MONTHYEARML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML22320A5592022-11-16016 November 2022 2022 Annual Report - Guarantees of Payment of Deferred Premiums ML21307A0542021-11-0202 November 2021 Annual Report - Guarantees of Payment of Deferred Premiums ML21272A2772021-09-29029 September 2021 Update to Application for Order Approving License Transfers and Proposed Conforming License Amendments ML21225A0062021-08-13013 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev.1 and NSAL-15-1, Rev. 0 ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments NMP1L3371, Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-102021-02-10010 February 2021 Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10 ML20310A1152020-11-0404 November 2020 Annual Report - Guarantees of Payment of Deferred Premiums ML19318G1702019-11-14014 November 2019 2019 Annual Report - Guarantees of Payment of Deferred Premiums ML18316A0032018-11-0707 November 2018 Submittal of 2018 Annual Report - Guarantees of Payment of Deferred Premiums ML18011A6242018-01-0808 January 2018 R. E. Ginna, Unit 1, Submittal of Annual Report of the Nuclear Advisory Committee ML17010A0772017-01-19019 January 2017 Submittal of Annual Report of the Nuclear Advisory Committee ML16039A3032016-01-26026 January 2016 Transmittal of Radiological Emergency Implementing Procedure Revisions ML14321A7052014-11-14014 November 2014 2014 Annual Report - Guarantees of Payment of Deferred Premiums RS-14-160, Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package2014-07-0202 July 2014 Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package ML14118A1412014-03-28028 March 2014 Independent Spent Fuel Storage Installation, Nine Mile Point Independent Spent Fuel Storage Installation, R.E. Ginna Independent Spent Fuel Storage Installation, Response to Request for Affidavit Supporting Request for Designation Of. ML0428601382004-09-30030 September 2004 R. E. Ginna - Fracture Mechanics Analysis Per GDC-4 ML18143A0301978-04-26026 April 1978 R. E. Ginna - Request for Exemption from the Requirements of 10 C.F.R. Section 50.46 and 10 C.F.R. 50 Appendix K ML18142B9471978-01-0606 January 1978 R. E. Ginna - Letter Transmitting 3 Signed Originals and 19 Copies of Document Entitled, Application for Amendment to Operating License. 2023-11-10
[Table view] Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
'o.F503 NRCPoRM 19!i UAo NUCLEAR REGULATORY COMMISSION OOC T NUM R i'2 is)
FILE NUMBER NRC DISTRIBUTION FGR PART 50 OOCKET MATERIAL
'O". FRQMI OATS OF DOCUMENT Leboeuf, Lamb, Leiby & MacRae 1/6/78 Mr. Edson G+ Case Mashington, D. C OATS RECEIVED LeBoeuf Lamb Leib & MacRae 1/9/78 QNOTORI2EO PROP INPUT FORM NUMBER OF COPIES RECEIVED ORIG INAI QUNCLASSIPIED COPY
'ESCRIPTION ENCLOSURE Requesting withholding pursuant ~.'I',o to Section 2+790i ~ ~ Liceaaa No DPR-18 Appl for Amend: tech nosed chanae concerning operation specs pr cra~c of the W~icilj.
z.n Eonnection with the commencement of Fuel Cycle 8~ iw/att II Affidavit~ notorized'X2j.'2gj)7 ' ,and
~
entitled "Ri ED Ginna Reload Fuel Design" re~
g/ XN-NF-77<<52 (P) ~ ~ ~ ~ ~ ~ ~
pQ pg (2-P) (3-P )+(1" )
RJL PLAhZ NAME: Ro Eo Ginna 1 1/9/78 EV ON P'0 SW O'IIqe pP/
I C1 AF - ec'g 8 C Kc ek SAZZZY FOR ACTION/INFORMATION BRANCH CHIEF: 7 INTERNAL 0 ISTRI SUTION It ~ l Ig a <<
I . g <<C I Q. iI T <<Q EXTERNAL OISTRIBUTION CONTROL NUMBER f PDR:
ZIC ~
NSIC <<
gCRS 1 GYS SEZZ CATE R .
zsoos'oi2y l'
t 0 E"'
Ai
"~ 'I
DOCKET NO DATE:
NOTE TO 'ND/OR LOCAL PUBLIC DOCUMENT ROOMS The following item submitted, with letter dated 4 78 from being withheld from public disclosure,, pending review, in .accordance with Section 2.790.
PROPRIETARY EVOCATION 5k- .E
4 jV )
Eg l.
LEBOEUF, LAMB, LEIBV 8, MACRAE 1757 N STREET, N.W.
WAsHINGToN, D. C. 2OQ36 TELEPHONE tct CAQLK ADDAEQQ LEON A ALLCN, JR. CAMCRON F MAcRAE Q D RANDALLJ LQSDEUF,JA. IQtQ IQTS LEQWIMIWASHINGTDN,D,C JOSCPH C BACHELDER III CAMKRON F M*cRAE,IIIQ ADAIAN C LKIBY IQSt IQIS CRNCST S BALLARD,JIL GCRARD A MAHER TELEXI QQOtIQ O. S. PCTCR BERGLN + SHCILA H. MARSHALL GCOFFRY D.C BCST JAMLS G. MCELROY DAVID P. DICKS JAMES P MCGRANCRY,JRP ~ OP COVNQCL TAYLOR R, BRIOOS PHILIP PALMER MCOUIOAN CHARLES N. BURGER JAMES O'ALLEY JR.Q AAVIN C UPTON THOMAS E BURKE ~ J. MICHAEL PARISH OGER D. FCLDMAH Q JOHN A.RVDY VOCNC R. FIDELL Q PAUL G. RUSSELL JACOB FRIEDLANDCR HAROLD M. SCIDCL DONALD J OREENL CHARI,CS P, SIFTON IQO QAOADWAY JAMKS A. GRCCReII Q HALCYON O. SKINNER JOHN L.OAOSC 4 JOSFPH S. STRAUSS NEW YDAK, N.Y. IODOS DOUGLAS W.HAWKS CARL D.HOBCLMAN MICHAEL IOVENKO +'
SAMUCI. M,SUDDEN EUGENE 8. THOMAS, JR. Q January 6, 197 TELEPIIDNE tlt tdQ IIDD JAMES F. JOHNSONo LKONARD M TROSTEN 4 CABLE ADDAESS RONALD D.JONES HARRY H VOIOTi4 LEX K.LARSONQQ H RICHARD WACHTEL LEQWIN~ NEW YORK GRANT S.LEWIS OCRARO P WATSON TELEX: QttQIS RESIDENT PARTNERS WASHINGTON OFFICC Q ADMITTED TO THC DISTRICT OF COLUMBIA BAR Pm. >978~
Mr. Edson G. Case eZI Acting Director mme~
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Rochester Gas and Electric Corporation R. E. Ginna Nuclear Power Station, Unit No. 1 Docket No. 50-244
Dear Mr. Case:
As counsel for Rochester Gas and Electric Corporation,,
we hereby transmit three (3) signed originals and nineteen (19) copies of a document entitled, "Application for Amendment to Operating License." This Application seeks to amend the Technical Specifications set forth in Appendix A to Provisional Operating License No. DPR-18 to permit operation of the Ginna plant in connection with the commencement of Fuel Cycle 8.
The proposed technical specifications changes are set forth in Attachment A to this Application, and a safety evaluation is set forth in Attachment B. Forty (40) copies of these two documents are transmitted herewith.
Attachment B references a report XN-76-40 and Addendum.
That report 'is a topical report which was submitted to the NRC by Exxon Nuclear Company in February 1977. Attachment B also refers"to a report entitled HR. E. Ginna Nuclear Plant Cycle 8 Safety Analysis Report - December 1977" prepared by Exxon Nuclear Company, Inc. (XN-NF-77-53). Forty (40) copies of that, report are supplied herewith.:
The report XN-NF-77-53 references in turn three other reports prepared by Exxon Nuclear Company, as follows:
- 1. XN-NF-77-40, "Plant Transient Analysis for the R. E. Ginna Unit 1 Nuclear Power Plant,"
November 1977;
- 2. 'N-NF-77-58, "ECCS Analysis for the R. E.
Ginna Reactor with ENC NREM-2 PWR Evaluation Model" December 1977; r
- 3. XN-NF-77-52 (P)., "R. E. Ginna Reload Fuel De-sign," December 1977.
Forty (40) copies of each of these reports are also trans-mitted with this letter. XN-NF-77-52(P), listed above as item (3), contains information of a proprietary and confi-dential nature to Exxon Nuclear Company, Inc. Accordingly, the Applicant requests that. XN-NF-77-52(P) be withheld from public disclosure in accordance with Sections 2.790 and 9.5 of the Commission's regulations. The basis for our request.
for confidential treatment is set forth in detail in the enclosed affidavit of Roy Nilson, sworn to on December 22, 1977.
Finally, a Certificate of Service is also enclosed.
Very truly yours,
~ <Q~g/,~,.u, LeBoeuf, Lamb, Leiby & MacRae Attorneys for Rochester Gas and Electric Corporation
AFFIDAVIT m
STATE OF Washington ss ~
COUNTY OF Benton I, Roy Nilson, being duly sworn, hereby say and depose:
- l. I am Manager, Quality Assurance and Licensing, for Exxon Nuclear Company, Inc. ("ENC") and as such I am authorized to execute this Affidavit.
- 2. I am familiar with ENC's detailed document control system and policies which govern the protection and control of information.
- 3. I am familiar with the document entitled XN-NF-77-52 (P),
"R. E. Ginna Reload Fuel Design", referred to as "Document". Information contained in this Document has been classified by ENC as proprietary in accordance with the control system and policies established by ENC for the control and protection of information.
- 4. The Document contains information of a proprietary and confidential nature and is of the type customarily held in confidence by ENC and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in the Document as being proprietary and confidential.
- 5. The Document has been made available to the United States Nuclear Regulatory Commission in confidence, with the request that the information contained in the Document not be disclosed or divulged.
- 6. The Document contains information which is vital to a competitive advantage of ENC and would be helpful to competitors of ENC when competing with ENC.
- 7. The information contained in the Document is considered to be proprietary by ENC because it reveals certain distinguishing aspects of fuel design and fuel design methods which secure competitive economic advantage to ENC by design optimization and improved marketability, and includes information utilized by ENC in its business which affords ENC an opportunity to obtain a competitive advantage over its competitors who do not or may not know or use the information contained in the Document.
- 8. The disclosure of the proprietary information contained in the Document to a competitor would permit the competitor to reduce its expenditure of money and manpower and to improve its competitive position by giving it extremely valuable insights into ENC's analysis, testing, design and manufacturing procedures and would result in substantial harm to the competitive position of ENC.
- 9. The Document contains proprietary information which is held in confidence by ENC and is not available in public sources.
l0. In accordance with ENC's policies governing the protection and control of information, proprietary information contained in the Docu-ment has been made available, on a limited basis, to others outside ENC I
only as required and under suitable agreement providing for non-disclosure and limited use of the information.
ll. ENC policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis. Checks are made routinely to assure the policy procedures are being met.
- 12. This Document provides a composite of a major portion of the mechanical fuel design technology developed by ENC over the past several years. ENC has invested several million dollars and many man-years of effort in developing this information. Assuming a competitor had available the same background data and incentives as ENC, the competitor might, as a minimum cost, develop the information for the same expenditure of manpower and money as ENC.
- 13. Based on my experience in the industry, I do not believe that the background data and incentives of ENC's competitors are sufficiently similar to the corresponding background data and incentives of ENC that it is reasonable to expect such competitors would be in a position to duplicate ENC's proprietary information contained in the documents.
THAT the statements made hereinabove are, to the best of my knowledge, information, and belief, truthful and(,complete.
FURTHER AFFIANT SAYETH NOT SWORN TO AND SUBSCRIBED before me this WA day of
~, 19/ N.
NOTARY PUBS IC
~ ~
1 I
,t t q1
'I