ML18068A467

From kanterella
Jump to navigation Jump to search
Summarizes Results of Safety Related Piping Reverification Program Work Completed Prior to End of 1998 Refueling Outage & Reports Completion of Program
ML18068A467
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/16/1998
From: Haskell N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9810260072
Download: ML18068A467 (5)


Text

!

- I

j

. f*

A CMS Energy Company Palisades Nuclear Plant Tel: 616 764 2276 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 Nathan L. Haslcsll Director. Licensing October 16, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT SAFETY RELATED PIPING REVERIFICATION PROGRAM - FINAL STATUS REPORT The Safety Related Piping Reverification Program (SRPRP) was initiated to reverify the seismic design adequacy of large bore {> 2" nominal diameter) piping systems. The scope consists of physical walkdowns of accessible piping and pipe supports, analyses for both piping and supports to current design criteria, and implementation of required modifications.

The purpose of this report is to summarize the results of the program work completed prior to the end of the 1998 refueling outage and to report the completion of the program.

Scope Phase I of the program consisted of reverification of 18 piping stress packages containing approximately 300 pipe supports. Phase I was completed in October 1992.

The results of this portion of the program were transmitted to the NRC in a letter dated October 30, 1992.

Phases llA and 118 consisted of reverification of 13 piping stress packages containing 271 pipe supports. Phases llA and 118 were completed in September 1993. The results of this portion of ~h,e ~rpgr&m were transmitted to the NRC in a letter dated September 30, 1993. ::.. 1.__.., *J J .l J .

( 9810260072 9810161 I l PDR ADOCK 05000255 I p f'~J_

2 Phase llC of the program consisted of 21 piping stress packages containing 755 pipe supports. Walkdowns for the Phase llC effort were completed during the 1992 refueling outage in October 1992. Analytical work and installation of required modifications were completed as plant conditions permitted. The last modifications required by Phase llC were completed during the 1995 refueling outage which ended in August, 1995.

Phase 110 was the final phase of the SRPRP program consisting of 25 piping stress packages. Six of the Phase 110 stress packages, which included 181 pipe supports, were completed during the 1996 refueling outage which ended in December 1996. The results of these six packages were reported in a February 14, 1997, submittal. The remaining 19 stress packages were completed prior to the 1998 refueling outage. summarizes the number of SRPRP modifications made for each of the 19 remaining Phase 110 stress packages completed in 1998.

Summary Reanalysis and the modifications for the SRPRP for all of the large bore safety related piping systems are now complete.* This program is therefore considered to be closed;

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments. In addition, all commitments made related to the SRPRP project have now been completed.

D rector, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC

  • NRC Resident Inspector - Palisades Attachment

ATTACHMENT 1 CONSUMERS ENERGY COMPANY PALISADES PLANT DOCKET 50-255 SAFETY RELATED PIPING REVERIFICATION PROGRAM FINAL STATUS REPORT 2 Pages

List of SRPRP Phase 110 Modifications IStress Package No. ISC Package No. IHanger No. IDescri~tion of Modification SP-03323 N/A See Note 1 N/A SP-03326 SC-97-008 HC1-H124 Add new 2-way restraint HC23-H8 Change from a spring hanger to a rigid deadweight hanger See Note 2 N/A HC2-H168.1 Remove support entirely HC2-R168.2 Change from a lateral only hanger to a 2-way restraint HC2-H1A Change from spring hanger to a 2-way restraint HC2-H1.1A Add new spring hanger HC2-H2A Remove support entirely HC2-H2.1A Add. new vertical restraint (gang -

hanger with HCC 136-H2.1)

HCC 136-H2 .1 Add new 2-way restraint SP-03331 SC-97-011 HB26-H1 .1 Remove existing deadweight hanger SP-03332 N/A See Note 2 N/A SP-03339 SC-97-013 HB1-H18.1 Remove support entirely HB1-H20 Change from deadweight hanger to a 3-way restraint HB1-H21 Modify existing 2-way See Note 2 N/A HC2-H163 Modify existing 2-way restraint HC2-H165 Change from a spring hanger to a rigid deadweight-hanger See Note 2 N/A 1

List of SRPRP Phase 110 Modifications Stress Packa e No. SC Packa e No. Han er No. Descri tion of Modification SP-03354 N/A See Note 2 N/A SP-03355 N/A See Note 2 NIA SP-03357 N/A See Note 2 N/A SP-03377 N/A See Note 1 N/A SP-03381 N/A See Note 2 N/A SP-03390 SC-97-004 HC1-H52 Modify existing 2-way restraint SP-07015 SC-97-046 HB30-H3 Modify existing 6-way anchor type support to a deadweight only type support HB30-H4 Add new 2-way restraint HB30-H6 Add new 2-way restraint HB30-H7 Add new 2-way restraint HB30-H8 Add new 2-way restraint (gang hanger with HB30-H4)

HB30-H10 Add new 2-way restraint (gang hanger with HB30-H6)

HB30-H11 Add new 2-way restraint (gang hanger with HB30-H7)

Note 1: SP-03323 and 03377 are part of the original SRPRP Phase llD scope. As part of the current Improved Technical Specification Project, these systems will not have to be considered safety-related.

Note 2: This is a SRPRP Phase llD package where no modifications were necessary.

2