ML18067A693

From kanterella
Jump to navigation Jump to search
Forwards LER 97-007-00 Re Inadequate Testing of DG Sequencer Control Relay Contacts.Commitments Provided
ML18067A693
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/24/1997
From: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18067A694 List:
References
NUDOCS 9709300374
Download: ML18067A693 (1)


Text

Consumers Ene~

A CMS Energy Comoany Palisades Nuclear Plant Te/.* 616 764 2296 27780 Blue Star Memorial Highway Fax: 616 764 2425 Covert. Ml 49043 Tlloaul* J. l'alllllullo Site Vice President September 24, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT INADEQUATE TESTING OF DIESEL GENERATOR SEQUENCER CONTROL RELAY CONTACTS Licensee Event Report (LER)97-007 is attached. The event is reportable to the NRC per 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by the Palisades Technical Specifications.

SUMMARY

OF COMMITMENTS This letter contains one new commitment and no revisions to existing commitments.

Prior to startup from the 1998 refueling outage, the Technical Specification Test Program wi 11 be revised and testing performed to verify that the 106D-1 /XL and 106D-2/XL relay contacts, which input to block actuation of the SIS-X relays, function as designed. The Technical Specification Test Program revision will assure that the subject relay contacts will be tested on a refueling basis thereafter.

-p~. \

Thomas J. Palmisano Site Vice President CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment Illllll lllll lllll llllll lllll lllll Ill llll

  • ll&OAD*

9709300374 970924 PDR ADOCK 05000255 S PDR