MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating ML18153B0061994-07-14014 July 1994 Proposed Tech Specs Changes Will Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18152A1821994-06-0909 June 1994 Proposed TS Re Chemical & Vol Control Sys & Safety Injection Sys ML20065P6111994-04-19019 April 1994 Proposed Tech Specs,Modifying Control Rod Movement Surveillance Frequency ML18153A8821994-02-25025 February 1994 Proposed Tech Specs Modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys ML18153B4321993-12-27027 December 1993 Proposed Tech Specs Reflecting Revised Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B4081993-12-10010 December 1993 Proposed Tech Specs,Establishing Upper Limit on Allowable COLR Mtc Values ML18153B4021993-12-10010 December 1993 Proposed Tech Specs,Modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 & NUREG-1431 ML18153B4051993-12-10010 December 1993 Proposed Tech Specs,Updating Augmented Insp Program for Sensitized Stainless Steel by Incorporating Newer Code Requirements,While Maintaining Augmented Insp Philosophy ML18153B3751993-11-15015 November 1993 Proposed Tech Specs Implementing Revised 10CFR20,revising Frequency Radiological Release Repts from Semiannual to Annual & Clarifying Site Maps ML18153B3501993-10-19019 October 1993 Proposed Tech Specs for RSHX Svc Water Outlet Radiation Monitors ML18153B3321993-09-29029 September 1993 Proposed Tech Specs Modifying Required Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Be Performed Concurrent W/Disk & Hub Insp ML18152A0481993-07-20020 July 1993 Proposed Tech Specs Deleting Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3921993-07-16016 July 1993 Proposed Tech Specs for Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18152A0461993-07-16016 July 1993 Proposed Tech Specs Implementing Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from semi-annual to Annual,& Clarify Site Maps ML18152A4511993-07-0202 July 1993 Proposed Tech Specs to Include COLR Which Presents reload- Specific Limits for Key Core Operating Parameters ML18153D3811993-07-0202 July 1993 Proposed TS Table 4.2-1 Re Miscellaneous Insps & Sensitized Stainless Steel Exams ML18153D3331993-05-0606 May 1993 Proposed Tech Specs Supporting Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12 1999-08-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20199B0711998-01-0505 January 1998 Rev 0 to NE-1148, Surry Unit 2,Cycle 15 Startup Physics Test Rept ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML20210J5031997-07-31031 July 1997 Rev 0 to NE-1132, Surry Unit 1,Cycle 15 Startup Physics Tests Rept ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18151A9761996-08-13013 August 1996 Cycle 14 Startup Physics Test Rept. W/960830 Ltr ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18152A4701996-06-13013 June 1996 Cycle 13 Control Rod Performance Test Results. ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18152A0571995-12-20020 December 1995 Startup Physics Test Rept,Surry Unit 1,Cycle 14. W/960111 Ltr ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML20083C9951995-05-0808 May 1995 Rev 0 to Surry Unit 2,Cycle 13 Startup Physics Tests Rept ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating 1999-08-06
[Table view] |
Text
e ATTACHMENT 1
- --- . - -- - --- ~-- - -----
8306170331 830614 PDR ADOCK 05000280 P PDR
e 3.21 Fire Protection Features
- TS 3.21-1 Applicability Applies to the operating status of the Fire Protection Features.
Objective To define those conditions of the Fire Detection, Suppression Systems, and other fire protection features necessary to insure safe reactor operations.
These conditions relate to: Fire Detection Systems, Plant Fire Suppression Water System, Plant Spray and/or Sprinkler Systems, Plant CO 2
Systems, Plant Halon System, Plant Fire Hose Stations, Plant Fire Barrier Penetration Fire Seals and Yard Fire Hydrants.
Specifications:
A. Fire Protection Features
- 1. Fire Detection - the fire detection instrumentation for each fire detection zone shown in Table 3.21-1 shall be operable.
- 2. Fire Suppression Water System - shall be operable as defined below:
- a. Two 2,500 gpm fire pumps
- b. Automatic initiation logic for each fire pump
- c. Two fire water tanks, each containing at least 250,000 gallons reserved for fire protection
- d. The necessary piping and valves to insure that fire water is available, upon demand, to the spray and sprinkler systems, fire hose stations, and yard fire hydrant and hydrant hose houses.
-~----~--~- -~---
- 3. Spray and Sprinkler System - that provide protection for the cable tunnel and cable vault shall be operable
- 4. Low Pressure co 2 Storage Tank - shall be operable with a minimum level of 75% and a minimum pressure of 275 psig.
- s. Low Pressure co 2 System - shall be operable to the extent that when equipment in the below listed areas is required to be operable, fire suppression can be provided upon demand.
- a. Cable tray rooms
- b. Cable tunnels
- c. Cable vaults
- d. Safety related charcoal filter banks 3A and 3B
- e. Emergency diesel generator rooms
- 6. High Pressure co 2 System - shall be operable to the extent that wheri equipment in the below listed areas is required to be operable, fire suppression can be provided upon demand. The minimum level of High Pressure co 2 system shall be 90% by weight.
- a. Fuel oil storage tank room for emergency service water pumps
- b. Fuel oil transfer pump rooms for emergency diesel generators
- 7. Halon System - shall be operable for station records storage vault.
The storage tanks shall be at least 95% of full charge weight and 90% of full charge pressure.
- 8. Fire Hose Stations - the hose stations listed in Table 3.21-2 shall be operable when equipment in the areas served by the hose stations is-reqtlired to be operable.
- 9. Yard Fire Hydrant and Hydrant Hose Houses - as listed in Table 3.21-3 shall be operable when equipment or structures served by the hydrant or hose house is required to be operable.
- 10. Fire Barrier Penetration Fire Seals - protecting safety related areas shall be functional.
B. Specifications 3.21.A.1 through 3.21.A.10 may be modified as described below provided immediate attention is directed to making repairs.
- 1. With the number of operable fire detection instruments less than required by Specification 3.21.A.1.
- a. Restore the inoperable instruments to an operable status within 14 days, or
- b. Establish a fire watch patrol to inspect the zone with the inoperable instruments at least once per hour.
- 2. Specification 3.21.A.2 (Fire Water Suppression System)
- a. With less than required equipment:
(1) Restore the inoperable equipment to an operable status, within 7 days, or provide an alternate means to accomplish the inoperable function.
- b. With no Fire Suppression Water System, establish a backup Fire Suppression Water System within 24-hours.
- 3. Specification 3.21.A.3 (Spray and Sprinkler Systems) - with a sprinkler system inoperable establish a continuous fire watch, with backup fire suppression equipment, for the unprotected areas within 1 *lwur:
e 3.21 Fire Protection Features (continued)
- 4. Specification 3.21.A.4, 3.21.A.5, 3.21.A.6, 3.21.A.7 (CO and 2
Halon Systems) - with one or more of the required systems inoperable establish a continuous fire watch, with backup fire suppression equipment, for the unprotected area(s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
- 5. Specification 3.21.A.8 (Fire Hose Station) - with one or more of the fire hose stations listed in Table 3.21-2 inoperable, route an additional equivalent capacity fire hose to the unprotected area(s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. If the inoperable hose station is not the primary means of fire suppression for the affected area, then the above actions are to be completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 6. Specification 3.21.A.9 (Fire Hydrants and Hose Houses) - with one or more of the yard hydrants or associated hydrant hose houses listed in Table 3.21-2 inoperable, locate sufficient additional lengths of hose in an operable hose house to provide service to the unprotected area(s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. If the inoperable hydrant or associated hydrant hose house is not the primary means of fire suppression for the affected area, then the above actions are to be completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
7r- -Specification 3.21.A.10 (Fire Barriers) - with one or more fire barrier penetrations non-functional, establish a continuous fire watch on at least one side of the non-functional fire barrier within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
C. The requirements of Specification 3.0.1 are not applicable.
--~---
\
Bases
- TS 3.21-5 Fire Detection Instrumentation Operability of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages. Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program.
In the event that a portion of the fire detection instrumentation is inoperable, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is returned to service.
Fire Suppression Systems The operablity of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, co 2 , Halon, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
In the everif"-tnat the fire suppression water systems are inoperable, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.
~ - -----=- - ---~-~ - - - -
e
- TS 3.21-6 Fire Barrier Penetration Seals The functional integrity of the fire barrier penetration seals ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the pos-sibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment. The fire barrier penetration seals are a passive element in the facility fire protection program and are sub-ject to periodic inspections. :
During periods of time when the seals are not functional, a continuous fire watch is required to be maintained in the vicinity of the affected seal until the seal is restored to functional status
- r INSTRUMENT LOCATION e TABLE 3 .'21-1 FIRE DETECTION INSTRUMENTS
- TS 3.21-7 MINIMUM INSTRUMENTS OPERABLE Heat Smoke
- 1. Containment (Reactor Coolant Pumps Only)*** 1 per RCP
- 2. Containment Cable Penetration Area 4
- 3. Containment Recirculation Air System 1
- 4. Cable Tray Room 3 4
- 5. Cable Tunnel 2 3
- 6. Cable Vault Area Lower Area 1 2 Upper Area 1 1
- 7. Charcoal Filter Banks 1 per bank
- 8. Emergency Diesel Generator Room 1 per room
- 9. Fuel Oil Tank Room (river) l** 1
- 10. Fuel Oil Transfer Pump Houses 1 per house**
- 11. Control Room 4
- 12. Emergency Switchgear Room 3
- 13. Auxiliary Building General Area 12
- 14. Auxiliary Building Charging Pump Cubicles 1 per cubicle
- 15. Main Steam Valve 'House 3
- 16. Safeguards Area 1
- 17. Fuel Building 1
- 18. Fire Pump Building 2
- 19. Mechanical Equipment Room 113 1
- 20. Battery Room IA 1
- 21. Battery Room lB 1
- 22. Bat tery""'Rcfom 2A .1
- 23. Battery Room 2B 1
- Rate of rise actuation devices for high pressure co 2 system
- One heat detector installed per pump. RCP pump bearing and motor temperature will be monitored once per hour if the RCP heat detector is inoperable.
r *e TABLE 3.21-2
- TS 3.21-8 FIRE HOSE STATIONS STATION NUMBER LOCATION SIZE
- a. 37-51, 41A Auxiliary Building 1 1/2"
- b. 52, 53 Fuel Building 1 1/2"
- c. 12, 16, 20, 21A, 22 Turbine Building 1 1/2" 23, 33, 34, 54, 55, 56, 57
- d. 75-87 Unit 1 Containment 1 1/2"
- e. 60-72 Unit 2 Containment 1 1/2"
- These hose stations are designed to be dry and shall be operable when the main shutoff valves in the auxiliary building are opened .
. ,..,. . ~,,. .,.
- - ~ - - = =--= =a..,,___ - -
- - - =------ - - - -=- - --- - -
. TS 3.21-9 TABLE 3.21-3 YARD FIRE HYDRANT AND HYDRANT HOSE HOUSES HOSE HOUSE NO. HYDRANT VALVE NO. LOCATION 1 l-FP-154 North of Condensate l-FP-155 Polishing Building l-FP-156 2 l-FP-66 Between Boron Recovery l-FP-67 Tanks and Fuel Oil l-FP-68 Storage 5 l-FP-82 Alleyway South of l-FP-83 Unit 1 Containment l-FP-84 9 l-FP-50 South of Unit 2 l-FP-51 Main Transformers Side l-FP-52 11 l-FP-62 East of Unit 2 l-FP-63 Containment, Next l-FP-64 To Underground Condensate Tank 12 l-FP-59 West of Unit 2 l-FP-60 Containment in l-FP-61 Alleyway Outside Health Physics