<4+4<

~ ~'

k

gb,mellon r;:;~DI4N DONALD

& Ic Ie NPONE4 C. COOK NUCLEAR COMP N PLANT P.O. Box 458, Bridgman, Michigan 49106 May 16, 1978 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating.:L'i'cense DPR-74 Docket No.'0-316

Dear Mr. Keppler:

4I Pursuant to the requirements of the Appendix A Technical Specifications the following report is submitted:

RO 78-025/03L-O.

Sincerely, D.Y. Shaller Plant Manager

/bab cc: J.E. Dolan R.W. Jurgensen R.F. Kroeger R. Kilburn R.J. Yollen BPI K.R. Baker RO:III R.C. Callen MPSC P.W. Steketee, Esq.

R. Walsh, Esq.

G. Charno'ff,, Esq, G. Olson J.M. Hennigan PNSRC J.F. Stietzel Dir., IE (30 copies)

Dir., MIPC (3 copies)

NRC FORM 366 U.S. NUCI.EAR REGULATORY COMMISSION

{7-77) ~

LICENSEE EVENT REPORT

~P CONTROL BLOCK: \ Q1 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I 6

~oq H I D C C 2 Q20 0 0 0 0 0 0 0 0 0 0 Q34 I I I I QNL-L-JQE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 7 8 9 LICENSEE CODE CON'T

~RT,oos LL-IO 0 5 0 0 0 3 I 6 68 QT 69 0 4 I EVENT DATE 5 7 8 74 Qs 0 75 5 I 5 REPORT DATE 7 8 Q 8 60 61 DOCKET NUMBER EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10

~o 2 WITH THE UNIT IN NODE I OPERATION SURVEILLANCE TESTING OF THE CD EMERGE

~NCY ITIN ATO A till YTNC IAIN C CIIYONCN.YY.

AS NOT PERFORMED. THERE ARE NO PROBABLE CONSEQUENCES.

~OS

~OB

~OS 80 7 89 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENTCODE SUBCODE SUBCODE

~OB ~EE 10 QTT A Q>> ~AQ>> Z Z Z Z Z Z QN ~ZQ'5 ~ZQ'5 7 8 9 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION QTT LFR/RP REPoRT ACTION FUTURE EVENTYEAR

~78 21 22 EFFECT

+

23 SHUTDOWN

~02 24 REPORT NO.

5 26 QW 27 ATTACHMENT

~03 28 CODE 29 NPRDQ TYPE

+L 30 PRIME COMP.

L=I 31 NO.

32 0

COMPONENT TAKEN ACTION ONPLANT METHOD HOURS +22 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER 33 S~QTR 34 gJQ28 35 .

~Q 36 37 0 0 0 5 40

+NQ23 41

~NQ24 42

~ZQ25 43 44 Z 9 9 9Q28 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o THE TEST WAS NOT PERFORMED WHEN THE OPERATOR THOUGHT." THE TEST SCHEDUL 4

WAS IN ERROR. THE TEST HAD BEEN PERFORMED THE SAME WEEK AND IT IS LLY A 31 DAY INTERVAL. WHEN THE TEST WAS SCHEDULED 3 DAYS LATER THE OPE '.

3 RATOR REALIZED THIS ENGINE REQUIRED TEST EACH 3 DAYS. ALL OPERATORS HAV 4 E BEEN INSTRUCTED TO GET CONCURRENCE TO DELETE FROM THE TEST SCHEDULE 7 8 9 80 FACILITY STATUS  % POWER OTHERSTATUS Q METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32 5 E Q28 ~Q4 GQ28 44 45 Q31 OP ERATOR OBSERVATI ON 80 7 8 9 10 12 13 46 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITY Q LOCATION OF RELEASE Q 6 ~Z Q33 ~ZQ34 NA 7 8 9 10 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE ~ DESCRIPTION Q39

~l7 ~00 0 S~EQ38 13 NA 80 7 8 9 11 12 PERSONNEL INJURIES 8 ~00 0 QoNA 80 7 8 9 11 12 LOSS OF OR DAMAGE,TO FACILITY TYPE DESCRIPTION Q43 Z Q42 NA 7 8 9 10 80 PUBLICITY NRC USE ONLY ISSUED DESCRIPTION ~S a O uNQ44 NA 7 8 9 10 68 69 80

/L 0 NAME OF PREPARER

"-.'.. ~ . S; LEASE (616) 465-59O1